Laserfiche WebLink
IMPACT VALVE STABILIZER BAR 48" <br /> 5313/14" <br /> OPW 6OV9PG-ICtOi 45" u i <br /> SHEAR VALVE�� DISPENSER ISLAND ----� � <br /> ANCHOR 8AR PUMP IDENTIFICATION W)MBER <br /> OPENING FOR I" VAPOR I 'I- I II PUMP IDENTIFICATION NUMBER <br /> V.¢. LINE RECOVERY FIFE �, Ib I/2" METAL CANOPY, PAINT' v J N r <br /> - _— RISER GONG. SLAB 1 POR ANCHOR-1/161 S407`5 <br /> \ p N <br /> OR "U5A" DECAL - cq (h <br /> ENVIRON t _ � - � <br /> TEST T SUMP NEER 4 d �� 1' COAX WHIP END HOSE ,y pgpgop� <br /> " (3) 1 1/2" 5UPFLY UNIONS d <br /> (2 7/16"UP FROM BASE) CATLOW 0AY200 INVERTED 23 5!b" j U <br /> 46" COAX BREAK AWAY Ib" 00 <br /> to mY <br /> PIP hG SMITH T 42" Q W p�•� <br /> ! _ ` (4) 3/4' X 1 I/2" 51OT5 <br /> —ENTRY BOOT FOR ANCHOR " $LO Ue <br /> I I/2" GEOFLEX ELBOW FITTING -------- 1 <br /> BLOTS <br /> PIPING I J -I-- {-- _ GOCPYEAR W-6" FLEX r 4 <br /> OPENING FOR 1/2' Ir -a2 1/2+ OPENING FOR STEEL VAPOR ASSIST <br /> CONNECTOR TUBE SPEAKER CONDUIT I' CONDUIT COAX VENTTURI HOSE! OR EO o �( <br /> (5U5GE5TED LOCATIOW I 13 5/0" q 1/4" I ID M <br /> 1 1.� rryy ' 14 1/2" 71 � II� <br /> (N) DEEP DISPENSER SUMP �I 6" —�- I6" PHASE II VAPOR VAC. m �n f 1 <br /> 24• 21" V.R. AS515T SYSTEM v <br /> -NOTE COMPONENTS <br /> 2" i CONTRACTOR MUST VERIFY <br /> 1{ <br /> 11 IMPACT VALVE— 4DISPENSER MODEL WITH USA <br /> 51ABILIZER BAR REPITIVE PRIOR 70 <br /> INSTALLATIALL.AVON OF PRODUCT PIPING COPAOAX <br /> NO BOOTLESS <br /> SHE 60V5PG-IOOI TOP VIEW AT 015PEN5ER SUMPS. COAX NOZZLE <br /> SHEAR VALVE \ _015F FIR ISLAND - I <br /> ANCHOR METAL DOOR, PAINT <br /> CflCONC. SLAB - /I GR "USA" DECAL <br /> -'— (1) 1" VAPOR <br /> - -`/EEDER ROOT RECOVERY PIPE DISPENSER BASE 't <br /> LIQUID SENSOR 1" CARPED 22' DISPENSER ISLAND <br /> ENVIRON FRONT ELBOW / <br /> �'j / (STAINLESS STEEL FORM) <br /> TEST FOOT- DISPENSER J-BOX - <br /> ISPENSER ISLAND <br /> SUMP FRONT THIS DIMENSION 15 FGR " SEE PP-1 <br /> BOX USE WITH A POUBLE <br /> POPPET SREAR VALVE L.FF-i i i PER PLAN <br /> _ I r a BLACK GONG. <br /> 2' A.O. SMITH ENTRY BOOT blb" 2 1/Ib" <br /> PIPING <br /> _ EY5 ELEG. SEAL OFF <br /> /2" GEGFLEX FITTING PER NEC ENVIRON CONTAINMENT <br /> PIPING- J TEE FITTING ART' 514-5 DISPENSER SUMP LONG. FOOTING <br /> GGNNEGTOR TUBE TIDE VIEW FRONT VIEW --------------------------------------------- BOTTOM OR <br /> FOOTING <br /> (N) DEEP DISPENSER SUMP 10 (N) ADVANTAGE SERIES MPD ELEVATIONS VAPOR IREGOVERY COMPONENTS <br /> C.NJ. 36' OIA, DUAL-PORT <br /> 16"0 MANHOLE 5 GALLON MANHOLE <br /> GNI a21PR-45 <br /> i---- OP'W IORM IMPACT <br /> VALVE - MALEC" 6337 <br /> TANKER ROOT INTRINSIC SAFE CIRCUIT FILL GAP GPW 11117 VAPOR CAP <br /> TANK 6AU5E PROBE GNI 36" EASYLIFT MANHOLE <br /> --_ <br /> (MODEL 06413 MAG 2) O E`aPLOSCN PROOF OPW 6337 O <br /> J BOX W/ CAMLGK9. GNI 07045 <br /> I' CONDUIT TOADAPTER < <br /> FILL ADAPTER o <br /> TANK GAUGE - 5EAL OFF OFA 16H VAPOR <br /> CONTROL UNIT'—� ADAPTER :N <br /> -_- ----- - � TO NEXT TANK . . <br /> ` 4"-0 RISER _ A <br /> --- GASOLINE FLOAT - - Lo <br /> -------- --- -- TANK SLAB (o ' <br /> 5TABLIZER BAR <br /> 2"0 FIBERGLASS 51NOLE ---- -- ------- <br /> �— WALL PIPE TO VENT RACK RED JACKET (� <br /> - I/2" GALV. PIPE - TURBINE <br /> WATER FLOAT 4" 0 RISER r Z ® <br /> to------------ - -------- <br /> ENVIRON TANK SUTE5T BOOT ® _JMP-- <br /> p �,{ INTRINSIC SAFE �• <br /> (N) MPAC VALVE (N) TANK (;3AU5.E DETAILG CIRCUIT 4' DIA 11/2" ENVIRON 6EOFLU <br /> EX <br /> E --DPW 233 - M5D RISER ► PIPING W/ SECONDARY a <br /> - - - <br /> W/ 53 - VM EXPLGSIoN CONTAINMENT Q <br /> _ VARIES SEE PLAN OPENING IN I5LAND FOR CONDUIT - -- - - ------- PROOF J-BOX _ <br /> V.R. 0 PRODUCT PIPING RISERS - N O <br /> A 5EAL OFF < -, <br /> " X b" - 010 X 010 W.W.F. ' <br /> —\ 2' RADIUS ITYP.) 6 <br /> Z4 2" DIA. HALF MOON EMGO-WHEATON <br /> SAURDIAN <br /> 1 � <br /> U PER PLAN 2110 OR 3'0 A.D. SMITI <br /> Q <br /> °.y�:M +�- "= PHASE 11 V.R. PIPING DISFEN5ER ISLAND <br /> .r OR CANOPY COLUMNNEW CONDUIT �- - RUBBER COMPRESSION <br /> CONTINUOUS <br /> SHEET 5D-0 " FLEXIBLE ENTRY BOOTS <br /> VEEDER ROOT LIQUID <br /> 43 BAR ON71NVOU5 11 n n <br /> TEST TUBE i�+•'n <br /> 3-O LEAK SENSOR DETECTOR 1����I ORA 233 VENT-VM <br /> BOTTOM OF TANK (MODEL 0'1443 )� il <br /> —_-- —"- DYED CONCRETE 42;jpq ",JI� XTRAGTOR <br /> A VERIFY W/ "USA" REP. BACKFILL W/ SAND <br /> LOA END x <br /> PLAN VIEN ISLAND FOSTEEL <br /> 53-V <br /> RMS 5EGTION A55-VM <br /> UNDER GROUND STORAGE TANK <br /> (N) DISPENSER ISL AND DETAIL a (N) FILL $ PHASE I REGOVERY 4 (N) TURBINE/SUMP 2 <br /> NOTES: q. ALL TANKS ARE METHANOL COMPATIBLE. __J_ <br /> 250 <br /> I. MONITOR SYSTEMS FOR TRE INTERSTICE SHALL IB BY A LIQUID 10, ALL FROLTKT PIPIND SYSTEMS ARE PRESSURED. 250 <br /> IN <br /> ArG_ , BY NCE HL DETERMINATION, OR BY AUDIBLE DETERMINATION, FILL WITH LONG. <br /> IN ACCORDANCE WITH APPLICABLE LOC-AL AND STATE REGULATIONS. II, ALL DISPENSING DEVICES SHALL BE UL. LISTED. <br /> 2. @ACKFILL MAY BE SAND, PEA GRAVEL, 3/4" ROUNCEP AGGREGATE, 12. THE DISPENSERS SHALL BE NOT CLOSER THAN 10 FEET FROM ANY _ 5" 9O, X I/4" STEEL, TUBE <br /> OR NATIVE SOIL IN ACCORDANCE WITH MANUFACTURER'S CURRENT BUILDING. I <br /> INSTALLATION INSTRUCTIONS. FILLED W/ CONCRETA <br /> 13, DISPENSERS SHALL BE AT LEAST 20 FEET FROM ANY SOURCE Cr �- 16.0 BLACK <br /> 3. SEE DRAI41NO FOR NUMBER OF FITTIN05, CONFI6URATION, ACCESS- 16NITION. STEEL LID <br /> CRIES AND SUMP RISER OETAIL5. 3" BLUE CERAMIC .Q BNwr TITLE ' <br /> 14. PRODUCT PIPING SHALL BE TESTED AT 5OP51 FOR 30 MIN. PRODUCT TILE FLUSH MOUNTED ,T PIPING DETAI(_5 <br /> 4. THE DESI*N, ASSEMBLY ANP TESTING OF THE PIPINO SYSTEM SHALL PIPING SHALL NOT BE CONNECTED TO THE TANK PRIOR TO TESTING. RED - , I <br /> BE IN CONFORMANCE WITH THE APPLICABLE SECTION OF ANSI-51 Fa <br /> DpAWN 8Y ppAyyNp <br /> AMERICAN NATIONAL STANDARD CODE FOR PRESSURE PIPING, AND 15. NO TANKS GR PIPING SHALL BE CONCEALED PRIOR TO FIRE DEPT. WHITE PER PLAN M.E.M. 065PP2.DWC„ FPA 30, FLAMMABLE AND COMBUSTIBLE LIQUID CODE. APPROVAL m F{ NATURAL CONCRETE - NOTEt SCAM ARIES Jo5. ALL ASSOCIATED PIPING SHALL BE PROTECTED FROM CORROSION. 16. ALL TEST GAUGES SHALL BE PROVIDED BY THE INSTALLER. THE BLUE I FINISH W/ HEAVY SEEPLANS FGRGAUGES SHALL BE CALIBTATED IN I/2 P51 INCREMENTS. 1 SANDBLAST FINISH i - LOCATION DATE STARTED DATE 91J6hQTf3'1 <br /> b TLS-550 WILL BE PROORAMMED FOR A POSITIVE SHUT DOWN ON GLOSS 6_2g_g7 <br /> PRODUCT PIPING IN CASE OF A LEAK. I1. NO TANKS WILL BE REMOVED. I :P <br /> tlY SHIT SHEET # <br /> 1. VENT, V R. ! PIPINO LINES FOR TANKS 514ALL BE INSTALLED o 1/6” 16. THE FIRE CEP'T. AND/OR ENV. HEALTH DEPT. WILL INSPECT/ APPROVE - NATURAL CONCRETE 210 DRAIN 4'-0" X Ib" DIA, <br /> RE FOOT SLOPE AND SHALL BE SLOPED BACK TO THE TANK FINAL OCCUPANCY 51GN-CFF PRpDUGT PIPING HYDRO TE5T, AND FINISH W/ HEAVY GONG. F00TfN6 <br /> PRODUCT TANKS. ALL REOUIREMENTS SHALL BE COMPLETED PRIOR SANDBLAST FIN15H ! , 19 <br /> S. ALL MANHOLES SHALL BE LIQUID TIGHT, SECURABLE, ! TRAFFIC TO FINAL OCCUPANCY CLEARANCE. 71HE FIRE DEPARTMENT SHALL SLOSS PP- 2 <br /> � I' <br /> RELATED. BE 36" G.N.I. IVEN 24 HOURS MINIMUM NOTICE MCR TO ALL INSPECTION5. t- f 6!� <br /> A - . EASY LIFT TLR51NE MANHOLE - OF <br /> B - 36' G.N.I. DUALPORT OVER5PILL PROTECTOR Iq. ALL TANK MANHOLES SHALL BA A MINIIMvM I' ABOVE GROUND <br /> G - Ib" C.N.I. MONITOR MANHOLE Iq. ALL PIPING SHALL BE INSTALLED BY MIANAFAGn;RE'55FEG5. IG2U K GRETEI TRASH GAN C OUIK GRETEI PLANTER (N) 511 50. STEEL "OST 3 <br />