My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINDBERGH
>
6364
>
2300 - Underground Storage Tank Program
>
PR0507806
>
INSTALL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2022 11:40:05 AM
Creation date
11/5/2018 5:11:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1998
RECORD_ID
PR0507806
PE
2361
FACILITY_ID
FA0007770
FACILITY_NAME
ATLANTIC AVIATION
STREET_NUMBER
6364
STREET_NAME
LINDBERGH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
02
SITE_LOCATION
6364 LINDBERGH ST 202
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LINDBERGH\6364\PR0507806\INSTALL 1998.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. 1Am& w rwau Lw <br />TANK # <br /># * <br />sets ofes (include manufacturer's specification so for proposed equipment to be installed). <br />• 1, <br />_✓ <br />Three complete <br />CAPACITY <br />2. <br />_✓ <br />Plans drawn to scale in non -erasable print. <br />3_ <br />MANUFACTURER <br />Plot plan to show location of tanks and all associated piping. <br />, eM <br />4, <br />_✓ <br />Striker plates or drop tube -mounted bottom protectors illustrated below all accessible openings. <br />COMPOSITION <br />5. <br />_✓ <br />Tank cross-sectional diagram. <br />6. <br />MODEL <br />Detail of tank, associated piping, excavation and cover. <br />e <br />7, <br />•�- <br />Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, <br />Chapter 16, <br />A 1, . Ga00 <br />01 , <br />Article 3, Section 2631 (b) 8 26353 <br />g, <br />Verification of product compatibility with the tank(s), piping, monitoring <br />device(s), epoxy or silicone glues, etc. <br />U.L. LISTED <br />9, <br />_✓ <br />Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br />10. <br />COMPATIBILITY WITH 100% <br />METHANOL <br />At the installation site, prior to installation, a tightness test shall be performed on both primary <br />(10) and <br />_✓ <br />secondary (2°) containment systems before covering. [Section 2635 (a) (3) & (4)] <br />11. <br />Tank integrity test required upon completion of installation with tank in operating condition. Test <br />results to be <br />submitted directly to PHS-EHO from the testing company or owner of facility. [Health & Safety Code, <br />Division 20, <br />Chapter 6.7, Section 25291 (h)] <br />14. 1Am& w rwau Lw <br />TANK # <br /># * <br /># <br /># <br /># <br /># <br />CAPACITY <br />O <br />MANUFACTURER <br />-I ulA Cyy.-r <br />, eM <br />COMPOSITION <br />FAX <br />MODEL <br />bwr-(,T <br />e <br />PRODUCT <br />A 1, . Ga00 <br />01 , <br />CORROSION PROTECTION <br />F <br />U.L. LISTED <br />e <br />COMPATIBILITY WITH 100% <br />METHANOL <br />Ye $ <br />13. TANK(s) TO BE INSTALLED <br />_ A. Steel -clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br />coatings or coverings. <br />(1) Tested at the installation site using an electric resistance holiday detector. <br />(2) Vacuum applied to interstitial space. <br />B. Fiberglass <br />✓ (1) Installation instructions require an air test and soap bubble test prior to installation. <br />(2) vacuum applied to interstitial space. <br />(3) Hydrostatic annular (primary tank pressure test). <br />_ C. Non -clad steel tank (Section 2635 (a) (2) (A)] <br />_ (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />_ (2) Field installed cathodic protection systems designed and certified as adequate by a <br />corrosion specialist. <br />(3) Impressed current systems to be inspected no Less than every 60 days. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.