Laserfiche WebLink
NORTH CAL <br /> CONSTRUCTION Protecting the Environment <br /> A 0. Box 588 Stockton,CA 95201 2091465-5886 General Engineering las icense No. 505704 <br /> San Joaquin Local Health District <br /> 1601 East Hazelton Avenue <br /> Stockton, California 95203 ® � <br /> Re: Soil Remediation Tiorkplan 20 <br /> 1. Name and address of site: 1UI >4 198J <br /> 429 W. Lockeford, Lodi, Ca. 95240 ENVI ROMEN <br /> ConVal Food Store PERM1 <br /> Contact person: Mardee Kidd (owner) 7/SERV C SETH <br /> 2. Scale drawings - see attached. <br /> 3. History of site: <br /> Two underground fuel tanks were installed around 1970. They were one <br /> 250 gallon regular and one 500 gallon unleaded, About 7 or 8 years ago the <br /> tanks were no longer being used. The tanks were removed May 1987 by Jim <br /> Thorpe Oil, Inc. of Lodi. (see attached documents.) The soil analysis re- <br /> port show signs of contamination. (see attached soil report.) This soil <br /> remediation workplan is to determine the extent of the contamination. <br /> 4. Ground water 42-45 feet, Reff: City of Lodi, Sharon. Phone (20.9)_ <br /> 333-6740. Total amount of dirt to be excavated by back hoe operation is <br /> approximately 19.99 cubic yards. All dirt will be placed back in the hole <br /> upon completion of soil sampling. Hole will be lined with plastic 30-60 <br /> mil thickness prior to back fill. <br /> 5. Remedial steps to be taken to clean up the soil contamination may con- <br /> sist of aeration by backhoe of the contaminated soil, if permitted by the <br /> county. If not allowed to areate the contaminated soil, then the contmA, <br /> nated soil will be removed to the contaminated land fill in Buttonwillow, <br /> California. <br /> 6. However, North Cal Construction has no contract with Mar Val Food <br /> Store to haul any contaminated soil from this job site. We are only con- <br /> tracted to obtain the required samples and assist in defining the amount <br /> of contamination on the job site. <br /> 7. Depending on weather of unforseen problems, the work shoud be completed <br /> in 10 working days, <br /> 8. The soil analysis will be handled by Nelson/FGL Environmental, 3948 <br /> Budweiser Court, Stockton, California. <br />