My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
501
>
2300 - Underground Storage Tank Program
>
PR0231358
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2022 2:07:20 PM
Creation date
11/5/2018 5:54:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231358
PE
2381
FACILITY_ID
FA0003590
FACILITY_NAME
M B P
STREET_NUMBER
501
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03731045
CURRENT_STATUS
02
SITE_LOCATION
501 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LODI\501\PR0231358\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
2/28/2017 4:36:11 PM
QuestysRecordID
3345444
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-e1t5- yyb i :04Att FRDt7 P 3 <br /> WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONTTORING PROGRAM <br /> 'this cnonitonng program must be kept at the UST location at au times. 'i"w inburmation on this monitoring <br /> program are conditions of the operating permit. The permit holder must notify san Joaquin County <br /> Environmental Health Division, phone (209) 46x;3420 within 30 days of any changes to the monitoring <br /> procedures.unless required to obtain approval bdare maidng the change <br /> Required by Sections 2632(d) and 2641(h) CCR- <br /> Facility <br /> CR.Facliry Name V11� E 130 hL1�61 e uuv Z�L . <br /> Facility Address_ _5Dl W, I �d� 14t/, <br /> A Describe the frequency of performing the momtoti W. <br /> Tank d a� 1_c4 <br /> Piping m eyrW t t , <br /> B. What methods and equipmen; identWed by name and model, will be used for <br /> performing the montterioF <br /> Tank U1lcvdy,,Ly - 56ciCylCn <br /> Piping rin a/ l u.dk. <br /> C. Describe the location(s) where the monitoring will be performed (facility plot plan <br /> should be attached): <br /> :U l- 4-M3 <br /> 5 <br /> 01 71 <br /> D. list the name(s) and title(s) of the people responsible for performing the monitoring <br /> and/or maintaining the equipment: <br /> J wi.w )3 6)11 d-,w , r>7";I(, <br /> )"ic- Amu,. car. <br /> At( <br /> E_ Reporting formar for monitoring:, . <br /> Tank_.�ci, l I"kc- icr bi <br /> Piping Wl oh i l"" W a <br /> F. Describe the preventive maintenance schedule for the monitoring equipment Note. <br /> Maintezmuce mast be in accordance with the manutactumsmaitatenaaee schedule <br /> but not less than every 12 months:_�/'3 i ! k_ YVJ/"icak_ ✓ u4-IloAl <br /> O� mBY7ih?Yl2c�. <br /> G. Describe the training necessary for the operation of UST system, including piping, <br /> and the monitoring equipment: D,(Wf' 7.e Y S M d C ,/)3f t l Uf 14),11 b4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.