My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010-2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINDSAY
>
1533
>
2300 - Underground Storage Tank Program
>
PR0231158
>
COMPLIANCE INFO 2010-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2022 11:57:53 AM
Creation date
11/5/2018 5:15:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2013
RECORD_ID
PR0231158
PE
2361
FACILITY_ID
FA0003749
FACILITY_NAME
SJ REGIONAL TRANSIT
STREET_NUMBER
1533
Direction
E
STREET_NAME
LINDSAY
STREET_TYPE
ST
City
STOCKTON
Zip
952054498
APN
15302004
CURRENT_STATUS
02
SITE_LOCATION
1533 E LINDSAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LINDSAY\1533\PR0231158\COMPLIANCE INFO 2010-2013.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES[] NO <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Q-xy9^a4 F P_ e I (fl sgL� u D e A-. ARMS v rzEm ws sem. ,Ti?: <br /> fLO448L,€591D�_ 3'ySTFM APJa (to4x)b CA-.wry SFy562 , jgSMC 14 <br /> At-TO RE�P�A IF4 NDC S£NSDAL cIWOTA- 9"1L4c,,iry ctnr06TrxV0 <br /> f/vu>z moasT�� s+JL SYSsFM C_KEC44" mx nw SYs +s Ss <br /> sti.1G 0C1Lf4AL, (yycowi t pvo) <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> U.1.r17vSP-5A1-- t`x4D- :y SumP 5g"Sb1e P/N ( TP -aL_s <br /> SNe-D. - r�nNk &IMJ =Utj3j & SY51%^5 <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.