Laserfiche WebLink
W <br /> BACKFILL MATERIAL, NOT MEETING THE AFPROVE12 MATERIALS PRESSURIZE THEE INNER TANK FIRST. PRESSURE MUST BE IP YOU FIND FREE PRODUCT ON THE WATER TABLE, IN HARD OI OENERAL REQUIREMENTS <br /> SPECIFICATIONS, OR IF CONTRACTOR DOES NOT FURNISH THE 4 P51& MINIMUM W)TH A MAXIMUM VALUE OF 5 PSI*. 'SOLID POCKET, OR WHEREVER, SAFRWARO THE SITE AND z <br /> REOUIRED EVIDENCE THAT MATERIAL MEETS THE APPROVED 50AP TEST ALL FITTING ON PRIMARY TANK. SOAP 2- IMMEDIATELY CONTACT THE COMPANY REPRESENTATIVE FOR <br /> SPECIFICATIONS, WILL BE CONSIDERED ALTERNATE MATERIAL. PLU65 BEING CAREFUL TO KEEP MOISTURE FROM ENTERING ASSISTANCE. ON-SITE TANK ACGEPTANGE,. THE GON7RAGTOR 19 RESPONSIBLE O <br /> THE SPACE BETWEEN THE TANKS. HOLD ,TEL OF I/2 FOR INSPEGTIN6 THE TANKS FOR DAMAGE UPON RECEIPT AT THE ® r• <br /> INSTALLATION OF APPROVED MATERIALS, MATERIAL MUST BE DRY AND HOUR. RELIEVE TANK .PRESSURE E IMMEDIATELY UPON - NOT LEAVE! SITE 517E UNATTENDED UNTIL RELEASED 8Y THE JOB SITE. ANY VISIBLE DAMAGE IS 70 BE NOTED ON THE Q <br /> FREE OF ICE AND SNOW, PRIMARY <br /> TA THE TETT. REMOVE THE 2' PLUG FROM THE PO O :y� 1 Q N <br /> PRIMARY TANK. INSTALL PRESSURE APPLICATION SYSTEM COMPANY REPRESENTATIVE. NOTIFY THE FIRE DEPARTMENT IF DELIVER RECEIPT, IF NO VISIBLE DAMAGE, TANKS 9Fi0'JLD BE `�G' <br /> PREPARE THE TANK BED PER BEDOIN6 PROCEDURE, SET THE TANKS IN OUTER TANK. MAKE SURE THERE 15 A'PAS$A6E UPON ANY POSSIBILITY OF 16NMON. ALL FREE PRODUCT WILL BE RECEIVED WITH "SUBJECT TO DAMA60 FOUND PURING PRE fn h 0) CE) <br /> O <br /> ON THE BED WITH THE PROPER SLOPE, PLACE A 12' LIFT OF BACKFILL INTO THE INNER TANK. PRE5%RtZE THE ENTIRE SYSTEM REMOVED FROM THE 517E AT THE DIRECTION OF THE COMPANY INSTALLATION PRESSURE TEST waI ON THE FRPIC-HT ay �/� 4 O <br /> EVENLY AROUND THE TANK'S. (INNER AND OUTER TANKS) TO 4 PSI& MINIM NM ANP 5 REPRESENTATIVE. THE CONTRACTOR IS RESPONSIBLE FOR OFF-LOADING THE TANKS U <br /> PRI& MAXIMUM. SOAP TEST COMPLETE OUTER TANK. FROM THE TRUCKS. (/( <br /> PUSH BACKFILL COMPLETELY UNDERNEATH THE TANK AND UNDER THE RELIEVE PRESSURE WHEN COMPLETE. IP GONTAMINLATED SOLID IS ENCOUNTERED, IMMEDIATELY <br /> END GAPS. THIS 15 THE MOST IMPORTANT PART OF THE BACKFILL CONTACT THE COMPANY REPRESENTATIVE FOR ASSISTANCE. THE CONTRACTOR.ACCEPTS FULL RESPONSIBILITY FOR PROPER ro <br /> THE c6 co <br /> TANK TOP.(PRIF A M CAN N DONE FORM THIS BANK OR ADJACENT SS <br /> THE TANK TOP. tP A MAN 19 IN THE HOLE TO "WORK" THE BACKFILL, AFTER INSTALLATION PRESSURE TEST, TANKS ARE TO BE HANDLING AND INSTALLATION OP THE UNDERGROUND TANKS AND 0 � <br /> THE HOLE MUST BE SHORED OR 510E SLOPED) NO EXCEPTIONS. TESTED TO A 4 PSIO MINIMUM, 5 P510 MAXIMUM AFTER BEING PIPING ANP SHALL INSURE WORKMANSHIP, PRACTICES Q DO <br /> INSTALLED IN THE TANK HOLE AND THE BACKFILL 15 TO THE 05 EXCAVATION AND CONSTRVOTION PROCEDURES ARE POLLOWED DURINI6 THE . CCCC��Q�JJJ pC <br /> PLACE THE SECOND 12" LIFT OF BAGKPILL EVENLY AROUND THE TANKS. TOP OF THE TANK, ALL RISERS, SUSHIN05, PLU69 AND PIPE HANDLING AND INSTALLATION OF THE TANKS AND PIPING; (LIST <br /> AGAIN, REPEAT THE "WORKING" OF BACKFILL UNDER THE TANK AND CONNECTIONS ARE TO BE INSTALLED TO GRADE AND TIGHT PRIOR HOLE SIZE, r <br /> UNDER THE END CAPS AND BACKFILL EVENLY AROUND THE TANKS UP TO THE APPLICATION OF THE TEST (TO INSURE ALL FITTIN65 TESTING, THE CONTRACTOR 19 RESPONSIBLE FOR ALL LABOR <br /> a TO THE TOP OF THE TANKS. A7 THE TANK ARE LEAK FREE). STABLE SOIL. HOLE IS TO BE LARGE ENOUGH TO ALLOW MATERIAL AND EOOPMENT REQUIRED TO CONDUCT THE FOLLOWING ` Q <br /> BACKFILL 70 5U561RAGE AFTER PIPING AND TESTING, ETC,.. 15 IN PRESSURE RELIEF SYSTEM SET 9 P51& IS TO Be <br /> 24" MINIMUM BETWEEN TANKS AND 24" MINIMUM BETWEEN TESTS, <br /> COMPLETED. INSTALLED IN 7NEYENT PIPING OONNNN9TREAM OF THE SWING TANK 910E AND END GAPS AND THE WALL OF THE TANKS <br /> JOINT AT THE TANK. HOLE. I. TANK PRE-IN5TALLATION PRESSURE TEST, AIR. <br /> ALTERANTE MATERIALS: ANY BACKFILL MATERIAL NOT MEETING THE 2. TANK AFTER INSTALLATION PRESSURE TEST. <br /> SPECIFICATION OF APPROVED MATERIAL. APPROVAL OF THE COMPANY THE FOLLOWING STEPS MUST BE TAKEN BEFORE APPLYING UNSTABLE 501L. HOLE 19 TO BE LARGE EN0V6H TO 5. INTERNAL MEASUREMENTS. <br /> REPRESENTATIVE 15 NEEDED PRIOR TO USING ALTERNATE MATERAIL5 PRESS(AE, REMOVE 2' 0 PLUG FROM INNER TANK. INSTALL 6' ALLOW 24" MINIMUM BETWEEN TANKS AND A MINIMUM OF <br /> NSE OF CERTAIN MATERIALS WILL REQUIRE THE COMPANY TO OBTAIN PLUG AND RISER IN OUTSIDE TANK. INSTALL 1/2 THE TANK DIAMETER BETWEEN TANKS 51VE5 AND END DOCUMENTS; DRAWIN05 AND SPECIFICATIOONS ARB COOPERATIVE, <br /> WRITTEN APPROVAL THE TANK MANAFACTURER TO PRESERVE THE TANK APPLICATION SYSTEM INTO FILL ASSEMBLY. PRESSURIZE CAPS AND THE WALL OF THE TANKS HOLE. UNSTABLE EXECUTE WORK INDICATED IN ONE Ag IF INDICATED IN BOTH. <br /> WARRANTY). THE TANK HOLE MUST BE SHORTED OF SIDE SLOPED AS ENTIRE SYSTEM TO 4 PSI* MINIMUM, 5 P91& MAXIMUM, MAKING SOLID IS DEFINED AS HAYING LESS THAN "150 L55Y 50. WORK NOT DETAILED OR SPECIFIED, BUT REQUIRED 70 COMPLETE <br /> MEN WILL HAVE TO ENTER 70 COMPACE AND TEST THE BACKFILL. SURE THERE 15 A PAS5A6EWAY BETWEEN THE INNER AND OUTER FT. COHESION, AS CALCULATED FROM AN UNCONFINED THE INSTALLATION MUST BE BROU'F.,HT TO THE ATTENTION OF THE <br /> TANKS' COMPRESSION TEST, OR SOILS WITH AN ULTIMATE COMPANY REPRESENTATIVE PRIOR TO IT'S PERFORMANCE AND <br /> ALL ALTERNATE MATERIAL MUST BE COMPACTED 70 A MINIMUM OF BEARING CAPACITY OF LESS THAN 5,500 -55JSO. FT. SHALL BE THE SAME QUALITY AND TYPE AS WORK DETAILED OR <br /> 90% RELATIVE DENSITY (A5TM D-1551-TON. CONTRACTOR 15 TO FURNISH ALL TANK FITTIN65 AND PIPE CONNECTIONS ARE TO BE L005E SAND, MUCK, BOG, PEAT, SWAMP OP LANKFILL SPECIFIED. CONTRACTOR SHALL VERIFY ALL DIMENSIONS ANO <br /> THE COMPANY REPRESENTATIVE WITH A CERTIFICATION OF COMPACTION THOROUGHLY 50AP TESTED AND CHECKED FOR LEAKS. HOLD THE WHERE SOIL 15 SOFT ARE GENERALLY OONVIPEKED CONDITIONS ON THE 517E AND REPORT AT ANGE (PRIOR TO <br /> PROM A REGISTERED SOIL ENGINEER. TEST FOR 1/2 HOUR TO CHECK THE TANK FOR DAMAGE DU'RINB <br /> INSTALLATION. 'THE COMPANY REPRESENTATIVE 15 TO WITNESS UNSTABLE 501L9. START OF WORK) ANY DISCREPANCIES FOUND BETHEEN DRAWINGS. <br /> THE COMPANY REPRESENTATIVE IS RESPONSIBLE FOR PROVIDING THE AND RECORD THIS TEST, RELIEVE PRESSURE WHEN TEST 15 SPEGIFGATIONS AND SITE CONDITIONS. UNDER NO <br /> EXACT INSTALLATION SPECIFICATION FOR ALTERNATE MATERIALS - COMPLETE. USE OF FILTER FABRIC TO LINE AND PERMANENT SHORING GIR"MSTANGES, SHALL THE WORK IN OUESTION BE STARTED IF <br /> SEE UNDERGROUND TANK AND PIPING INSTALLATION MANUAL FOR TO STABILIZE THE HOLE IN UNSTABLE SOLID WILL ALLOW A OISGREPANCY 15 DISCOVERED AFTER THE AWARD OP THE <br /> SPECIFICATIONS ON INSTALLATION OF REMOVE 6" O PLUG. REINSTALL 2" 0 PLVO IN INNER TANK AND A REDUCTION TO 24" MINIMUM BETWEEN TANK VP55 AND CONTRACT. TERMS OF THE CONTRACT APPLY TO THIS WORK. <br /> TI&HTEN. PRESSURIZE INNER TANK TO 4 P516 MINIMUM, 5 END CAPS AND THE WALL OF THE TANK HOLE, CONTRACTOR SHALL PEEP A COMPLETE SET OF PRANIN69 AND <br /> STONE AND GRAVEL Cn''SHIN65 P81G MAXIMUM. STAR 2" PLU65 BEING CAREFUL TO KEEP SPECIFICATIONS FOR THE HORK ON THE JOB SITE AT ALL <br /> SAND MOISTURE FROM ENTERING SPACE BETWEEN TANKS, HOLD THE HOLE DEPTH: HOLE MUST BE DEEP ENOUGH TO ALLOW A MINIMUM TIME5 CURI49 THE PERFORMANCE OF WORK. <br /> SAND WITH HATER COMPACTION TEST FOR 1/2 HOUR TO CHECK THE TANK FOR DAMAGE. OF 12" DEEP BED OP WPEGIFIED MATERIAL UNDER THE TANKS. <br /> CONTROLLED DENSITY FILL (CPF) PRECAUTIONS, CONTRACTOR c <br /> NOTE, AT NO TIME SHOULD O THE OUTER TNK Be PRINNE RIZED - ..TALL PROTECT ADJOINING <br /> BALLASTS: CLEAN, POTABLE WATER i9 TO BE! USED AS BALLAST UNDER WITHOUT A PA55AGEWAY OPEN FOR AIR INTO THE INNER TANK. THE TANK BURIAL DEPTH 19 TO Be MEASURED AT THE REMOTE PROPERTY, EARTHWORK, TREES, ETC. FROM DAMAGE AND SHALL <br /> ALL CONDITIONS h,HERE BALLAST 15 REOUIRED. PUMP OPENNG. (THE CALCULATION MUST CON51VER PIPE GIVE PROPER WRITTEN NOTICE OF PROPOSED WORK TO APJOININ(9 <br /> IF A HYDROSTATIC TEST 15 REQUIRED BY THE LOCAL AGENCY, BURIAL DEPTH AT AND LENGTH OF RUN TO THE PUMP BLOCKS PROPERTY OWNERS OF TENANTS IF THE WORK MAY IN ANY WAY <br /> DRY HOLE CONDITION: THE CONTRACTOR 19 TO ISOLATE THE TANK FOR TESTING AND (SEE SECTION OF PIPING), YARD SLOPE, AND TANK MANHOLE INTERFERE WITH THE NORMAL CONDUCT OF, THEIR BUSINESS OR <br /> RECONNECT WHEN TESTING 15 COMPLETE. THE HYDROSTATIC DIMENSION5) ENJOYMENT OF THEIR PROPERTY. SHOULD ANY DAMAGE OCCUR <br /> TANKS WITH BACKFILL SUEORADE MAU5T BE BALLASTED IF TEST WILL BE OBTAINED BY USA PETROLEUM CORPORATION DUE TO THIS WORK, THE CONTRACTOR SHALL MAKE REPAIRS AS <br /> THERE 15 ANY CHANGE THAT SURFACE OR 5UB5U'RFAGE MATER (COMPANY) REPRESENTATIVE. NOTE, IP UNEXPECTED WATER 19 ENCOUNTERED, IMMEDIATELY REQUIRED t0 THE SATISFACTION OF THE COMPANY <br /> WILL ENTER THE TANK HOLE TO A DEPTH OF 23° OR GREATER CONTACT THE COMPANY REPRESENTATIVE FOR PIREGTION REPRESENTATIVE. PROTECT COMPLETE WORK FROM DAMAGE UNTIL <br /> ABOVE THE BOTTOM OF THE TANKS. CAUTION - DO NOT ALL MANWAY LIPS, MUST BE PRIMED. NEVER FILL THE ANNVLU5 BEFORE COMPLETING THE EXCAVATION 17 15 ACCEPTED BY THE COMPANY REPRESENTATIVE. <br /> BALLAST TANKS UNTIL BACKFILL 15 TO THE TOP OF TANKS, WITH A FLUID. FILLING THE ANNULUS WILL VOID ALL <br /> EXCEPT IN NET HOLE PROCEDURES. WARRANTIES. _ BEDDING, A 12" MINIMUM BED OP BACKFILL MATERIAL 15 TO SUPERVISION AND COORDINATION, .GENERAL CONTRACTOR 15 <br /> NET HOLE CONDITION, IF THE TANKS ARE BALLASTED, DRAIN TANKS TO 6" FROM THE BE PLACED IN THE HOLE, SMOOTHED ANP 5LOFED TO ALLOW A RESPONSIBLE FOR FROORE55, EXECUTION AND OVALITY OF SUB- <br /> TOP OF THE TANK AND PRESSURIZE WITH AIR. THE 6" SPACE TANK SLOPE 1" IN TEN FEET DOWNIHAARD TO THE FILL END PRIOR CONTRACTOR'S WORK AND SHALL COORDINATE AND EXPEDITE <br /> ATTEMPT TO DEHATER THE TANK HOLE TO MAINTAIN A 'CRY" 15 TO INSURE WATER 15 NOT PUSHED INTO ANNULAR SPACE. TO SETTING THE TANK. PROCUREMENT OP MATERIALS AND PERFORMANCE OF WORK OF <br /> HOLE CONDITION. P UNABLE TO OBTAIN A DRY HOLE CONDITION, RESPECTIVE TRADES AND 5U8-CONTRACTORS. GENERAL <br /> MAINTAIN THE MINIMUM WATER CONDITION A5 POSSIBLE. SET EXTREME GARS 15 TO BE USED AROUND AND NEAR THE ONION - DO NOT PLACE FRP TANKS ON CONCRETE SLAB, CONTRACTOR IS TO HAVE THE SAME QUALIFIED RESPONSIBLE <br /> TANK IN HOLE, PARTIALLY FILL WITH WATER UNTIL It SINKS PRESSURIZED TANK, Be SURE TO RELIVE THE FRE55ME PRIOR TIMBERS, BEAMS OR CRADLES OR 6ROUT THE YANKS IN NET REPRESENTATIVE, WHO UNDERSTANDS AND SPEAKS ENGLISH <br /> FIRMLY ON THE BED. USE ONLY ENOUGH HATER TO BALLAST TO REMOVING ANY FITTIN65. CEMENT, TANK, WHETHER TIED DOWN OR NOT, MUST NEVER BE FLUENTLY, ON THE JOB AT ALL TIMES, INCLUPIN6 THE TIME <br /> TANK UNTIL BACKFILL 15 TO THE TOP OF THE TANK. AFTER LEFT ON THE BED WITHOUT BAGKPILL TO THE TOP OF THE TANK FOR ESTABLISHING AND MAINTAINING ALL LINES, LEVELS AND N` <br /> BACKFILL IS TO THE TOP OF THE TANK, FILL TANK WITH WATER NO TANK THAT SHOW5 ANY EVIDENCE OF LEAK IS TO BE KEPT IN IF THERE 15 ,CHANGE OP.WATER 12' OR MORE ABOVE THE GRADES SHOWN ON THE PLAN'S OR OTHERWISE REO/IRED. <br /> TO REPLACE OR HAVE REPAIRED ANY LEAKYAN <br /> UNTIL COMPLETION OF INSTALLATION, THE SYSTEM. THA COMPANY REPRESENTATIVE 19 RESPONSIBLE TANKS BOTTOM, IN THE HOLE. GENERAL CONTRACTOR Ig A MAINTAIN THE SITE IN A O Q <br /> F FAULTY TANKS. <br /> CAUTION - BALLAST LEVEL MUST NEVER EXCEED WATER OR (GONTRAGTOR IS TO REIMBURSE THE COMPANY FOR ANY DAMAGE ACCESSIBLE CONDITION FOR OTHER TRADES AND CONTRACTORS. <br /> BACKFILL HATER LEVEL IN HOLE CURM6 INSTALLATION. TO THE TANK DURING THE INSTALLATION) HOLE 5HORIN6/5IDE SLOPING, NO PERSON SHALL ENTER A TANK y <br /> HOLE BELOW THE FIVE FOOT DEEP LEVEL UNLESS THE WALLS ARE SAFETY: CONTRACTOR SHALL PERFORM THE WORK IN ACCORDANCE <br /> REMOVAL, DO NOT REMOVE BALLAST UNTIL TANK SLAB HAS HANDLING SHORED OR SIDE SLOPED AS PRESCRIBED BY CURRENT OSHA WITH SAFE PRACTICES, TAKING ALL REASONABLE PRECAUTIONS <br /> BEEN POURED. DO NOT SET REMOTE FUMP UNTIL WATER HAS - REGULATIONS, NO EXCEPTIONS STATE REOUIREMENTS THAT TO PROTECT THE FACILITY AND ADJACENT FACILITIES, <br /> BEEN REMOVED FROM THE TANK. LIFTNG/MOVIN6, WHEN LIFRING OR MOVING ANY FRP TNK, ARE MORE RESTRICTIVE THAN COMPANY 5PEOP14-ATIONS ARE TO WORKMEN AND THE PUBLIC AND PROBIVIN6, WHERE REASONABLY <br /> ALWAYS USE PROPERLY SIZED EQUIPMENT AND LIFT BY THE BE ADHERED TO A5 THOOH SPECIFIED IN COMPANY NECESSARY, BARRIERS, 6UARD5, TEMPORARY BRIPOE9,.LIGHTS <br /> TANK HARDWARE: LIFTING LU6(S). SPECIFICATIONS. THE CONTRACTOR 15 RE5PONSIBLE FOR ANY AND WATCHMEN: WHILE ON THE PREMISES OF THE COMPANY OR LID <br /> ^ <br /> THE COMPANY WILL FURNISH THE FOLLOWING HARDWARE UNLESS NEVER ROLL OR USE GABLES OR CHAINS AROUND ANY FRP TANK. DESIGN, MATERIALS, EOUIPMENT, PERMITS, ETC. FOR SHORING ITS AFFILIATES, ALL OF THE COMPANY'S SAFETY RULES SHALL V/ <br /> OTHERWISE SPECIFIED BY THE COMPANY REPRESENTATIVE. SET ON SMOOTH GRO.NO, FREE OP ROCKS AND FOREIGN OBJECTS OR SIDE SLOPING A HOLE. CONTRACTOR MAY ELECT TO SHORE BE STRICTLY OBSERVED; IN PARTICULAR, NO 5MOKIN& SHALL //\ <br /> ANY TANK HOLE AT H15 SOLE OPTION. BE ALLOWED ON COMPANY PROPERTY HHEN GASOLINE IS PRESENT \Y <br /> FILL ASSEMBLY - PRODUCT, ADAPTER DUST GAP AND EXCEPTION - TANK CAN BE ROLLED UP TO 90 ON A SMOOTH, ON THE SITE. CONTRACTOR SHALL NOT PERFORM OR PERMIT <br /> NAMEPLATE HOLDER GLEAN SURFACE HHEN PERFORMING THE "BEFOORE INSTALLATION" COMPANY REPRESENTATIVE 15 t0 SPECIFY TO THE CONTRACTOR ANY ACT ON THE PREMISES OF THE COMPANY OR ITS N <br /> PRESSURE TEST. ANY TANK HOLE THE COMPANY DEEMS 15 NECESSARY TO SHORE. AFFILIATES SHICH IWOLV65 A FIRE OR EXPLOSION HAZARD, <br /> PRODUCT MEASUREMENT DEVISE INCLUDING WELPIN6, TORCH CUTTING AND DI5P05AL OF DEBR15 Z (] <br /> TANK GAVGE CHOKINO: TANKS ARE 70 Be CHOCKED UNTIL READY FOR BY BURNING WITHOUT PRIOR WRITTEN CONSENT OF THE COMPANY. srcq <br /> INSTALLATION. IF AiNDY CONDINON5 EXI5T OR IS EXPECTED, 02 REMOVAL OF OLD ?AUKS AND LINES ® O c <br /> VAPOR RECOVERY - PHASE I TIE TANKS DOWN U91NG MINIMUM 1/2 INCH NYLON OR HEMP ROPE <br /> ADAPTER, COST CAP AND 'NAME PLATE HOLCER OVER EACH TANK AND TIED TO STAKES OF ADEOVATE SIZE TO 04 DOUBLE WALL FIBEROLAS5 TANKS <br /> REMOTE PUMP (SUBMERSBLE) WdTH RELAY CONTROL BOX PREVENT MOVEMENT OF THE TANKS. 02 REMOVAL OF OLD TANKS AND LINES V <br /> ACCEPTABLE ROCKS,HOO MAND OT 5 ARE: USED TIRES S RUBBER TESTING CONTRACTOR A5 PART OF THE CONTRACT, WILL REMOVE OLp <br /> PILLBOXES - 12" AND Ib" DIAMETER UNA C E ABLE! C WOOD AND OTHER R161D MATERIALS ARE TANKS (IF REQUIRED) AND SHALL DISPOSE OF OLD TANKS ANp �.n <br /> UNACCEPTABLE CHCCKINO. GENERAL, NOTIFY COMPANY REPRESENTATIVE YyiO N4i9T ® - <br /> VENT VALVE ASSEMBLIES WITH BALL CHUCKS CBSERVE ALL TESTS AT LEAST 24 HOURS IN ADVANCE OF ANY FILL HOLE PER LOCAL ORDINANCE. <br /> OPENING'S: TANK OPENINGS ARE TO REMAIN CLOSED BUT TEST L <br /> ALL PRODUCT TAC-5 FOR IDENTIFICATION VENTED AT ALL TtIYE5 EXCEPT CURNG THE TEST. COMPANY REPRESENTATIVE 19 RE5PONVOLE YO REMOVE ALL N O <br /> SU15MER6E FILL TUBES DAMA&E, IF TANK 15 DAMAGED, DO NOT ATTEMPT REPAIRS. THE PRESSURE APPLICATION SYSTEM IS TO HAVE TWO PRESSURE REUSABLE PRODUCT FROM THE TANKS AND RETURN IT 70 THE ,J <br /> 6VA6E5 RANGE O TO 10 PSI IN THE 5Y9TEM, BOTH IN 6oOP TERMINAL OR OTHER COMPANY FACILITY <br /> GEPLAC.T COMPANY REPRESENTATIVE FOR REPAIRS OR CONDITION AND HAVIN6 BEEN TESTED AND CALIBRATED WITHIN A <br /> SUBMERGED FILL TUBI BOTTOM END Ig TO SLANT GUT A7 45d. HHEN REPLAGEMISNT, CONTRACTOR WILL FURNISH ALL , TOR, MATERIALS, EQUIPMENT <br /> SET, THE LOWEST POINT K. THE SLANT GUT WILL BE 4" MINIMUM FROM THREE-MONTH PERIOD PRIOR TO THE RNIS VEST (COPY OF THE AND PERMITS, EXCEPT AS, NOTED, TO REMOVE TANKS AND LINES <br /> THE Be6" MI OF THE TANK. THE HIGHEST POINT OF THE SLANT GUT 19 INSTALLATION TEST AND CALIBRATION DATA TO BE FURNISHED TO THE COMPANY PER THE FOLLOWING PROCEDURE. CONTRACT SHALL COMPLY WITH �J <br /> REPRESENTATIVE UPON RECkJE9Y). ALL CURRENT NFPA AND LOCAL RE6ULATION5. <br /> TO E 6" MINIMUM FROM THE BpTiOM1 OF THE TANK SISTTIN6. SET TANKS ON PREPARED BED WITH A SLOPE <br /> THE 8" MAXIMUM DIMENSION 15 M05AT CRITICAL DUE To AIR DOWNWARD TCWARD THE FILL END OP THE TANK. A SLOPE OF I" EXTREME CARE 15 TO BE USED ARGtl;ND AND NEAR THE <br /> POLLUTION RULES <br /> PER IO' OF THE TANK 15 DESIRED, THIS RESULTS IN A 2' PRESSURIZED TANK. BE SURE TO RELIEVE YHE PRESSURE EXCAVATE PRODUCT PIPING TO TOP OP TANKS - EXPOSE PRODUCT <br /> DE5IRED DIFFERENCE BETWEEN EXTREME OPENIN69 ON THE PRIOR TO THE TANK AND REMOVING ANY FITTIN(S5. DO PIPINI6 AT TANK. CARE MUST Be TAKEN TO PREVENT BREAKIN6. <br /> ORIENT THE SLANT CVT SUCH THAT INCGMIN6 PRODUCT IS DIRECTED TANK, THE ACCEPTABLE RANGE is 114 INCH MINIMUM TO 4' NOT INSTALL A TANK WHICH 51401,45 ANY EVIDENCE OF LEAKING. <br /> MAXIMUM, THE COMPANY REPRESENTATIVE SHALL BE RESPONSIBLE FOR 5UGTION SYSTEM - OPEN CHECK VALVE, PULL POPPET <br /> 45d MEASURED FROM TANK CENTER LINE TOWARD VAPOR RETURN. AND DRAIN PRODUCT FROM LINE <br /> TNKS THAT EXCEED THE ACCEPTABLE RANOU OF THAT SLOPE HAVING LEAKY OR FAULTY TANKS REPAIRED OR REPLACED. INTO TANK. 00 NOT REPLACE <br /> 05 TANK SLAB CM,^St BBRESEr THE REMOTE PUMP END ARE IMPROPERLY SET AND '50APING" THIS TANK AND FITTING CURIN$ THE TEST 15 TO BE POPPET. REINSTALL COVER ON <br /> DONE UVN6 A SMALL GARDEN TYPE PRESSURIZED SPRAY UNIT. VALVE. <br /> SAMPLE WELLS, TNO SAMPLE WELL SLOTTED PIPES, IN THE TEST 50AP SHALL Be A HIGH FOAMING 'SOAP' THAT PRESSURE SYSTEM - "BREAK' PIPE AT UNION AT REMOTE <br /> TANK SLAB WILL BE 6" MINIMUM THICKNESS, 5HOWN IN OPPOSITE CORNERS OF THE TANK HOLE, ARE TO BE INSTALLED. BUBBLES EASILY IF IN CONTACT WITH AN AIR LEAD IN THE PUMP. DRAIN PRODUCT INTO TANK <br /> DETAILS, REINFORCED PER DETAILS, WITH A 45d MITER ON ALL SAMPLE WELL PIPE 15 TO BE POSITIONED IN THE HOLE PRIOR TANK BUT WILL NOT BUBBLE DUE 70 D15PE'N91N6. <br /> CORNERS. TANK SLAB SHALL EXTEND A MINIMUM OF 24" BEYOND TO PLACING THE BEDDING MATERIAL, SUPPORTED TO REMAIN OR SEPARATE CONTAINER. <br /> PRONEGTEE) LIMIT OF THE COVERED TANKS. 51-A0 15 TO BE A VERTICAL WRING BACKFILL, AND WRAPPED WITH FILTER FABRIC ACCEPTABLE "SOAPS", <br /> UNIFORM THICKNESS LINER. THE BOTTOM OF THE SAMPLE WELL 15 TO BE 12" DO NOT - SANDBLAST, CUT OR ENTER TANKS ON THE SITE. <br /> MINIMUM BELOW iM+E BOTTOM OP THE TANKS. THE TOP OF THE ••SEAM TEST CONCENTRATE" <br /> MARK, IN NUMBERS, TANK 51ZE IN wrT' CONCRETE NEAR THE PILLBOX. PIPE 15 TO TERMINATE IN 12" 0 "SECURE' PILLBOX. SLOTTED AVOID SPILLS, GLEAN UP SPILLS. <br /> NUMBERS ARE 70 BE 3° HIGH AND I/4" DEEP. <br /> PIPE 15 TO BE FURNISHED BY VSA PETROLEUM CORPORATION, "AMWAY LOG H16H SOAP" <br /> UNLESS OTHERWISE INSTRUCTED BY THE COMPANY "*7006 SOUTHBEND LEAK DETECTOR" FLUSH ALL PRODUCT, VENT AND VAPOR RETURN LINES BACK IN <br /> ALL TANK FILLEI AND REMOTE PUMP PI7BOXE5 ARE TO Be REPRESENTATIVE. GR APPROVED EQUAL TANK OR SEPARATE CONTAINER(S). (FLU5HING IN SEPARATE <br /> RAISED 2" ABOVE ADJACENT SLAB GRACE5 WITH A 40" MINIMUM CONTAINERS CAN BE DUMPED INTO PRODUCT TANKS FOR <br /> TRANSITION. PERIMETER FILLBOXE5 ON TANK SLAB (SAMPLE NEI-1-5 BACKFILL MATERIAL INTERNAL MEASUREMENTS, INTERNAL DIAMETER MEASUREMENTS STORAGE) FLUSH EACH LINE WITH A PRODUCT <br /> INIMUM A S GALLONS <br /> OR MONITORS) ARE TO BE RAISED I" ABOVE GRACE WITH A DESIRED ARE TAKEN TWIGS AT TWO LOCATIONS, THE FILL AND THE VENT 5TWATER. <br /> 16" TRANSITION. BOTTOM OF THE SLAB 19 TO BE THICKENED 70 THE APPROVED MATERIALS, VALVE ASSENBLY OPENIN165, ON EVERY FRP TANK INSTALLED. OF - <br /> BOTTOM OF THE PILLBOXES - 12" MAXIMUM. <br /> "PET GRAVEL" OPEN ALL OPENINGS AND RINSE EACH TANK THREE (5) TIMES <br /> THE CONTRACTOR, WITNESSED BY THE COMPANY REPRESENTATIVE, - <br /> SLAB C . ( O COLORED BLACK AND TEXTURED WITH I NON-SKID AND REMOVE THE REHEATS THREE (3) TIMES FOR A TOTAL OF <br /> A GLEAN, NATURALLY ROINDED A66RE6ATE :NItH ANGULAR 19 RESPONSIBLE FOR MAKING AND REGCRpIN6 THE REQUIRED 200 GALLONS OF WATER (MINIMUM) USING HIGH PRESSURE SPRAY <br /> SERFAGE. ULAR T L T14E STEEL TROWEL, THEN BRUSH WITH BROOM PARTICLE SIZE I/6" MINIMUM AND S/4" MAXIMUM. NO MEASUREMENTS. COMPANY REPRESENTATIVE WILL FURNISH THE $1@T TM <br /> PERPENDIGVIAR TO THE LENGTH OF THE TANKS) OF THE TA WITH HAND AI "WASH DOWN" THE SIDES AND BOTTOM <br /> PARTICLE SHALL PA55 THROUGH A >•8 SIEVE. MUST MEET FORM FOR RECGRDIN6 INTERNAL MEASUREMENT DATA, THE FIRST TANK 6 PIPING NOTES <br /> A5TM G-53 PARA. 9.1 FOR QUALITY AND SOVNDNE55. SET OF MEASUREMENTS ARE TO BE TAKEN PRIOR TO PLACING ANY H1 THE TANK. SPRAY PAINT THE WORD "RINSED' IN LARGE (6" <br /> HIGH MIN) LETTERS ACROSS THE END THE TANK. DRAWN BY DRAWN(, <br /> BAGKPILL AROUND THE TANK. THE SECOND 9E CONTRACTOR I5 TO ARRANGE FOR AD V SL5LUUM TRUCK 41 COLLECT M.E.M. 065PP4.rJWG <br /> STONE OR GRAVEL CRU5HIN65 MEASWHEN LREMENtS ARE TO BE TAKEN N THE BACKGKPILL HAS ALL RECOVERED PRODUCT(LIGUID AND U46E), VAGWM TRUCK <br /> REACHED SUBORAPE (PRIOR TO PO.RIN6 THE CONCRETE SLAB), IS TO RETURN "RECOVERED" PRODUCT TO A REFINERY FACILITY S'� 'O Y <br /> WASHED STONE MINIMUM <br /> CR GRAVEL CRVSHINGS WITH ANGULAR PARTICLE WITH APPROVED Oti-MATER SEPARATOR SYSTEM. NO SCALE 65 <br /> SIZE 1/S" MINIMUM AND US MAXIMUM. NO PARTICLE SHALL PASS IF THE DIFFERENCE ANY TWO SETS OF READINGS IS <br /> THROUGH A +8 SIEVEDSO MUST MEET ASTM G-93 PARAGRAP6N 9.1 DATE STARTED DATE 9UEMT'TED <br /> FOR OUALI7Y AND SOUNDNESS. GREATER THAN I I/4 INCHES - STOP THE ,y,)@, CONTACT REMOVE TANKS FROMTHE GROUND AND PLACE IN A SECURE 6-25-9.1 <br /> COMPANY REPRESENTATIVE AND TANK MANUFACTURER. LOCATION. BLOCK THE TANKS TO PREVENT MOVEMENT. AFTER <br /> CONTRACTOR IS TO FURNISH THE COMPANY REPRESENTATIVE THE TANK HAS BEEN REMOVED FROM THE GROUND, OAS FREE SHEET %*:ET A <br /> WRITTEN EVIDENCE THAT THE BACKFILL MATERIAL MEETS PRE-I1,15TALLATION PRESSURE TEST, DOUBLE-WALL TANK 19 TO THE TANK AND MAKE IT READY TO BE REMOVED FROM THE SITE <br /> THE APPROVED MATERIALS SPECIFICATIONS, UPON REOt1E$T Be FRE55URE TESTED BEFORE BEING INSTALLED IN THE TANK IN ACCORDANCE WITH THE TANK DISPOSAL CERTIFICATION <br /> BEFORE ANY MATERIAL 15 PLACED HOLE. THE ENTIRE OUTER TANK AND FITTING ARE TO BE SOAP AGREEMENT, 1(j I.LII-.I Agr 9 6RF TO FSP RF QV "0 AND GIVEN TO' <br /> TESTED. TEST MUST BE OBSERVED BY THE COMPANY THE COMPANY R PR NFA' ATIVE PP- 4 <br /> � w <br /> REPRESENTATIVE. FOLLOW THIS TEST PROCEDURE. — LTL OF <br />