My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2005 TANK TOP UPGRADE PLAN
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOCKHEED
>
1941
>
2300 - Underground Storage Tank Program
>
PR0231891
>
INSTALL_2005 TANK TOP UPGRADE PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2022 3:58:43 PM
Creation date
11/5/2018 5:44:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2005 TANK TOP UPGRADE PLAN
RECORD_ID
PR0231891
PE
2361
FACILITY_ID
FA0003674
FACILITY_NAME
BANK OF STKN AIRPORT HANGAR #3
STREET_NUMBER
1941
Direction
E
STREET_NAME
LOCKHEED
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
1941 E LOCKHEED CT
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LOCKHEED\1941\PR0231891\TANK TOP UPGRADE PLAN 2005.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISIONS 5 <br /> A05-2404 MEA <br /> PRAI NA&EA DRA I NAGE <br /> T T zoo' <br /> PROPOSED LOCATION OF <br /> — 7 X 7 LEVEL 7' X �' ANDIN6 PETROLQ/M EIXJIPMENT <br /> 1/4" = 1' — CONTROL BOXE5 <br /> LANDING MAX SLOPE <br /> rA <br /> 1 8 -IOOAMP / <br /> APPROXIMATE LOCATION OF F <br /> - HOOKUPNEW FUELING H05E REEL N.I.G. 1"'1 <br /> -_ HOSE - <br /> REEL m [� <br /> 00 <br /> z a o <br /> RAMP <br /> 5LOPE 40' <br /> m <br /> PRO SIO/yq< <br /> S'yii c2, <br /> APPROXIMATE LOCATION OF No.l 4 0 m <br /> t <br /> I � NEW PETROLEUM LIE N.I.C. I A <br /> DRAINAGE FOF CAUFOCL <br /> I I DRAINAGE <br /> J-LEAVE BUILDING W4,LL5 <br /> FOR TEMPORARY FUELING <br /> !// I APPROXIMATE LOCATION (4j m <br /> FOR WATER HOOK UP {— v <br /> (E) GONTROL5 TO REMAIN WATER < <br /> OPERATIONAL z Y <br /> I <br /> APPROXIMATE LOCATION— — — — — - --- —��APP > _ <br /> _____------------------BUILDING TO M MOVED___ ________ _______ _______ ___ _____ELEC.1OR{AL PAELATION in <br /> wE <br /> TO ELECTRICAL PANEL L I O C <br /> —y -y -v 4 -v -y -V -v -v -v -v -v -v -y -V �-v -V -V V -V --4 •I� (6 g <br /> TO WATER HOOKUP APPROXIMATE l'• <br /> LOCATION d <br /> TO WATER HOOKUP LfQ <br /> I O <br /> 10,000 &ALLON <br /> h1 POdE <br /> PANEL <br /> PETROLEUM TANK <br /> cc <br /> i SLOPE THI5 AREA 40' a, <br /> F L SLAB � yvp � <br /> ' v <br /> FUELING 151-AND TO REMAIN <br /> OPERATIONAL y <br /> ........_._ .DRAINAGE ® —/ <br /> DRAINAGE <br /> .10co <br /> LLt <br /> rn ® < Wo <br /> P4 Z = <br /> call <br /> _100 AMP <br /> 400 A <br /> ® 5ERV GMP AN ® HOOKUP �... <br /> $FLEET G-1.3 <br /> F PARKING DETAIL5 <br /> 3 E <br /> I <br /> NO / 114" 1 MAX SLOPE <br /> PARKING " <br /> EA _12" "NO PARKING" PAINTED 51GN IN CR055 HATCHED AREA eDRAINAGE DRAINAGE <br /> i <br /> eR SITE PLAN N <br /> M <br /> CD <br /> °' ,° <br />
The URL can be used to link to this page
Your browser does not support the video tag.