Laserfiche WebLink
CCR.TrnE 23, <br /> DMs10N 3, CaMIMR 16, UNDERGROUND STORAGE TANK REGULATIONS CCR,TrnE 23, DMstON 3, cii rrm 16, UNDERGROUND STORAGE TANK REGULATIONS <br /> ;lease do not <br /> AttnCLE 7. CLOSURE REQUDUWENTs Post-V brand fax transmittal memo 7671 a the owner or <br /> �/t From that appropriate <br /> 2670. Gmeral Applicability of Article / (!� /�t�Y-i(�iwnd storage tank <br /> Ca. C0� he permit issued <br /> This article defines temporary and permanent underground storage tank Phone g 4closure and describes the nature of activities which shall be accomplished in OaPt- Zaglorder[o pro[ett water quality in each of these situations. Pax# o`�6pax#r L� :d release and that <br /> \ ntly closed <br /> (b) The temporary closure requirements of section 2671 shall apply to those <br /> underground storage tanks in which the storage of hazardous substances has - <br /> ceased but the underground storage tank will again be used for the storage of Decommissioned tanks and underground storage tanks, permanently closed on- <br /> hazardous substances within the next 12 consecutive months. At the end of 12 ()h site by cleaning and filling with an inert solid prior to January 1, 1984, need <br /> consecutive months during which the tank is temporarily closed,the local not comply with the closure requirements in this section unless required by the <br /> agency may approve an enension of the temporary closure period for a local agency. However,hazardous substances released from such tanks before <br /> 40 martimum additional period of up to 12 months. owners or operators shall or after the closure,shall be reported by the owner pursuant to Article 5 and <br /> complete a site assessment in accordance with section 2672(d) before an shall be cleaned up pursuant to section 13304 of the Water Code,Article 11 of <br /> extension may be granted by the local agency. The temporary closure these regulations,and any other applicable law or regulations. <br /> requirements of section 2671 do not apply to underground storage tanks that <br /> are empty as a result of the withdrawal of all stored substances during normal <br /> operating practice prior to the planned input of additional hazardous (j) A regulated tank shall t local g the requirements m subsectionsthe) and Link. <br /> (e <br /> of section 2672 before the local agency may gran p <br /> substances. <br /> (c) I he permanent closure requirements of section 2672 shall apply to those Authority: Health and Safety 25299.3, 25299.7 <br /> underground storage tanks in which the storage of hat,;dous substances has <br /> Reference: Health and Safery 25298; 40 CFR 280 70, 380.71; 280.73, and 280.74 <br /> ceased and the tanir:will not be used,or are not intended for use,forthe- <br /> storage of hazardous substances within the next 12 consecutive months. 2671. Temporary Closure Requiremm:a <br /> (d) The requirements of this article do not apply to those underground storage a An owner or operator shall comply with all of the following requirements to <br /> Links in which hazardous substances continue to be stored but no input or ( ) <br /> withdrawals are being made. In these cases,the applicable containment and <br /> monitoring requirements of Articles 3 or 4 shall continue' complete and maintain temporary closure of an underground storage tank: <br /> to apply. (1) All residual liquid, solids,or sludges shall be removed and handled in <br /> accordance with the applicable provisions of in accordance with Chapters <br /> •(e) During the period of time between cessation of hazardous substance storage 6.5 and 6.7 of Division 20 of the Health and Safety Code. <br /> and actual completion of underground storage Link closure pursuant to sec[ior <br /> 2671 or 2672, the applicable containment and monitoring requirements of 2 if the underground storage tank contained a hazardous substance that <br /> Articles 3 or 4 shall continue to apply. The time period between cessation of ( ) could produce flammable vapors at standard temperature and pressure,it <br /> hazardous substance storage and application for temporary or permanent-tank shall be inerted,as often as necessary,to levels that will preclude an <br /> closure shall not exceed 90 calendar days. Closure shall be completed within a explosion or to lower levels as required by the local agency. <br /> reasonable time period as determined by the local agency. <br /> A[least 30 calendar days prior to closure,or within a shorter period of time (3) The underground storage tank may iq filled with a noncorrosive liquid that <br /> (f) is not a hazardous substance. This liquid shall be tested and the test <br /> approved by the local agency,the owner or operator who intends to close a results submitted to the local agency prior to removal from the <br /> Link shall submit to the local agency for approval,a proposal for compliance closure period. <br /> underground storage Link at the end of the temporary P <br /> with section 2671 or 2672, as appropriate. <br /> (4) Except for required venting, all fill and access locations and piping shall be <br /> 7-2 <br /> 7- 1 <br />