Laserfiche WebLink
FEB.25.2003 9:43AN SC T CO NO.607 ,P.6/11 <br /> SWRCB,January 2D42 Page of <br /> 9. SPILL/4VERML CONTADWNT 13OXES <br /> Facility is Not E ai ed Wits S i11/Qvev fill Contai=enF boxes <br /> SpUlloverMl Containment Boxes are Present,but were Not Tested <br /> Fest Method Developed 13y: Spill Bucket Manul:acsurw Induny Standard Professional Engineer <br /> Other(Specify <br /> Test Method Used: Pressure -Vacuum Hydrosratic <br /> Other CsPecfyJ <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# SplltBOY# SQill Box# Spill Box!# <br /> Bucket Diameter; � <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuumhvater and <br /> startin test: I <br /> Test Start Time: <br /> Initial Reading(RO: I <br /> Test End Time,, <br /> Final Reading(RF); <br /> Test Duration: <br /> Change in Reading(RP-RO: <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: 0 'P4155 ❑Fail Pass O,Fail ©'pail" jR Pass ❑pail i <br /> Comments Onclude information can repairs madeprior to tasting and recommended follow-up for failed tests <br />