Laserfiche WebLink
0 <br />D. Results of Testing/Servicing <br />Software Version Installed: <br />1.om ieieTri <br />X Yes <br />No* <br />Is the audible alarm operational? <br />X Yes <br />No* <br />Is the visual alarm operational? <br />X YesNo* <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />X Yes <br />No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br />proper operation? <br />0 Yes <br />❑ No* <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? <br />X NIA <br />X Yes <br />n No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system <br />NIA <br />detects a leak, fails to operate, or is electrically disconnected? if yes: which sensors initiate positive shut -down? (Check all that apply) <br />X SumplTrench Sensors; Dispenser Containment Sensors. Did you confirm positive shut -dawn due to leaks and sensor <br />failure/disconnection? X Yes; i i No. <br />Yes <br />No' <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no mechanical overfill prevention <br />X NIA <br />valve is installed), is the overfill warning alarm visible and audible at the tank fill point(s) and operating properly? If so, at what percent <br />of tank capaGity does the alarm trigger? % <br />X Yes* <br />No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the <br />manufacturer name and model for all replacement arts in Section E, below - <br />Yes" <br />X No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) Product; Water. If <br />es, describe causes in Section E, below. <br />X Yes <br />❑ No* <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />X Yes <br />I F. No' <br />I Is all monitoring equipment operational per manufacturer's specifications? <br />* In Section E below, describe how and when these deficiencies were or wits be correctea. <br />E. Comments: THE VEEDER ROOT 208 SENSOR IN THE 87 STP SUMP DID NOT PASS. IT WAS REPLCED AND RETESTED AT <br />THE TIME OF THE TEST. <br />Monitoring System Certification Page 2 of 4 <br />121017 <br />2 2121107 <br />