Laserfiche WebLink
efilbarco Site PreparatidllVmd.Installation Instructions <br /> EMC.Basic MdWoring Console <br /> TABLE OF CONTENTS <br /> SECTION I. INTRODUCTION SECTION 5. MAGNETOSTRICTIVE PROBE ' <br /> A. General............................................ 1 INSTALLATION <br /> B. Damage Claims.........................................................1 A. Tank Diameter Measurement.................. <br /> C. Return Shipping ......................................................1 B ............. 13 <br /> ' Riser Cap Preparation........................................... 13 <br /> C. Probe Riser Adaptor Installation................. <br /> SECTION 2. PRODUCT DESCRIPTION """"' 15 <br /> D. Float Assemblies............................... <br /> A. Monitor. 1 <br /> E. Probe Installation in Underground <br /> B. Probes........................................................................1 Storage Tanks.................,.,............,.....,,................ 16 <br /> F. Probe Installation in Aboveground <br /> SECTION 3. SITE PREPARATION Storage Tanks........................................................ 17 <br /> SECTION 6. CAPACITANCE PROBE <br /> A. Probe Riser Pipe Installation................................ 1 INSTALLATION <br /> B. Monitor Location Selection .................. <br /> C. Power Wiring Conduit Installation .................. 5 A. Tank Diameter Measurement............................... <br /> Probe Wiring Conduit Installation 19 <br /> ' •.••......................6 B. Riser Pipe Cap Preparation 19 <br /> E. Probe Junction Box Installation """"""'•"""""""""" <br /> ..............................7 C. Installation ...,........,....... 20 <br /> F. Manhole Installation <br /> .7 <br /> G. Intrinsically Safe Wiring Installation .....................7 APPENDIX A. WIRING RECORD— <br /> H. Power Wire Installation ...........................................8 INTRINSICALLY SAFE <br /> AREA......22 <br /> SECTION 4. MONITORING CONSOLE <br /> INSTALLATION <br /> A. Mounting............................ .....8 <br /> B. General Wiring Practices.................................... 8 <br /> C. Connector Positions and Labeling.........................11 <br /> D. Power Wiring Connections.....................................11 <br /> E. Probe Wiring Connections............. ..........11 <br /> F. External Input Wiring............................................12 <br /> G. EIA RS-232 Interfaces....................... .................12 <br />