Laserfiche WebLink
o <br /> TOM MEHRINGER CONST . INC . SITE SAFETY PLAN <br /> Daily, prior to commencement of operations, all personnel <br /> involved with the remedial investigations shall attend short <br /> "tailgate" safety briefing which will covers <br /> * Expected conditions at the site . <br /> * Daily activities. <br /> * Safety deficiencies previously observed. <br /> * Any changes in the emergency procedure. <br /> Record of Training - Upon completion of the project safety <br /> briefing, all personnell will sign a statement indicat thigi$project <br /> have read and understand that they agree to abide by <br /> will be kept for <br /> Health <br /> safety briefings. The TMCIrcompliancerecod ofd ance agreement is included <br /> all <br /> at the end. <br /> 12 .0 MEDICAL SURVEILLANCE PROGRAM <br /> Prior to assignment to any task requiring a level of personnel <br /> protection above Level D, personnel will submit evidence that they <br /> have received a physical examination within the previous twelve <br /> months which incorporates the followings <br /> An occupational and general physical history. <br /> * Complete physical examination which incorporates the head, <br /> torso, abdomen, limbs, and musculo-skeletal system. <br /> * Chest X-ray. <br /> * Vision test. <br /> * Electrocardiogram <br /> To aid in the prevention of heat stress, the following will i,a <br /> provided for personnel working at the sites <br /> * Potable water with 1 per cent salt or commercial mix (such <br /> as Gatoraid) will be within easy access to all worker . <br /> * Work Schedules <br /> 8. <br />