Laserfiche WebLink
L1; P sujts of Testing/Ser�icing <br /> Software Version Installed: _ � "o;C✓ <br /> Co plete the following checklist: <br /> Yes <br /> Yes Yes ❑ No* Is the audible alarm operational? <br /> ❑ No* Is the visual alarm operational? <br /> ❑ No* Were all sensors visually inspected, functionally tested,and confirmed operational? <br /> Eif Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> ❑ NIA operational? <br /> Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ NIA monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes:which sensors initiate <br /> positive shut-down? (Check all that apply) )a Sump/Trench Sensors; V'Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? 2FYes; Q No. <br /> ❑ Yes ❑ No, For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> t(N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly? If so,at what percent of tank capacity does the alarm trigger? % <br /> ❑ Yes* No Was any monitoring equipment replaced? If yes, identify specific sensors,probes, or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E, below. <br /> ❑ Yes* No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that app4) <br /> ❑ Product; ❑ Water. If yes,describe causes in Section E,below. <br /> Od Yes C3No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up repons,if applicable <br /> Yes ❑ No` Is all monitoring equipment operational per manufacturer's specifications? <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Page 2 of 3 03101 <br />