My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINDBERGH
>
6364
>
2300 - Underground Storage Tank Program
>
PR0507806
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2022 11:30:18 AM
Creation date
11/5/2018 5:09:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0507806
PE
2361
FACILITY_ID
FA0007770
FACILITY_NAME
ATLANTIC AVIATION
STREET_NUMBER
6364
STREET_NAME
LINDBERGH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
02
SITE_LOCATION
6364 LINDBERGH ST 202
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LINDBERGH\6364\PR0507806\COMPLIANCE INFO 1998-2011.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
04/07/2004 08: 44 2099833 <br /> STOCKTON JET CENTER PAGE 04 <br /> Underground.Storage Tank Monitoring Plan-t <br /> UST Monitoring Site Flan <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . E <br /> - a'P i _ D�sr t : 'ffinvlge!�PPt6��anitF _ <br /> •. . . . . . . . • . - . . . . . . . . . . . . . . <br /> . . . . . . . . . . . - - . . . . . . <br /> . • _ . <br /> : _ : �eeach�yc��r1En.�e.1V-:1!_.c. : - - <br /> . . . . . � . . . . . . . . . . <br /> . . . . . . . � � . . . . . . . . . . . . . . . . <br /> ( - . . . . . . . . . . . . . . . <br /> Date map was drawn or revised: 04 f Yz.� - Zoo N <br /> Iustructions <br /> if you already have a diagram (e.g. your Hazardous Materials Business Plan Site Plan/Storage Map) which <br /> shows all required information, you may include it, rather than this page, with this monitoring plan- On your <br /> site plan, show the general layout of tanks and piping in relation to nearby buildings or other structures. Clearly <br /> identify locations of the following equipment, if installed: monitoring system control panels; mechanical or <br /> electronic line leak detectors; sensors monitoring tank annular spaces, sumps, trench systems, under-dispenser <br /> containment, or other secondary containment areas; and, if ATG is required, in-tank liquid level probes. In the <br /> space provided,note the date the drawing was prepared- <br />
The URL can be used to link to this page
Your browser does not support the video tag.