My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1987-1997
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
2300 - Underground Storage Tank Program
>
PR0231356
>
COMPLIANCE INFO 1987-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 1:08:15 PM
Creation date
11/5/2018 5:52:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-1997
RECORD_ID
PR0231356
PE
2361
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (MOBIL) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
01
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LODI\2500\PR0231356\COMPLIANCE INFO 1987-1997.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EMERGENCY RESPONSE TRAINING PLAN <br /> Person responsible for training Plan: <br /> Name ERICH SPITZER <br /> Phone 800 624-5930 x40 <br /> TRAINING REQUIREMENTS: <br /> All employees are trained in the following procedures: <br /> 1 ) Internal emergency shut-down procedures. <br /> 2 ) External emergency response organizations notification. <br /> 3 ) Location and content of emergency response plan. <br /> 4 ) Evacuation. <br /> 5 ) Locations and proper use of fire and spill control equipment. <br /> All personnel receives emergency response training on their first day of <br /> employment. Refresher training is provided at least annually. <br /> PERSONNEL TRAINING RECORDS: <br /> The following records are maintained for each employee: <br /> 1 ) Type and amount of introductory and continuous training. <br /> 2 ) Date training was completed (normally 1st work day) . <br /> 3 ) Description of facility emergency response drills. <br /> 4 ) Former employees training records are retained for minimum of <br /> 3 years. <br /> EMERGENCY RESPONSE TRAINING PLAN LOCATION: At premises <br /> HAZARDOUS MATERIALS MANAGEMENT PLAN PREPARED BY: <br /> David Oldfield Project Coordinator <br /> NAME TITLE DATE <br /> SIGNATURE <br /> LICENSE NUMBER (if any) <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.