Laserfiche WebLink
MONITMING SYSTEM CERTIFWATION <br />CERTIFICATION /TEST DATE: March 5, 2014 <br />Al. FACILITY <br />Name Tower Mart # 104 <br />Address 192 Lathrop Road, Lathrop, CA 95330 <br />Phone # 209-858-4998 <br />Contact Desiz Burns <br />A2. OWNER <br />Name Tower Energy Group, Inc. <br />Address 1983 West 190th Street, Torrance, CA 90504 <br />Phone # 916-285-7402 ext 100 <br />Contact Mark Vasey <br />F. IN -TANK GAUGING / SIR EQUIPMENT: ■ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gaugung equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ Yes ❑ No * Has all input wiring been Inspected for proper entry and termination, Including testing for ground faults? <br />❑ Yes <br />❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ No* Was accuracy of system product level readings tested? <br />❑ Yes <br />❑ No * Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ No * Were all probes reinstalled properly? <br />❑ Yes <br />❑ No* Were all Items on the equipment manufacturer's maintenance checklist completed? <br />In Section H below, describe how and when these deficiencies were or will be corrected. <br />G. LINE LEAK DETECTORS (LLD): ❑ Check this box if LLDs are not Installed. <br />Complete the following checklist: <br />❑ Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ N/A (check all that apply) Simulated leak rate: ■ 3 g.p.h.; ❑ 0.1 g.p.h.; ❑ 0.2 g.p.h. <br />❑ Yes ❑ No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br />_ <br />❑ Yes ❑ No* <br />Was the testing apparatus properly calibrated? <br />❑ Yes ❑ No* <br />❑ NIA <br />For mechanical LLDs, does the LLD restrict product flow If It detects a leak? <br />❑ Yes <br />❑ No* <br />❑ NIA <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ Yes <br />❑ No* <br />❑ NIA <br />For electronic LLD9, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />or disconnected? <br />❑ Yes <br />❑ No * <br />❑ NIA <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />or fails a test? <br />❑ Yes <br />❑ No * <br />❑ NIA <br />For electronic LLD9, have all accessible wiring connections been visually Inspected? <br />❑ Yes <br />❑ No- <br />Were all Items on the equipment manufacturees maintenance checklist completed? <br />' In Section H below, describe how and when these deficiencies were or will be corrected. <br />H. COMMENTS <br />Page 3 of 3 <br />