Laserfiche WebLink
J <br /> MONITORING SYSTEM CERTIFIC <br /> CERTIFICATION / TEST DATE: January03, 2018 <br /> Al. FACILITY A2. OWNER e �y�(R�IVNIENTA HEr�L� <br /> Name Colonial Energy#40135 Name Colonial Ener //��pp--{{kk//�� IIS�I� <br /> Address 192 Lathrop Road,Lathrop,CA 95330 Address 2860 N.Santiago Blvd.2ndORPOtxaAge U 92867 <br /> Phone# 209-858-4998 phone# 714-761-5426 <br /> Contact Station Manager Contact Victor Hassan <br /> F. IN-TANK GAUGING/SIR EQUIPMENT: ■ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gaugung equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No' Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H below, describe how and when these deficiencies were or will be corrected. <br /> G. LINE LEAK DETECTORS (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ■ Yes ❑ No` For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> _ ❑ NIA (check ail that apply) Simulated leak rate: ■ 3g.p.h.; ❑ 0.1 g.p.h.; ❑ 0.2 g.p.h. <br /> ■ Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ■ Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ■ NIA <br /> ■ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> [I NIA <br /> ■ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> E] NIA or disconnected? <br /> ■ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ❑ NIA or fails a test? * <br /> ■ Yes ❑ No* For electronic LLD%have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ■ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H below, describe how and when these deficiencies were or will be corrected. <br /> H. COMMENTS <br /> R:2017 Walton Engineering,Inc. <br /> Page 3 of 3 <br />