My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2014 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
140
>
2300 - Underground Storage Tank Program
>
PR0505687
>
COMPLIANCE INFO 2014 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2022 1:43:39 PM
Creation date
11/5/2018 4:43:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014 - 2015
RECORD_ID
PR0505687
PE
2361
FACILITY_ID
FA0006943
FACILITY_NAME
LATHROP GAS & FOOD INC
STREET_NUMBER
140
Direction
E
STREET_NAME
LATHROP
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19611007
CURRENT_STATUS
01
SITE_LOCATION
140 E LATHROP RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LATHROP\140\PR0505687\COMPLIANCE INFO 2014 - 2015.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nov 06 14 04:14p Elib IV Contactors 120946342 p.4 <br />UST SYSTEM RETROFIT OR REP "SIR RECEIVED <br />(Submit minimum of 3 sets of plans & applications as originals wil be retained by EHDP V 0201 <br />1. Site map enclosed? YES[] N0 ENVI'RC}, <br />A HFA TH <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all rn: nufacturer training certificates for iia r <br />person installing or testing any component that is repaired or replaced. Ensw a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed_ List components to be repairer: i • replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a cornpo! ent, describe how this will be done. (If <br />adding piping, UDC's, or other UST equipment, or performing tank top upgn)( use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): <br />4. List of equipment to be used (Attach manufacturer's specification sheets sho+s/i g third -party approval): <br />ca <br />
The URL can be used to link to this page
Your browser does not support the video tag.