My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
140
>
2300 - Underground Storage Tank Program
>
PR0505687
>
INSTALL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2022 2:34:40 PM
Creation date
11/5/2018 4:35:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1995
RECORD_ID
PR0505687
PE
2361
FACILITY_ID
FA0006943
FACILITY_NAME
LATHROP GAS & FOOD INC
STREET_NUMBER
140
Direction
E
STREET_NAME
LATHROP
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19611007
CURRENT_STATUS
01
SITE_LOCATION
140 E LATHROP RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LATHROP\140\PR0505687\INSTALL 1995.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 P W 6 S0 ( I� Rfi ! l. 1. P` 1t <br /> EVE T 1 0 N <br /> V L E S <br /> 61SO Two Point 61SOC Coaxial, fi1SOP Poppetecl Coaxial <br /> The OPW 61SO is available in two The OPW 61 SOC is available I-or <br /> The s avJable for <br /> Styles for two point fill,separate prod- coaxial till,single productJvapor con- poppetedl i i I�j 1 lapplications and is <br /> uct and vapor co+replaces application~, nectiun applications. This member of CA RB certified for gasuline vapor <br /> The OPW 6150 replaces the stand.trd the series replaces the st.indard coaxial recovery tiystcros. Executive order <br /> till tube in the 4"tank riser pipe. in 1111 drop tube in the 4" tank riser pipe. G-70-52AN. <br /> addition, the 61SOM is available and <br /> designed for compatibility with M-tis <br /> and M-100 methanol fuels. Both the <br /> OPW 61SO and 61SOM are available <br /> with sealed vapor paths for use in <br /> GARB certified areas.The OPW 61 SO- <br /> 1000 features a groove that runs the gull <br /> length of the tube to allow a gauging <br /> system to be used in conjunction with <br /> the overfill prevention system. <br /> I � <br /> Actuating Flout <br /> 61SOR Remote 61SO-Y Two Point 61SO-4BYT <br /> The OPW 61SOR is designed for two Designed for use with two point fill The OPW 61 SO-413 YT provides the <br /> point remote till applications, where the applications, the 013W 6l SO-3000 sane operation as all other 6ISO over- <br /> 1111 point is not directly over the UST. replaces the drop tube in 3" tank riser fill preventiott valves but features the <br /> The 61 SOR enables sticking of the pipes. <br /> tank. valve only. Shipped without chop tubes, <br /> alae 61 SO-413YT is designed to adapt to <br /> existing coaxial and conventional chop <br /> tubes that meet specilic OPW stan- <br /> dards. <br /> 'I <br /> I I, <br />
The URL can be used to link to this page
Your browser does not support the video tag.