My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
192
>
2300 - Underground Storage Tank Program
>
PR0505867
>
COMPLIANCE INFO 2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:19 PM
Creation date
11/5/2018 4:46:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2015
RECORD_ID
PR0505867
PE
2361
FACILITY_ID
FA0007059
STREET_NUMBER
192
STREET_NAME
LATHROP
STREET_TYPE
Rd
City
Lathrop
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
192 Lathrop Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LATHROP\192\PR0505867\COMPLIANCE INFO 2013-2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• - www.opwT166al.com <br />Materials <br />Valve body: Cast aluminum <br />Float: Nitrile rubber, closed cell foam <br />Valve: Aluminum <br />Seals: Viton® <br />Upper & lower Drop Tube: Aluminum <br />Plastic parts: Acetal <br />Hardware: Stainless steel <br />Features <br />♦ Simple, Easy and Quick Installation - <br />no excavation or special manholes <br />required. <br />♦ Economical - costs a fraction of <br />expensive, complicated and difficult - <br />to -install valves. <br />♦ Furnished Complete - supplied <br />with new upper and lower drop tubes, <br />mounting hardware and thorough <br />instructions for quick job site time. <br />♦ Completely Automatic Operation - no <br />prechecks to perform, no resets and no <br />overrides to be broken or abused. <br />♦ No Pressurization of the Tank - <br />operates directly from liquid level. <br />♦ Will Accept a Dipstick for Gauging <br />Important <br />In order to prevent product <br />spillage from the Underground <br />Storage Tank (UST), properly <br />maintained delivery equipment <br />and a proper connection al the <br />tight -fill adaptor are essential. <br />Delivery personnel should be <br />managed and trained to inspect <br />delivery elbows and hoses for <br />damaged and missing parts. <br />They should always make <br />certain there is a positive <br />connection between the adaptor <br />and elbow. If delivery equipment <br />is not properly maintained, or the <br />elbow is not securely coupled <br />to the adaptor, a serious spill <br />may result when the DPW 71SO <br />closes, causing a hazard and <br />environmental contamination. <br />NOTE: The DPW 71SO is <br />designed for use on tight -fill <br />gravity drop applications only. <br />Do not use for pressure fill <br />applications. <br />♦ Retrofits Directly - for both new and <br />existing tanks with 4" fill risers. <br />♦ Quick Drain Feature - automatically <br />drains hose when head pressure is <br />relieved. <br />♦ Best Flow Rate in The Industry' <br />Advantages of overfill Prevention <br />Compared to Overfill Warning Systems: <br />♦ Completely Automatic Operation <br />- does not rely on the alertness or <br />speed of response of the delivery <br />attendant for certainty of overfill <br />prevention. <br />♦ Keeps the Top of UST "Dry," per <br />EPA Requirements - eliminating <br />possible leaks at loose bung fittings <br />and the need for double containment <br />on vent lines. <br />All, Does Not Rely on Pressure in the <br />UST to Stop Flow - allowing faster fill <br />times and reducing spill risk. <br />Listings and <br />Certifications Banes USC <br />Resources Board <br />♦ Speeds Delivery Operations - <br />product flows unimpeded into the tank <br />until the hose "kick" that accompanies <br />the valve shut-off provides a clear <br />signal that the liquid has reached the <br />shut-off level. <br />♦ Simple and Inexpensive Installation - <br />in both two-point and coaxial fill <br />applications, no additional excavation, <br />manholes or vent piping are required. <br />Look for this label for <br />111111NIMMM authentic OPWEVR <br />Approved products. <br />nw� <br />• <br />OPW 71 SO Overfill <br />Prevention Valves <br />The CARB-certified OPW 71 SO <br />vapor -tight Overfill Prevention Valve <br />is designed to prevent the overfill of <br />underground storage tanks by providing <br />a positive shut-off of product delivery. <br />The shut-off valve is an integral part of <br />the drop tube used for gravity filling. <br />The OPW 7150 allows easy installation <br />(without breaking concrete) and requires <br />no special manholes. <br />The OPW 71 SO is a vapor -tight two- <br />stage shut-off valve. When the liquid <br />level rises to about 95% of tank capacity, <br />the valve mechanism is released, <br />closing automatically with the flow. This <br />reduces the flow rate to approximately <br />5 gpm through a bypass valve. The <br />operator may then stop the filling <br />process and disconnect and drain the <br />delivery hose. As long as the liquid <br />exceeds the 95% level, the valve will <br />close automatically each time delivery <br />is attempted. <br />If the delivery is not stopped and <br />the liquid rises to about 98% of tank <br />capacity, the bypass valve closes <br />completely. No additional liquid can flow <br />into the tank until the level drops below <br />a reset point. <br />NOTE: The 71SO Overfill Prevention <br />Valve can be adjusted to shutoff at any <br />desired tank capacity. Please contact <br />the Authority Having Jurisdiction (AHJ) <br />and review local, state, and national <br />codes to determine the regulatory <br />requirements governing shut-off <br />capacity in your region, as well as <br />take into account other considerations <br />such as extreme tank tilt. In all cases, <br />the upper tube must protrude into the <br />tank at least 6 1/2" to ensure that the <br />valve can shut off flow into the tank <br />completely before the top of the tank <br />is wetted as per EPA requirements. <br />7150 Instruction Sheet Order <br />Number: H15524PA <br />102 9393 Princeton -Glendale Road ♦ Hamilton,Ohio USA45011 ♦ Phone: (800) 422-2525 • Fax: (800) 421-3297 02013 OPW Fueling Components <br />
The URL can be used to link to this page
Your browser does not support the video tag.