Laserfiche WebLink
BOARD OF TRUSTEES SAN JOAQUIN LOCAL HEALTH DISTRICT <br />James Culbertson, Pre$. t <br />Patricia E. Vannuccl, Secy. 1601 East Hazelton Avenue, P. 0. Box 2009 <br />Anihonsits Ven Spronsen <br />Earl Pimenlel Stockton, Californla 95201 <br />Fern Bupbes 209/466-6781 <br />Daniel L. Flores <br />John 0. Mist, M.D. <br />William J. Wade Jogl Khanna, M.D., M.P.M., District Health Officer <br />Mary Anna Love <br />Facility Name r&,ft <br />Address <br />Date of Inspection <br />MONITORING ALTERNATIVE #7 <br />'LA6C2 <br />Inspector...iti ♦L4i� <br />SERVING <br />City of Lodi <br />Sen Joaquin County <br />City of Escafon <br />City of Manteca <br />City of Ripon <br />City of Stockton <br />City of Tracy <br />San Joaquin County <br />San Joaquin County <br />Limited to undero.round storage tanks which have infrequent inputs and withdrawals and <br />where the ligttic: level in the tank can be measured to an accuracy of +5 gallons or less <br />when the tank is half full. <br />This monitoring alternative shall include: <br />VAnnual precision test on tank and piping. <br />_Tank gauging performed as follows: <br />Tank must be capable of being secured to prevent unauthorized inputs and <br />withdrawals. <br />Tank must have no inputs or withdrawals for at least a 48 hour period <br />(2 days) at the end of consecutive periods lasting up to 7 days. <br />(For example: tank in use Monday through Friday, then locked <br />over weekend). <br />`Liquid level measurements are taken at the beginning and end of the <br />monitoring period (lasting at least 48 hours). <br />(For example: level measured and recorded Friday night before <br />locking and again on Monday morning before opening.) <br />�If liquid level varies more than 1% of the tank volume or 5 gallons, which <br />ever is less, between measurements, an unauthorized release shall be <br />assumed to have occurred and shall be reported to the local agency within <br />24 hours, as per Article 5, Sect: 2652 of the regulations and further <br />evaluations shall be performed to verify or disprove the variations. <br />Implementation of the monitoring alternative requires that the following circled items be <br />completed by the dates specified. p <br />1, Precision test(s) must be performed by �r0 and results submitted to this <br />lJ office within 30 days of the test. <br />Tankgauging must be started immediately. (See instructions above), <br />If the above compliance dates cannot be met, contact this office prior to the specified <br />date. <br />4/86 UGT 3 <br />