My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
140
>
2300 - Underground Storage Tank Program
>
PR0505687
>
INSTALL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2022 2:34:40 PM
Creation date
11/5/2018 4:35:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1995
RECORD_ID
PR0505687
PE
2361
FACILITY_ID
FA0006943
FACILITY_NAME
LATHROP GAS & FOOD INC
STREET_NUMBER
140
Direction
E
STREET_NAME
LATHROP
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19611007
CURRENT_STATUS
01
SITE_LOCATION
140 E LATHROP RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LATHROP\140\PR0505687\INSTALL 1995.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bite Preparation and Installation IOuctions <br /> EMC Basic Monitoring Console efilrco <br /> I. If the tank is buried, excavate the portion of the tank <br /> that contains the riser hole. Ift WARNING: EXPLOSION COULD OCCUR IF <br /> 2. Remove the bung from the hole and install the riser THE MONITOR IS INSTALLED IN A VOLA. <br /> pipe. TILE,COMB USTIBLE OR EXPLOSIVE(CLASS <br /> I I,DIVISION I OR DIVISION Il)ATMOSPHEltE. <br /> WbliNOTE:The top of the riser pipe must be threaded to DO NOT INSTALL THE MONITOR IN A VOLA_ <br /> accept a 4 x S NPT cap adaptor ring;. TILE,COMBUSTIBLE OREXPLOSIVEATMO. <br /> In addition,make sure there will be enough clearance SPHERE. <br /> between the top of the installed riser cap and manhole FAILURE TO COMPLY WITH THESE WARN- <br /> cover to allow room for the two-wire probe cable to INGS COULD RESULT IN DEATH, SERIOUS <br /> protrude from the cap. PERSONAL INJURY, PROPERTY LOSS, AND <br /> 3. Install a standard adaptor ring and riser cap on the EQUIPMENT DAMAGE• <br /> riser pipe. <br /> II.1 NOTE:The cap should be a locking cap, "Evertite" 1. Select a mounting location on the inside wall of any <br /> or equivalent,with a standard ring adaptor.The cap enclosed building. <br /> must be drilled and tapped to receive the furnished a. Be sure the console will be protected from severe <br /> cable grip (see Section 5.B and Section 6.13). vibration, extremes in temperature and humidity, <br /> Kits consisting of a 4-inch cap, adaptor ring and plug rain, and other conditions that could harm the <br /> for the cap are available from Gilbarco Inc. For each equipment, <br /> probe riser,order one Kit Number: Q12588-05. <br /> B.MONITOR LOCATION SELECTION. b• Consider the ease of routing power wiring; conduit <br /> and probe and sensor conduit to the monitor. <br /> FUTI ;WARNING:IMPROPERSYSTEMO7�E: c. Be sure the mounting; surface material is strong <br /> OULD RESULT IN UNDETECTEenough to support the monitor's weight. <br /> TLAL ENVIRONMENTAL AND HEARDS IF THE PROBE-TO-MONIC. POWER WIRING CONDUIT INSTALLATION. <br /> RUNS EXCEED 1000 FEET.RUNS <br /> FEET ARE NOT UL ACCEP'T'ED FOR THIS To the installer: Read and carefully adhere to the instrue- <br /> APPLICATION.PROBE-TO-MONITOR WIRES tions in the following warnings during conduit installation! <br /> MUST NOT EXCEED 1000 FEET. <br /> ."MYI.Yh1Y(IIA r...wwr P• I <br /> LO.YCALTE ilY cuc w[Y[h.\ 1I <br /> MEACrrLOfNrtw ]CpIP GAI►Sf45 U+•Cw1U iAAf� SCOw00ws MA.i l <br /> .\w wrap iuPRrlP Arin]TOaE AwreAa \uN,,;O wllfwrAPal <br /> ITR— WfATMISMOPI wrC 1.Y1.. Ilw <br /> a6llLl AwclYprl W.V11Tni.l+a..r wl I.OL <br /> 6nwrA r.7 Y ..I—1 T." w�C ntt. <br /> I YI cuAl�with <br /> "YWYIYY, <br /> I.O.r x.a <br /> EVb.r St.4 <br /> rFw wAA we <br /> AISLA PI"E"SIDw SRC fS" <br /> iK1VL0 YE]0"Tp 1,AIn[['kf •,.pll w+n40 rllw <br /> Iwf BOIN"PI wIw IEP MArM MSfAO...... ..h.l►1 <br /> lnL AYSLVC SnPul0 M r.'Ip <br /> Tpf 40T DI I.5/E <br /> .wArI►VE IHLM RW fGlPtal <br /> iC..EVull.6 <br /> O.rCTO\IA.GIYTf <br /> �wWE <br /> CAPACI7A]ICE <br /> IAorIE T Aw. <br /> TA.Y\ <br /> ww.w.pSMnr" kale:IMTaI\E ITAi1fllYflmuRla—ftilon II lM lan <br /> ~•r...w w'A.,N n.Y�n Yn.aw..rrl\w ui•nrlar Ou rkol rtyrcn Int W04M IanylA <br /> r.-- u.�. r E � IE.anµr ♦T6"o.. unf wlu u I a' <br /> wrnwarY.Y.r.w r�pr«,�' yrtiW TM1Srdloo lwg d <br /> I I5 NM <br /> 1 P"S+ roan mu.l W 6"lunyal <br /> Ilyn llr min.mum In urwT 4u pr0+lw room <br /> Figure 4. Capacitance Probe Installation Requirements. Figure 5. Magnetostrictive Probe Installation <br /> Requirements. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.