Laserfiche WebLink
IED PROGRAM CONSOLIDATED FO 1*D Sl tog-59 <br /> TANKS <br /> UNDERGROUND STORAGE TANKS - TANK PAGE 2 <br /> Pae of <br /> VI..PIPING CONSTRUCTION check allthau ly) <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SYSTEM TYPE ❑1.PRESSURE .SUCTION ❑3.GRAVITY 458. 1 ❑1.PRESSURE ❑2.SUCTION ❑3.GRAVITY 459, <br /> CONSTRUCTION/ 1.SINGWALL ❑3.LINED TRENCH ❑99.OTHER 4611 ❑1.SINGLE WALL ❑95.UNKNOWN 462. <br /> MANUFACTURER ,DOUBLLE E WALL [195.UNKNOWN ❑2.DOUBLE WALL ❑99.OTHER <br /> MANUFACTURER <br /> 461. MANUFACTURER 463. <br /> ❑1.BARE STEEL [16.FRP COMPATIBLE W/100%METHANOL ❑1.BARE STEEL ❑6.FRP COMPATIBLE W1100%METHANOL <br /> ❑2.STAINLESS STEEL ❑7.GALVANIZED STEEL ❑2.STAINLESS STEEL ❑7.GALVANIZED STEEL <br /> ❑3.P ASTIC COMPATIBLE WITH CONTENTS ❑95.UNKNOWN ❑3.PLASTIC COMPATIBLE W/CONTENTS ❑S.FLEXIBLE(HDPE) ❑99.OTHER <br /> 4 FIBERGLASS ❑8.FLEXIBLE(HDPE) ❑99.OTHER ❑4.FIBERGLASS ❑9.CATHODIC PROTECTION <br /> ❑5.STEEL W/COATING [19.CATHODIC PROTECTION 464. ❑5.STEEL W/COATING [195.UNKNOWN 465. <br /> VII.PIPING LEAK DETECTION(Check all that apply) A dacriptioo tithe niwdnx program shall be submitted to the Iocel menryJ <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SINGLE WALL PIPING 466. SINGLE WALL PIPING 467, <br /> PRESSURIZED PIPING(Check all that apply): PRESSURIZED PIPING(Check all that apply): <br /> ❑1. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP [11. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP <br /> SHUT-OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION SHUT OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION <br /> +AUDIBLE AND VISUAL ALARMS. +AUDIBLE AND VISUAL ALARMS. <br /> [12. MONTHLY 0.2 GPH TEST [12. MONTHLY 0.2 GPH TEST <br /> [13. ANNUAL INTEGRITY TEST(0.1 GPH) [13. ANNUAL INTEGRITY TEST(0.1 GPM <br /> [14. DAILY VISUAL CHECK <br /> CONVENTIONAL SUCTION SYSTEMS CONVENTIONAL SUCTION SYSTEMS(Check all that apply) <br /> ❑5. DAILY VISUAL MONITORING OF PUMPING SYSTEM+TRIENNIAL PIPING 05. DAILY VISUAL MONITORING OF PIPING AND PUMPING SYSTEM <br /> INTEGRITY TEST(0.1 GPH) <br /> SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): [16. TRIENNIAL INTEGRITY TEST(0.1 GPH) <br /> ❑7. SELF MONITORING SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): <br /> GRAVITY FLOW [17. SELF MONITORING <br /> [19. BIENNIAL INTEGRITY TEST(0.1 GPH) GRAVITY FLOW(Check all that apply): <br /> [38. DAILY VISUAL MONITORING <br /> []9. BIENNIAL INTEGRITY TEST(0.1 GPI <br /> SECONDARILY CONTAINED PIPING SECONDARILY CONTAINED PIPING <br /> PRESSURIZED PIPING(Check all that apply): PRESSURIZED PIPING(Check all that apply): <br /> 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL to. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL <br /> ALARMS AND(Check one) ALARMS AND(Check one) <br /> AUTO PUMP SHUT OFF WHEN A LEAK OCCURS ❑a. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br /> 1[ytr.AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM ❑b. AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM <br /> v DISCONNECTION DISCONNECTION <br /> []c. NO AUTO PUMP SHUT OFF [3c. NO AUTO PUMP SHUT OFF <br /> ❑ 11. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WITH FLOW SHUT 11 AUTOMATIC LEAK DETECTOR <br /> OFF OR RESTRICTION <br /> ❑12. ANNUAL INTEGRITY TEST(0.1 GPH) ❑12. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> SUCTION/GRAVITY SYSTEM SUCTION/GRAVITY SYSTEM <br /> [113. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS [113. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS <br /> EMERGENCY GENERATORS ONLY(Check all that apply) EMERGENCY GENERATORS ONLY(Check all that apply) <br /> [114. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF ❑14. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF <br /> AUDIBLE AND VISUAL ALARMS AUDIBLE AND VISUAL ALARMS <br /> ❑15. AUTOMATIC LINE LEAK DETECTOR (3.0 GPH TEST) WITHOUT FLOW 0 15. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST) <br /> SHUT OFF OR RESTRICTION <br /> [116. ANNUAL INTEGRITY TEST(0.1 GPH) [116. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> [117. DAILY VISUAL CHECK ❑ 17. DAILY VISUAL CHECK <br /> VIII.DISPENSER CONTAINMENT <br /> DISPENSER CONTAINMENT 468. 1. FLOAT MECHANISM THAT SHUTS OFF SHEAR VALVE [34. DAILY VISUAL CHECK 469. <br /> DATE INSTALLED [12. CONTINUOUS DISPENSER PAN SENSOR+AUDIBLE AND VISUAL ALARMS ❑5. TRENCHILINER MONITORING <br /> [13. CONTINUOUS DISPENSER PAN SENSOR WITH AUTO SHUT OFF FOR 0 6. NONE <br /> DISPENSER+AUDIBLE AND VISUAL ALARMS <br /> IX.OWNERIOPERATOR SIGNATURE <br /> I certify at the iqfnrrr4tmn1proX4d herein is true and accurate to the best of my knowledge. <br /> SIGN E OFE PE DATE: 470. <br /> ROPER O (p 1): G �� TITLE OF OWNER/OPERATOR: 472. <br /> Permit Number(Agafficy use only) 473. Pemdt Approved By(Agency use only) 474 1 Permit Expirehon Date(Agency use only) 475. <br /> UPCF hwfwrc-b(1/99)-3/4 www.unidocs.org Rev.02/16/00 <br />