My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
8880
>
2300 - Underground Storage Tank Program
>
PR0231648
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 2:35:13 PM
Creation date
11/5/2018 5:23:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231648
PE
2361
FACILITY_ID
FA0003675
FACILITY_NAME
BANTA CARBONA IRRIGATION DIST
STREET_NUMBER
8880
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
8880 W LINNE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LINNE\8880\PR0231648\BILLING 1985-1997.PDF
QuestysFileName
BILLING 1985-1997
QuestysRecordDate
8/2/2017 9:13:41 PM
QuestysRecordID
3548277
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
it <br /> un ee <br /> STATE OFCALIFORNIA ;.' °1, <br /> STATE WATER RESOURCES CONTROL BOARD s` ,r.. <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION . FORM B ° <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. c�`��°°�1� <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION 7 PERMANENTLY CL NSITE <br /> ONE ITEM F-] 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANNK CLOSURE e TANK REMOVED O <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: ISA (&Y 006, IY' lr', �1SC S*A - <br /> 1. TANKDESCRIPTION COMPLETE ALL ITEMS-- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.D.# )A B. MANUFACTURED BY: uKb <br /> C. DATE INSTALLED(MO/DAYNEAR) JAU D. TANK CAPACITY IN GALLONS: <br /> ILTANKCONTENTS IFA-11S MARKED,COMPLETE ITEMC. �/ <br /> A 1 MOTOR VEHICLE FUEL ❑ 4 OIL B.TF1 <br /> C. �c 1aUNLEADED REGULAR ❑ 3 DIESEL ❑�� 6 AVIATION GAS <br /> ❑ 2 PETROLEUM ❑ W EMPTY DUCT UNEAIDED ❑ 5 JETFUELAHOL ] METHANOL <br /> ❑ 3 CHEMICALPRODUCT ❑ 95 UNKNOWN TE ❑ 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.#: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B.AND C.AND ALL THAT APPLIES IN BOX D AND <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM 2 2 SINGLE WALL F-14 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> I <br /> B. TANK K_I 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEELCLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (PrimaryTank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ,}❑.J 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING JQ 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> LINING r <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES— NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ E::]� 2 COATING 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION F-1 a(5 CATHODIC PROTECTION 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION AU 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND AID BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEELW/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ i AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ 0 MONRORMG ❑ 99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY F 3.WAS TANK FILLED WITH YES ❑ NO� <br /> SUBSTANCE REMAI G GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED <br /> 1UNDER PENALTY OF P RJURY,AND//��T -THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICAN(PRINTED 8 SIG AATU E) /M i1 � '1 ,(1 / A, I , DATF�_`f_ 7 <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS CO OSEO OF THE FOUR NUMBERS BELOW if <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D.# m <br /> PERMIT NUMBER PERMIT APPROVED SYIDATE PERMIT EXPIRATION DATE <br /> FORM 8 (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> _ FOR00348-RS <br />
The URL can be used to link to this page
Your browser does not support the video tag.