Laserfiche WebLink
' IED PROGRAM CONSOLIDATED FORAk <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- (Page I of 2 <br /> 490-1. <br /> TYPE OF ACTION ❑ L NEW PLAN N 2.CHANGE OF INFORMATION 490 z <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTS AT THIS FACILITY. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): h9 <br /> L'FACILITY'INFORMATION <br /> I'vii, _ .'- <br /> FACILITY ID#(Agency Use Only) - <br /> 3. <br /> BUSINESS NAME(Same as Facility Name m a Tower Mart #104 <br /> 103. CRY 104. <br /> BUSINESS SUE ADDRESS 192 Lathrop Rd. Lathrop, CA 95330 <br /> 11. EQUIPMENTTESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be perfomled at the frequency specified <br /> b the u] men[manufacturers'instructions,or annually,whichever is more frequent Such work must be performed by qualified personnel[z3 ccR 4?612.2634,2639.490 30-. <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(Specify) 490 3b. <br /> III. MONITORING LOCATIONS 4904.' <br /> ❑ L NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ® 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,26341 <br /> (Check all <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) That a I , <br /> ® I.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACES)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[v CCR§2632,26341 <br /> d904i. <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑49-- <br /> MODEL 490.8 <br /> PANEL MANUFACTURER: Vedder-Root #: TLS 350❑ d.UNDER VACUUM <br /> 491-9MODEL#(S):0794390-420 ago-lo. <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 490.11. <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR9IN EAMK(Sl.[23 cert 32643] 491-U. <br /> 491-12. MODELM <br /> PANEL MANUFACTURER: 490.14 490-15. <br /> IN-TANK PROBE MANUFACTURER: MODEL#(S): <br /> 490.16. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILYMIGHTLY 11 c.WEEKLY 49x17 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-18. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. Elb.02 g.p.h. 114 <br /> e.OTHER(Specify): 49x19. <br /> 90-20. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§2646.1] TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 49o-u21. <br /> C34.WEEKLY MANUAL TANK GAUGING(MTG)[23 CCR§26451 490.23. <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR§2643.11 490.24. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ e.OTHER(Specify): .,,,__ ..... 490-25. <br /> ..... 490-26. <br /> 490-27. <br /> ❑ 99 OTHER(Specify) - :(Check all <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) thata / <br /> ® L CONTINUOUS MONITORING OF PIPETIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. <br /> 490-28. <br /> [21 CCR SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM a 1-21. <br /> §2636] 490.30. MODEL#: TLS 350 <br /> PANEL MANUFACTURER:Veeder-Root 490-32. 1- <br /> LEAK SENSORMANUFACTIIRER: Veeder-Root MODEL# 794390-420 <br /> a.YES ❑ b.NO 4W34- <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ® 490.35. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490 36 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MELD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TEST'S AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK 1S DETECTED.123 CCR§26361 890-37. MODEL#(S): 491-3a. <br /> MELD MANUFACTURER(S): 491-39. <br /> ® 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§26361 490.41 <br /> ELLD MANUFACTURER(S):Veeder-Root 411- MODEL#(S): 0848980-001 <br /> 490-02. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 490-03. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO <br /> ® a.YES ❑ b.NO 490-04' <br /> ELLD FAILUREIDISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. 490-45. <br /> ❑ 4.PIPE INTEGRITY TESTING. 490-06. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) ... 890-4z <br /> 490-09. <br /> ❑ 5.VISUAL PIPE MONITORING. OPERATED. 490-49. <br /> FREQUENCY: ❑ a.DAILY C3 b.WEEKLY Allowed rm monams ran <br /> b.ied emr.0-EACH <br /> IDV gorily xHSC§§2TIME SYSTEM <br /> 815mi) <br /> 490.50. <br /> -ff 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(e)43)1 490-91. <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. -490-92. <br /> 490.53. <br /> ❑ <br /> 99.OTHER(Specify) <br /> UPCF UST-D(12/2007)-1/4 www.unidocs.org <br />