My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
140
>
2300 - Underground Storage Tank Program
>
PR0505687
>
INSTALL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2022 2:34:40 PM
Creation date
11/5/2018 4:35:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1995
RECORD_ID
PR0505687
PE
2361
FACILITY_ID
FA0006943
FACILITY_NAME
LATHROP GAS & FOOD INC
STREET_NUMBER
140
Direction
E
STREET_NAME
LATHROP
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19611007
CURRENT_STATUS
01
SITE_LOCATION
140 E LATHROP RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LATHROP\140\PR0505687\INSTALL 1995.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SYt eparation and Installation Instru ns <br /> Easic Monitoring Console <br /> 3. Install a water-tight cable bushing in the 3/8"threaded 3. Be sure there is no sludge in the bottom of the tank. <br /> hole in the top of the cap. Use an appropriate thread Sludge can clog the water-entry hole near the bottom ofr <br /> sealant to ensure water-tightness.Also install a water- <br /> tight cable bushing in the probe junction box in a a capacitance probe, resulting in inaccurate watP- <br /> similar manner, height readings from the probe. <br /> C:';ZIVSTAI.LATION, 4. Attach the probe cable connector to the mating plug on <br /> Iristall each probe as follows(see Fi N p the top of the probe. Be sure the connector is attached <br /> re 32 Ca acitance securely by hand tightening the locking ri <br /> Probe Installation Requirements") ng. <br /> 5. Carefully lower probe into the riser pipe until it gently <br /> Ift E:11N <br /> NG: TO AVOID ELECTRICAL SHOCK touches the bottom. <br /> COULD KILL YOU, BE SURE AC CAUTION: HANDLE PROBE CAREFULL <br /> TO THE MONITOR IS OFF D11RIN0 STRIKINGORDROPPINGPROBEWILI,RESULTI <br /> LATION, IN LOSS OF CALIBRATION AND COULD CAUSE <br /> PERMANENT DAMAGE. <br /> �..;"""°" 6. Feed the two-wire probe cable(furnished with each probe) <br /> nU[ <br /> [uNcaE r!SL"2 <br /> on+'•�•EpE.a... up through the cap bushing and in <br /> Ra,a. aa 7CONpCalr3ENS usthrough the junction <br /> box bushing.Leave enough slack in the cable between the <br /> cap and junction box to allow the cap to easily reach the <br /> . riser pipe.In addition,leave enough�EMW '•moo wE"rnlwnaq -� slack under the riser <br /> IEiu ,_ur.crwNm.wiN cap to permit corulection to the probe and to allow the <br /> C.wW w.n Nhl rN19 <br /> probe to rest on the bottom of the tw1k. <br /> 7. Using wiring nuts, connect the wires from the probe <br /> "IErI pNENS�On 'lEC <br /> swu.oeEm Ea 2..ftwLE cable to the probe field wires in the junction box (see <br /> Eaorrcw ar suwrNp rrr. <br /> Figure 33, '"Two-Wire Probe Field WiringDia <br /> scrI[pv�E 0 <br /> "" Be sure to observe proper polarity betwen the probe <br /> IC + <br /> and monitor wiring during installation. <br /> VVEATHEAPROOF <br /> Ju CTrONBOX <br /> e.2."ararrn <br /> rade r"oat 12 RIGID ,PEA PROBEI <br /> CONDUIT <br /> BIY <br /> TO <br /> MONITOR FROM <br /> PROBE <br /> • <br /> # wnI <br /> MpN:rnCruN2ntl mrumum 4irlWwmillbe tarl2 <br /> aam.l0 61002ml r 111cn iM probe Iangm. <br /> [E+ImpN.A 7'0'dia Iana INN uM an 0' <br /> probe.Tlr aaira probe rwgnl wolbe lOElyW - <br /> in 11M near pipe,wnKn mull be 6-I a ge, Figure 33. Two-Wire Probe Field Wiring Diagram. <br /> Iran IIN mwmum in orber a prprwa roprn <br /> 8. Seal wire nuts with epoxy sealant using one bag for two <br /> Figure32. Capacitance Probe Installation Requirements. wire nut connections. (Refer to Figure 24, ".Epoxy <br /> I.Turn OFF power to the Monitoring Console. Sealant for Two-Wire Connections.") <br /> CAUTION: DO NOT INSTALL THE PROBE IF <br /> CAUTION, IF MORE THAN TWO WIRE NUT <br /> ANY LIQUID OTHER THAN THE PRODUCT I Y CONNECTIONS SHARE AN EPDXY SEALANT <br /> BE DISPENSED H R THE TANK. FAILURE TO ERLY SEA-LED. IMPROPER SEALING BAG, !'I-IE CONNECTIONS WILLNOTBEPROP- <br /> F THE <br /> COMPLY CAN RESULT IN EQUIPMENT DAM- CONNECTIONS WI LRESU TININACCOURATE <br /> AGE,INACCURATE INVENTORY CONTROL,OR PROBE READINGS AND POSSIBLY FALSE <br /> UNDETECTED POTENTIAL ENVIRONMENTAL ALARM CONDITIONS. <br /> AND HEALTH HAZARDS. <br /> 2. Make sure any liquid other than the product to be <br /> dispensed has been pumped out of the tank. <br /> CAUTION: CAPACITANCE PROBES CONTAIN <br /> A GLASS CYLINDER WHICH CAN BE BROKEN <br /> IF THE PROBES ARE DROPPED OR STRUCK <br /> DURING HANDLING AND INSTALLATION, ' <br /> PROBES ARE SENSITIVE MEASURING DE- <br /> VICES AND SHOULD BE HANDLED CAREFULLY <br /> AT ALL TIMES. <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.