Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Page I at 2) <br /> TYPE OF ACTION 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION 490'1 <br /> PLAN TYPE fl[ 1 MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> (Check one item only) ❑ Z THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S) <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1 <br /> BUSINESS NAME(Same as FACILITY NAME) G fdt�f��i Sn✓e l t� 3 <br /> BUSINESS SITE ADDRESS/ZGfd 4,f"e IV 103 CITY) �,fr <br /> IL EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> (23 CCR'2632,2634,2638,264 1) <br /> x90-3a <br /> MONITORING EQUIPMENT IS SERVICED ❑ 1.ANNUALLY ❑ 99.OTHER(Specify): 490-3b <br /> III.MONITORING LOCATIONS <br /> ❑ 1.NFNN'SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN.❑2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 263.4),1vo_I <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> I CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490.5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: Ly a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490"6 <br /> PANEL MANUFACTURERS - / _/Gd - - - M - � <br /> 490-7 �""- --__ <br /> 490-$ <br /> LEAK SENSOR MANUFACTURER: - - - --------__ . <br /> /, d a9o_9. MODEL#(S): 1A7r� <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM 1JSED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: a9a12. M_ ODEL#: 490-13 <br /> --- - - ----------------------- ----------------- ---------- ------------- -------------------- - -- -_ <br /> -- 490-14.-"-IN-TANK PROBE MANUFACTURER_,---__-"----�--_-_ _ MODEL#(S): 490-I5----- <br /> ------------- --- <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS --"- - ,WEEKLY <br /> -49fC <br /> Q ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY <br /> ------ --- _ El-d.-MONTHLY ❑ e.OTHER(Specify): 490-17 <br /> - - - - -- -- ---- - ------- - - ----- - - -- --- <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. 490.1$ <br /> g.p.h. g.p.h. ❑ c.OTHER(Specify): 490-I9 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> ❑ 4,WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490.21 <br /> 490-22 <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 49x23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-24 <br /> 490-25 <br /> ❑99.OTHER (Specify): 490-26 <br /> 490-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> CN I.CONTINUOUS MONITORING OF PIPE)PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28 <br /> VAUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:XDRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 490-29 <br /> T490.30 1 <br /> PANEL MANUFACTURER: r- fir f�,yY" I MODEL#: �' �j 5rj T 490 31 <br /> LEAK SENSOR MANUFACTURER: 1 _ 440"32 -MODEL#(S): 490-31 <br /> - -- - -- - - -- -- - - 0 L _-----""---- <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN, ❑a.YES ❑N NO 490-34 <br /> FAILUREMISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490-35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS PETECTED(23 CCR 12636) 490-36 <br /> MLLD MANUFACTURER(S): !fir r -- 493-37 MODEL#(S): y� d� a9o_a$ <br /> ❑ 3,ELECTRONIC LINE LEAK DETECTOR LLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490-39 <br /> ELLD MANUFACTURER(S) 490-x0 MODEL#(S) 490-41 <br /> ---- - - ---- --- - - --- - - - -_--- <br /> PROGRAMMED IN LINE LEAK TEST: ❑ L MINIMUM MONTHLY 0.2 g.p.h. ❑ 2-MINIMUM ANNUAL 0.1 g.p.h- 450-42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490-43 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b,NO 490-44 <br /> ❑ 4.PIPE INTEGRITY TESTING 49045 <br /> TEST FREQUENCY ❑ a,ANNUALLY ❑ b,EVERY 3 YEARS ❑ c.OTHER(Specify) 490-46490-47 <br /> ❑ 5.VISUAL PIPE MONITORING. <br /> x90-4$ <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY 8r EACH TIME SYSTEM OPERATED' 49049 <br /> "Allawvd for rnontton of mbuned emergency enerator Fuel pipmg only er HSC§252$1 5(by(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)]. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490.51 <br /> ❑ 99.OTHER(Specify) 490-52 <br /> 490-53 <br /> UPCF UST-D(1212007)114 <br />