My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
140
>
2300 - Underground Storage Tank Program
>
PR0505687
>
INSTALL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2022 2:34:40 PM
Creation date
11/5/2018 4:35:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1995
RECORD_ID
PR0505687
PE
2361
FACILITY_ID
FA0006943
FACILITY_NAME
LATHROP GAS & FOOD INC
STREET_NUMBER
140
Direction
E
STREET_NAME
LATHROP
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19611007
CURRENT_STATUS
01
SITE_LOCATION
140 E LATHROP RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LATHROP\140\PR0505687\INSTALL 1995.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
filkx3mo Site Preparation and Installation �tructions <br /> EMC Basic Monitoring Console <br /> WARNING: EXPLOSION COULD OCCUR IF Typical Probe Junction Boxes: <br /> jI OTHER WIRES s>FIARL CONDUITS OR <br /> TROUGHS WITH PROBE WIRING.CONDUITS Manufacturer: Appleton Electric Co. <br /> AND WIRING TROUGHS FROM MONITOR- <br /> ING CONSOLEPROI3ESMUSTNOTCONTAIN 1701 W, Wellington Avenue <br /> ANY OTHER WIRES. Ghicaga, IL 60657 <br /> WWARNING: EXPLOSION AND/OR EQUIP- Tel'(312) 327-7200 <br /> MENT DAMAGE COULD OCCUR IF CON. <br /> DUITS DO NOT ENTER THE MONITORING fJescriplion Catalog !Number Quantity <br /> CONSOLE THROUGH THEIR DESIGNATED Junction Box JBDX-75 1 <br /> PREFORMED KNOCKOUTS. <br /> FAILURE TO COMPLY WITH THESE WARN- Cover,Junction Box JBK-B ] <br /> INGS 'COULD RESULT IN DEATH, SERIOUS Gasket,Junction Box JB-GK-V ] <br /> PERSONAL INJURY, PROPERTY LOSS AND <br /> EQUIPMENT DAMAGE, <br /> Manufacturer: Crouse-Hinds Co. <br /> I. Wiring between the Monitoring Console and probes Syracuse, NY 132.21 <br /> limits the electrical power to the probes so that there Tel: (316)477-7000 <br /> is insufficient energy to ignite fuel. To maintain this <br /> safety feature,instal IMonitoring Console's probe wireson Desai ti <br /> in separate conduits from all other wiring, p Catalog Number t]uanlity <br /> Junction Box GRFX-139 ] <br /> IN NOTE: Wiring from separate Monitoring Console <br /> probes may be run in the same conduits or troughs Covet,Junction Box GRF-]0 ] <br /> providing they are powered by the same Monitoring Gasket, Junction Box GASK 643 ] <br /> Console. <br /> CAUTION: IMPROPER SYSTEM OPERATION F. MANHOLE INSTALLATION. <br /> WILL RESULT IF PROBE WIRING FROM SEPA- <br /> RATE EMC BASIC MONITORING CONSOLES <br /> SHARE THE SAME CONDUIT. DO NOT RUN NOTE:Ensure that there is a sufficient amount of <br /> PROBE WIRING FROM SEPARATE MONITOR- gravel under each manhole for proper drainage. <br /> ING CONSOLES IN THE SAME CONDUIT. At each probe location, install a 14-inch minimum diam- <br /> Never run any probe wires in the same conduit eter approved manhole according to the manufacturer's <br /> or trough as power wires! instructions.Offset the probe riser pipes within the man- <br /> holes for ease of junctioninstallation and wiring. <br /> 2. Run conduit from all probe locations to the Monitoring Leave enough space betweenothe junction box and man- <br /> Console location. The conduit layout should be de- hole liner so that the junction box can be removed if <br /> signed to best suit the requirements of the site, and necessary.. <br /> must conform to federal, state and local codes. <br /> Knockouts for 1/2"or 3/4"I.P.S.conduit are provided in G.INTRINSICALLY SAFE WIRING INSTALLATION. <br /> the intrinsically safe area of the Monitoring Console. <br /> You must conform to the National Electrical Code and (See Figure 7, "Typical System Wiring Diagrams.") <br /> state and local codes and consider the number of wires To the installer:Read and carefully adhere to the instruc- <br /> entering the monitor when deciding on the size and tions in the following warnings during intrinsically <br /> number of conduits required for probe and sensor ,_ <br /> wiring. safe wire(field wire) installation! <br /> 3. The conduit must be properly sealed in accordance with �1�, WAIINING:IMPROPER SYSTEMOPERAI'iON <br /> the National Electrical Code(NEPA 70)and the Auto- COULD RESULT IN UNDETECTED POTEN- <br /> motive and Marine Service Station Code (NEPA 30A) TLS-ENv1RONMENTAL AND HEAL'T'H HT1 Z- <br /> since they pass from a Class 1,Division I or Division fI ARDS IF THE PROBE-TO-1VIONITOR WIRE <br /> area into a nonhazardous area. RUNS EXCELll 1UOU FEET.RUNS OVER lUUU <br /> FEET ARE NOT UL ACCEPTED <br /> R THIS <br /> E. PROBE JUNCTION BOX INSTALLATION. APPLICATION.PROBE-TO-MONITOR WIRES <br /> 1. Install a weatherproof electrical junction box with MUST NOT EXCEED 1000 FEET. <br /> Basketed cover on the end of each probe conduit run at <br /> the manhole or monitoring well location. Gasketin6 or WARNING. EXPLOSION COULD OCCUR IF <br /> sealing compound must be used at each entry to the '11r OTHER WIRES SHARE CONDUITS Oft <br /> junction box to ensure a waterproof junction. The TROUGHS WITHPROBE WIRING,CONDUITS <br /> interior of each junction box must be a minimum of 16 AND WINING TROUGHS FROIVI EMC BASIC <br /> cubic inches. Use one of the approved units shown in MONITORING CONSOLE PROBES MUST NOT <br /> the following listing or an equivalent unit. CONTAIN ANY OTHER WIRES. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.