My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1986 - 1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
2300 - Underground Storage Tank Program
>
PR0231136
>
COMPLIANCE INFO 1986 - 1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2019 4:34:40 PM
Creation date
11/5/2018 3:56:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 1998
RECORD_ID
PR0231136
PE
2361
FACILITY_ID
FA0003610
FACILITY_NAME
A&A GAS & FOOD MART
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCO Facility <br />2. <br />3. <br />MONITORING & RESPONSE PLAN- III <br />ARCO PRODUCTS COMPANY FACILITY WITH <br />SINGLE WALL TANKS AND SINGLE WALL LINES <br />Address <br />r <br />DETECTION METHOD <br />Tanks - Monthly Inventory Reconciliation and Annual Tank Integrity Testing in accordance <br />with Sections 2646 and 2643(c)(2)(A) and (B), Article 4, Title 23, CCR. <br />Lines - Automatic Pressure Line Leak Detectors and Annual Line Tightness Testing in <br />accordance with Section 2643 (d)(1) and (3), Article 4, Title 23, CCR. <br />MONITORING EQUIPMENT <br />The Automatic line leak detectors will be maintained and inspected according to the <br />manufacturer's instructions by an outside contractor once during each calendar year. <br />MONITORING PROCEDURE - Inventory Reconciliation <br />Inventory reconciliation will be performed in compliance with the details of Section 2646, <br />Article 4, Title 23, CCR (copy attached and hereby incorporated). <br />A. The daily variation in inventory reconciliation shall be the difference between <br />physically measured inventory in storage and the calculated inventory in storage. <br />B. The physically measured inventory shall be determined at approximately the same time <br />each day by taking liquid level measurement (stick reading) and converting it to <br />gallons using a calibration chart. <br />O The calculated inventory shall be determined at approximately the same time of day for <br />each business day by adding the inputs and subtracting the withdrawals from the <br />physically measured inventory determined the day before. <br />D. These variations shall be summed for a period of one month. Monthly variations <br />exceeding a variation of 1.0 percent of the monthly tank delivery plus 130 gallons <br />must be investigated in accordance with instructions attached. <br />See Exhibit A for reconciliation form. <br />
The URL can be used to link to this page
Your browser does not support the video tag.