Laserfiche WebLink
04/19/2005 10:63 2093697228 NEIL ANDERSON ENVIRO PAGE 02/03 <br /> 8. a. Describe is method that will be utilized to purge and/or inert the tank(s); <br /> b- Tank/Piping Hauler: <br /> Name 7 S'� 0-0 ► . mac!i PMtAIT ; c A w7 ) 2-3 ) <br /> Address C, 1, qq7 M 3 6 '.5 �V��� zip <br /> Phone No. k <br /> Hauler Registration# (if hauled as hazardous)i~.. - - <br /> C. Tank/Piping Disposal Site; <br /> Address 0 E 50 W C) <br /> r -q. City-JY _zip <br /> .Phone No.( , _ 376- <br /> EP,A,ID# (if'transported to a perrni tted TSD facility) , <br /> 9. Is the sampling.firm an independent third party from the contractor? YPJSX NO <br /> 3a. Describe,in,detail,how the soil and/or water sarnple(s)benea th tani<and piping will be obtained, <br /> -OF O <br /> sir &-6 <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: <br /> 11. Handling of excavated soil: <br /> a)What material will,be used to line the tank pit and cover the stockpile? <br /> V I r7 9Ok-C-N <br /> b)What will be the final destination of the excavated stockpile? <br /> c)Contaminated Sot]I-Iazardous Wasto Hauler- CA 17-ov 57 <br /> Ono O-A Dq'625«4,3"L <br /> Name cJ _ Hauler 1[tegistratavn#_p,r 5L 7 <br /> Address, 00 10 .. &fLT- City 1IV INI Sid(, Zip ! 54 f 2- <br /> Phone No.( -7 D-7)—�3 t 1�0 7 <br /> EH 23 046(Revised 10/16/03) Page 3 <br />