Laserfiche WebLink
04/07/2004 08: 44 2099833 <br /> STOCKTON JET CENTER PAGE 04 <br /> Underground.Storage Tank Monitoring Plan-t <br /> UST Monitoring Site Flan <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . E <br /> - a'P i _ D�sr t : 'ffinvlge!�PPt6��anitF _ <br /> •. . . . . . . . • . - . . . . . . . . . . . . . . <br /> . . . . . . . . . . . - - . . . . . . <br /> . • _ . <br /> : _ : �eeach�yc��r1En.�e.1V-:1!_.c. : - - <br /> . . . . . � . . . . . . . . . . <br /> . . . . . . . � � . . . . . . . . . . . . . . . . <br /> ( - . . . . . . . . . . . . . . . <br /> Date map was drawn or revised: 04 f Yz.� - Zoo N <br /> Iustructions <br /> if you already have a diagram (e.g. your Hazardous Materials Business Plan Site Plan/Storage Map) which <br /> shows all required information, you may include it, rather than this page, with this monitoring plan- On your <br /> site plan, show the general layout of tanks and piping in relation to nearby buildings or other structures. Clearly <br /> identify locations of the following equipment, if installed: monitoring system control panels; mechanical or <br /> electronic line leak detectors; sensors monitoring tank annular spaces, sumps, trench systems, under-dispenser <br /> containment, or other secondary containment areas; and, if ATG is required, in-tank liquid level probes. In the <br /> space provided,note the date the drawing was prepared- <br />