Laserfiche WebLink
11. Handling of excavated soil: <br /> a) What material will be used to line and cover the tank & piping stockpile placed on the ground? <br /> b) What will be the disposition of the tank & piping stockpile after analysis? <br /> U. What is the depth to groundwater? _? <br /> Describe the source of information: <br /> li. Are there any wells on this parcel or adjacent properties? YES J NO W <br /> Fyn ol- WIBLIS DISTANCETO TANKS(S) <br /> Public Well ft. <br /> Private Well <br /> Irrigation Well h. <br /> Monitoring Well Il. <br /> Other It. <br /> 16. Will the tank(s) pending closure be replaced with an aboveground or underground storage tank(s) and has the <br /> respons 1�party submitted a "Letter of Commitment" to PHS/EHD? <br /> Page 6 <br /> closplan (Rev 4/8/91) wp <br />