Laserfiche WebLink
0 0 <br /> (—D <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, CA 95202-3029 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.sigov.org/ehd <br /> UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br /> Facility Name: Inspection Date: <br /> SJ Regional Transit Tuesday, July 5, 2011 <br /> Facility Address: Service Request#: <br /> 1533 E. Lindsay, Stockton SR0062880 <br /> Onsite Service Technician's Name: ICC Service Technicianlinstaller Exp.Date: Manufacturer Training: <br /> David Winkler 5263373-ut 3/10/2012 VMI #2529 (12/1/2011) <br /> SERVICE SERVICE <br /> Leak detector Spill bucket ❑ minimum 5 gallon <br /> ❑X mechanical Model:vM199 LD-2000 <br /> ❑X ❑ ❑ 1 hour hydrostatic ❑ Incon TS-STS <br /> ❑ electronic Serial#: 09021519 ❑ Caldwell System ❑ Other <br /> ❑ line test programmed <br /> Leak detector Spill bucket ❑ minimum 5 gallon <br /> ❑ mechanical Model: <br /> ❑ ❑ electronic Serial#: ❑ ❑ 1 hour hydrostatic ❑ Incon TS-STS <br /> ❑ Caldwell System ❑ Other <br /> ❑ line test programmed <br /> sensor <br /> ❑ Primary <br /> El positive shutdown Model: El <br /> eiping testing at: <br /> ❑ fail safe Serial#: <br /> si <br /> ❑ NA minutes <br /> sensor Secondary containment testing for: <br /> ❑ ❑ positive shutdown Model: UDC(s) Piping <br /> ❑ fail safe Serial #: Sump(s) UST(s) <br /> ❑ NA <br /> sensor ❑ Testing for the above components are next due by: <br /> ❑ ❑ positive shutdown Model: <br /> ❑fail safe Serial#: Note: Pease be avare that 2°containment components are requimd to be tested upon <br /> ❑ NA installation,6 months after,and every 36 months Ihereafler. <br /> ❑ Drop tube with mechanical overfill at 95% ❑ Cold start of monitoring panel <br /> ❑ Drop tube with mechanical overfill at 95% ❑ Corrosion protection <br /> ❑ Overfill prevention (see LG letter 150-1) ❑ Other: see below <br /> ❑X This UST facility is APPROVED to operate ❑ This UST facility is NOT APPROVED to operate <br /> Observed new diesel LD in tank#4 detected 3gph leak at 10 psi. <br /> TUISfACILITY IS SUBJlr TO REINSP CTIO T AN ME AT EHD'S CURRENT HOURLY RATE. <br /> EH nsp t R eived By: Title: <br /> EHD 2 4 UST SERVICE REQUEST INSPECTION REPORT <br /> Rev 10 6/10 <br />