Laserfiche WebLink
0 <br />SWRCB, January 2002 <br />`J <br />r.wromn nnwrm A YVMFNTfTj"r1 TRCTIrNG <br />Page _ of <br />Test Method Developed By: ❑ UDC Manufacturer i , Industry Standard X Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum X Hydrostatic <br />Ll Other (Spec) <br />Test Equipment Used: Caldwell Level <br />Change Indicator <br />Equipment Resolution: .002 <br />UDC#1&2 <br />UDC#3&4 <br />&6 <br />UDC#7&8 <br />UDC Manufacturer: <br />Bravo <br />Coated Steel <br />Bravo <br />Coated Steel <br />teel <br />Bravo <br />Coated Steel <br />UDC Material: <br />rEnters <br />9" <br />UDC Depth: <br />Height from UDC Bottom to Top <br />9" <br />Enters from bottom <br />9" <br />Enters from bottom <br />om bottom <br />Enters from bottom <br />of Highest PipinPenetration: <br />Height from UDC Bottom to <br />Enters from ­­bottomEnters <br />from bottom <br />Enters from bottom <br />Enters from bottom <br />Lowest Electrical Penetration: <br />Dry <br />Dry <br />Condition of UDC prior to <br />Dry <br />Dry <br />testing: <br />Portion of UDC Tested <br />Water Level 8" <br />Water Level 8" <br />Water Level 8" <br />Water Level 8" <br />Does turbine shut down when <br />No <br />UDC sensor detects liquid (both <br />No <br />No <br />No <br />and water)?* <br />product <br />Turbine shutdown response time <br />N/A <br />N/A <br />N/A <br />N/A <br />Is system programmed for fail- <br />Yes <br />Yes <br />Yes <br />Yes <br />safe shutdown? <br />Was fail-safe verified to be <br />No <br />No <br />No <br />No <br />operational?* <br />Wait time between applying <br />5 Minutes <br />5 Minutes <br />5 Minutes <br />5 Minutes <br />water and starting test <br />12:25 <br />12:20 <br />12:35 <br />12:45 <br />Test Start Time: <br />.001 <br />Initial Reading(Ri): <br />.001 <br />.001 <br />.001 <br />1:05 <br />1:15 <br />Test End Time: <br />12:55 <br />12:50 <br />Final Reading (RF): <br />.001 <br />.001 <br />.001 <br />.001 <br />Test Duration: <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />Chan e in ReadingRF-R/): <br />Pass/Fail Threshold or Criteria: <br />0 <br />.005/30 Minutes <br />0 <br />.005/30 Minutes <br />0 <br />.005/30 Minutes <br />0 <br />.005/30 Minutes <br />Test Result: <br />Pass <br />Pass <br />Pass" <br />Pass <br />Was sensor removed for testing? <br />*NA <br />*NA <br />*NA <br />*NA <br />Was sensor properly replaced and <br />*N/A <br />*N/A <br />*N/A <br />*N/A <br />verified functional after testin ? <br />11 <br />Comments — (include information on repairs made prior to testing, and recommended jotlow-up.jorjauea resrs� <br />*Bravo System Float & Chain for Fire Valve shut off only. No Liquid Sensors in UDC's. <br />j <br />MICt(1hI1t EW <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to anv of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />