My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011- 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
10878
>
2300 - Underground Storage Tank Program
>
PR0231598
>
COMPLIANCE INFO_2011- 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 7:08:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011- 2015
RECORD_ID
PR0231598
PE
2361
FACILITY_ID
FA0001146
FACILITY_NAME
MORADA CHEVRON FAST N EASY #60*
STREET_NUMBER
10878
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08607002
CURRENT_STATUS
01
SITE_LOCATION
10878 N HWY 99 E
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\10878\PR0231598\COMPLIANCE INFO 2011- 2015 .PDF
QuestysFileName
COMPLIANCE INFO 2011- 2015
QuestysRecordDate
5/17/2017 4:55:05 PM
QuestysRecordID
3383937
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />F. In -Tank Gauging f SIR Equipment: Z Check this box if tank gauging Is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section most be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Com lete the following checklist: <br />Z Yes ❑ No' Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />YesF[O-INo* <br />Were all tank gauging probes visually inspected for damage and resrdue buildup? <br />Yes Was accuracy of system product level readings tested? <br />Yes Was accuracy of system water level readings tested? <br />Yes Were all probes reinstalled properly? <br />Yes Were all items nn tt,P on --m <br />' In the Section H, below, describe how and when these deFiciencies were or will be corrected. <br />G. Line Leak Detectors (LLD):Mechanical El Check this box if LLDs are not installed. <br />Com tete the;ooTcneVcK,,s <br />t: <br />® Yes <br />quipment startup or annual equipment certification, was a leak simulated to verity LLD performance? (Check all <br />pply) Simulated leak rate: ® 3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />Yes <br />all LLDs confirmed operational and accurate within regulatory requirements? <br />Yesthe <br />testing apparatus properly calibrated? <br />Yesechanical <br />LLDs, does the LLD restrict product flow if a detects a leak? <br />❑ N/A <br />Yes <br />No' <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />® NIA <br />Yes <br />No" <br />® NIA <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br />disconnected? <br />Yes <br />No' <br />N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br />fails a test? <br />❑ Yes <br />No" <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />® NIA <br />Yes <br />No" <br />Were all items on the equipment manufacturers maintenance checklist completed? <br />" In the Section H, below, describe how and when these deficiencies were or will he cor.P tad <br />H. Comments: <br />Completed Line Leak Detector Test, All Leak Detectors Passed. <br />Completed Spill Bucket Test. Found T1 Super Water Level Dropping. Replaced Fill Cap and Tightened Drain Valve Bolts. <br />Retest and found passed. <br />Completed Fail Safe, Positive Shutdown, and Sensor Out. All Passed <br />Tested all Bravo Float and Chain Assemblies. Tested all Impact valve operation. All Passed <br />Monitoring System Certification Page 3 of 4 12!07 <br />3 <br />2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.