My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2008-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINDSAY
>
1533
>
2300 - Underground Storage Tank Program
>
PR0231158
>
BILLING 2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2022 3:49:03 PM
Creation date
11/5/2018 5:16:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2008-2009
RECORD_ID
PR0231158
PE
2361
FACILITY_ID
FA0003749
FACILITY_NAME
SJ REGIONAL TRANSIT
STREET_NUMBER
1533
Direction
E
STREET_NAME
LINDSAY
STREET_TYPE
ST
City
STOCKTON
Zip
952054498
APN
15302004
CURRENT_STATUS
02
SITE_LOCATION
1533 E LINDSAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LINDSAY\1533\PR0231158\BILLING 2008-2009.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />MIS <br />WF UNIFIED PROGRAM CONSOLIDATED FOEM <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN- (Psae loft) <br />TYPE OF ACTION ❑ 1. NEW PLAN X2. CHANGE OF INFORMATION <br />490.1 <br />PLAN TYPE 1. MONITORING IS IDENTICAL FOR ALL LISTS AT THIS FACILITY. <br />49x2 <br />(Check one item only) ❑ 2. THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(;)' <br />L FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) I I I - I I I 1 -1 1 1 1 1 <br />1 <br />1 <br />BUSINESS NAME (Same as FACILITY NAME) �6H �' rlrn L674td �i'�+L,S"�� G74- <br />3 <br />BUSINESS SITE ADDRESS s�'? E lI pr f- tm. <br />CITY <br />11. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />Testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) must be performed at the frequency <br />specified by the equipment manufacturers' instructions, or annually, whichever is more frequent, and that such work must be performed by qualified personnel. <br />23 CCR §2632,2634, 2638 2641 <br />MONITORING EQUIPMENT IS SERVICED I. ANNUALLY ❑ 99. OTHER (Specify): <br />49 3b <br />M. MONITORING LOCATIONS <br />❑ 1. NEW SITE PLOT PLANIMAP SUBMITTED WITH THIS PLAN. 2. SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR §2632, <br />2634)490.4 <br />IV. TANK MONTPORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br />1. CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT <br />49x5 <br />VAULT(S) WITH AUDIBLE AND VISUAL ALARMS. (23 CCR §2632,2634) <br />SECONDARY CONTAINMENT IS: ❑ a. DRY X b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. UNDER VACUUM <br />4906 <br />PANEL MANUFACTURER: °90.9. MODEL #: - - <br />°90.8 <br />LEAK SENSOR MANUFACTURER: T - MODEL #(S): 7 ja J <br />690'10 <br />2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S). (23 CCR §2643) <br />4911 <br />PANEL MANUFACTURER: 490.12 MODEL #: <br />490'13 <br />IN -TANK PROBE MANUFACTURER: 490.14. MODEL #(S): <br />490-15 <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY <br />490'16 <br />❑ d. MONTHLY ❑ e. OTHER (Specify): <br />49o17 <br />PROGRAMMED TESTS: ❑ a. 0.1 g.p.h. ❑ b. 0.2 g.p.h. ❑ c. OTHER (Specify): <br />49=1 <br />❑ 3. MONTHLY STATISTICAL INVENTORY RECONCILIATION (23 CCR §2646.1): <br />490.20 <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) (23 CCR §2645). TESTING PERIOD: ❑ a 36 HOURS ❑ b. 60 HOURS <br />490'21 <br />490.8 <br />5. TANK INTEGRITY TESTING (23 CCR §2613.1): <br />490'B <br />TEST FREQUENCY: ❑ at ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHER (Specify): <br />gy900.a6u <br />99.OTHER S i <br />❑ (Pec fy): <br />490.26 <br />490.) <br />V. PEPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />XI . CONTINUOUS MONITORING OF POE/ PIPING SUMP(S) AND OTHER SECONDARY CONTAINNWNT WITH AUDIBLE AND <br />49o2s <br />VISUAL ALARMS. (23 CCR §2636) <br />SECONDARY CONTAINMENT IS:Xa. DRY ❑b. LIQUID FILED ❑c. PRESSURIZED ❑d - UNDER VACUUM <br />490'29 <br />PANEL MANUFACTURER h 490x0 <br />MODEL M 749x31 <br />LEAK SENSOR MANUFACTURER: S °90'32 <br />MODEL #(S): S L S <br />49x33 <br />PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN. ❑ a. YES 21b. NO <br />490.34 <br />FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a YES fib. NO <br />4WIS <br />❑ 2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g p.L LEAK TESTS AND RESTRICTS OR SHUTS OFF <br />PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR 26 <br />490.36 <br />D2V <br />MILD MANUFACTURER(;): F-EPgi`-S' 490.39 MODEL #(S)' 0 <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT R UTINELY PERFORMS 3.0 g.p.h. LEAK TESTS (23 CCR 52636) <br />490.39 <br />ELLD MANUFACTURER(S) 490-001 MODEL#(S): <br />49041 <br />PROGRAMMED IN LINE LEAK TEST: ❑ 1. MINIMUM MONTHLY 0.2 g.p.h. ❑ 2. MINIMUM ANNUAL 0.1 g.p.h. <br />49072 <br />ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO <br />49 13 <br />ELLD FAILURF/DISCONNECI'ION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO <br />49 <br />4. PIPE INTEGRITY TESTING 490<3 <br />TEST FRE UENCYa. ANNUALLY b. EVERY 3 YEARS [3c. OTHERS i 49 49 17 <br />5. VISUAL PIPE MONITORING. <br />49 <br />FREQUENCY ❑ a DAILY ❑ b. WEEKLY ❑ C. MIN. MONTHLY 8. EACH TIME SYSTEM OPERATED- <br />49 19 <br />•AlI9aN hrmaNbri ofimbund fid pipig ody W HSC 25281.5 3 <br />❑ 6. SUCTION PIPING MEETS EXEMVFION CRITERIA 123 CCR §2636(x)(3)1. <br />490.50 <br />7. NO REGULATED PIPING PER HEALTH AND SAFETY CODE, DIVISION 20, CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br />490.51 <br />❑ 99. OTHER (Specify) <br />49x52 <br />490.53 <br />UPCF UST -D (12/2007) 1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.