My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
15431
>
2300 - Underground Storage Tank Program
>
PR0507138
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2022 3:23:41 PM
Creation date
11/5/2018 6:38:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0507138
PE
2381
FACILITY_ID
FA0007710
FACILITY_NAME
KATZAKIAN PROPERTY
STREET_NUMBER
15431
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
LODI
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
15431 LOWER SACRAMENTO RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LOWER SACRAMENTO\15431\PR0507138\BILLING 1997.PDF
QuestysFileName
BILLING 1997
QuestysRecordDate
8/1/2017 4:54:04 PM
QuestysRecordID
3539862
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA . . ...... `1 <br /> - STATE WATER RESOURCES CONTROL BOARD p <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ® 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SITE <br /> ONE REM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 6 TANK REMOVED / <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: Katzakian Property <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNERS TANK I.D.s B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MOIDAY/YEAR) uk D. TANK CAPACITY IN GALLONS: O <br /> ILTANKCONTENTS IFA-11SMARKED.COMPLETE ITEMC. <br /> A. ® 1 MOTOR VEHICLE FUEL ❑ 4 OILS. C. � 1aREGULAR UN EA ED 3 DIESEL ❑ 6 AVIATIONGAS <br /> ❑ 2 PETROLEUM ❑ SO EMPTY �+ 1 PRODUCT ❑ 10PREMIUM 4 GASAHOL ❑ 7 METHANOL <br /> UNLEADED 5 JET FUEL <br /> F--] 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE O 2 LEADED 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.8: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.8,AND C,AND ALL THAT APPLIES IN BOK D AND <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM QI I 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> L_I <br /> B. TANK 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD WI FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ B 100% METHANOL COMPATIBLE WIFRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYO LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING 6 UNLINED ❑ 95 UNKNOWN E:] 99 OTHER <br /> LING <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL 7 YES_ NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ® 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) none OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) none <br /> IV.PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A IR' 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A {Y, 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A IX, 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL WICOATING A U 8 100% METHANOL COMPATIBLE WIFRP <br /> PROTECTION A U B GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ MONrtORING ❑ OTHER none <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITpRING <br /> 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ® 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MOIDAYIYR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH <br /> SUBSTANCE REMAINING YES [—] NO <br /> GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME gd Torpe agent �r1^t Katzaki_an DATE 9/9/97 <br /> IPRIKfEpb SIGNATGREI <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS CO POSED OF TS FOUR NUMBERS BELOW <br /> COUNTY If JURISDICTION 6 FACILRY 6 TANK 6 OC) <br /> STATE I.D.# m = Wo T771 I 3 - <br /> PERMIT NUMBER PERMIT APPROVED BYIDATE PERMIT EXPIRATION DATE <br /> 2x27 <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> FORMS (1291) FILE THIS FORM WIT#OCAL AGENCY IMPLEMENTING THE UNDERGROUND OGE TANK REGULATIONS <br /> A& <br />
The URL can be used to link to this page
Your browser does not support the video tag.