Laserfiche WebLink
Please be sure to send the required documentation to the R E C E \�!/ E D <br /> facility for their records(our inspector will verify it during <br /> the next routine inspection), please also provide your OCT 1 2 2017 <br /> functionality testing verification report to EHD 30 days from <br /> your cold start. Please don't hesitate to call me if you have <br /> ENVIRONMENTAL HEALTH <br /> any questions. ,! <br /> SAN 1 O A Q U 1 �PEPARTMENT <br /> Sincerely, �\ <br /> —COUNTY— <br /> Elena K. Manzo, Lead Sr. REHS, <br /> San Joaquin County <br /> Environmental Health Department <br /> 1868 E. Hazelton Ave. <br /> Stockton, CA 95205-6232 <br /> Voice: (209) 953-7699 <br /> From: Shawn Murray [mailto:shawn.m@waltonensineerin¢.com] <br /> Sent:Wednesday, September 13, 2017 2:39 PM <br /> To: EH-UST<ust@sicehd.com> <br /> Cc:Walton Service<service@waltoneneineerin¢.com> <br /> Subject:Colonial Energy site 40135 192 Lathrop Ave. <br /> Good Afternoon, <br /> On 9/19 we will be performing a software upgrade on the Veeder Root ECPU that requires a cold <br /> start. <br /> Thanks <br /> Shawn Murray <br /> Service Department <br /> Walton Engineering, Inc. <br /> 3900 Commerce Drive <br /> West Sacramento, CA 95691 <br /> PH: 916-373-1161 <br /> FAX: 916-373-1171 <br /> 2 <br />