My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
1629
>
2300 - Underground Storage Tank Program
>
PR0502782
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2022 12:05:17 PM
Creation date
11/5/2018 6:17:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0502782
PE
2381
FACILITY_ID
FA0009825
FACILITY_NAME
MANDAL TRUCK & TRAILER INC
STREET_NUMBER
1629
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
198-100-05
CURRENT_STATUS
02
SITE_LOCATION
1629 E LOUISE AVE
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\L\LOUISE\1629\PR0502782\BILLING 1985 - 1992.PDF
QuestysFileName
BILLING 1985 - 1992
QuestysRecordDate
7/27/2017 5:56:59 PM
QuestysRecordID
3533657
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA • cibo.""o <br /> STATE WATER RESOURCES CONTROL BOARDUNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM BCOMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 215 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ONSITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE /❑ 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: 6 iQL l/j SC ,[af ro <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-- SPECIFY IF UNKNOWN <br /> A. OWNERS TANK I.D.• B. MANUFACTURED BY: USF <br /> C. DATE INSTALLED(MO/DAY/YEAR) UH k I <br /> D. TANK CAPACITY IN GALLONS: <br /> II.TANKCONTENTS IFA-11S MARKED,COMPLETE ITEM C. <br /> A �1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C. ❑ 1aUNLFACED GULAR <br /> 3 DIESEL ❑ 6 AVI TION GAS <br /> ❑ OL <br /> 2 PETROLEUM ❑ 80 EMPTY � PRODUCT ❑ 1b PREMIUMUNLEADE ❑ 5 GET FUEL ❑ 7 ME HANOL <br /> ❑ 3 CHEMICALPRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.A: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B,AND C,AND ALLTHAT APPLIES IN BOX D AND <br /> A. TYPE OF ❑ 1 OUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTEDTANK) ❑ 99 OTHER <br /> B. TANK <br /> .LJ BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCI D PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 8 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING En3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING ❑ 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO_ <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION 91 NONE 0 9 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATIO CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U SUCTION A U 2PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A 105 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U S ALUMINUM A U 6 CONCRETE A U 7 ST EL W/COATING A U 8 100% METHANOL COMPATI LE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION [ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ 0 MONITTIAL <br /> ORING ❑ 99 OTHER <br /> V.TANK LEAK DETECTION <br /> F❑ 1 VISUAL CHECK 2 INVENTORY RECONCILIATION F-] 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING❑ 5 GROUND WATER ONITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING F-191 NONE E] 95 UNKNOWN ❑ 99 OTHER <br /> Fa <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? YES ❑ NO � <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED a SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE 1.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> STATE I.D.# <br /> COUNTY# JURISDICTION# FACILITY# TANK# /�� R16 <br /> � G 5 <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> //////✓/��/' F0110341-11 <br /> • • % <br />
The URL can be used to link to this page
Your browser does not support the video tag.