Laserfiche WebLink
. FEB.25.2003 9:43RM SCT CO • N0.607 P.11i11 <br /> aWRCB,January 2002 <br /> 5. SECONDARY SECONDARY PIPE STING <br /> Test Method Developed By: �j Piping Manufacturer ludusuy Standard 0 Professional Engineer <br /> C Other(Specify) <br /> Test Method Used: if pressure Q Vactmm Q Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: 0-k3 pS oaf Equipment Resolution: <br /> Piping Run# 1 Piping Run# a- Piping Run# Piping Run# <br /> Piping Material: t= )�N x]V <br /> PipingManufacnsen (: Mesar eon <br /> Piping Diameter• y t <br /> Length of Piping Run: I \V <br /> Product Stored: Ali-» G06 S <br /> Method and location of <br /> i ai -nm isolation: <br /> Wait time between applying <br /> pressore/vactium/watec and O v <br /> darting test: <br /> Test Star[Time: 130 VLa5 <br /> Tnitial Reading W: 'j <br /> 12 <br /> Test End Time: U l5 <br /> First Reading(Rr): . 41 5 at <br /> Test Duration: 11'1DUR 1 M+uNz <br /> Change in Reading <br /> Pass/Fail Threshold or <br /> Cntema: G b <br /> �'?�'Re9,u1>;.,l, ��� �+�u;r��l'� aw; 1 gses ;i �,¢�Iy.,�"' as �a'.�a�?!�I�, s, „e. as ��u:4r7�a►isn w^ '7�'` ,�'� , <br /> Comments- include informal'o- ^^repairs made prior to testing and recommended follow-up for Palled tests) <br /> �/�`r- ; T 74s-� <br />