Laserfiche WebLink
SWRCB, January 2002 <br />� RE G"E+VEB <br />Secondary Containment Testing .Report Form MAY 18 2015 <br />MID VALLEY CONSULTING �tvvlRon�iElurarrHEALTH <br />AND GENERAL ENGINEERING <br />1097 BRONCO DRIVE, PLUMAS LAKE CA. 95961 (530) 749-9892 Ca Lie#. 920085 CL%IITISERVICES <br />E-MAIL: midvalle.consultin@sbcglobal.net <br />1. FACILITY INFORMATION <br />Facility Name: FAST AND EASY CHEVRON Date of Testing: 4/30/2015 <br />Facility Address: 1.0878 N, HWY 99 STOCKTON CA, 95212 <br />Facility Contact: MIKE ALI Rhone: <br />Date Local Agency Was Notified of Testing: 4/26/2015 <br />Name of Local Agency Inspector (ifpresent during testing): <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: Mid Valley Consulting <br />Pass <br />Technician Conducting Test: JAMES DAY <br />Not Repairs Component <br />Tested Made <br />Credentials: CSLB Licensed Contractor <br />Fail <br />License Type: CLASS A <br />License Number: 920985 <br />Manufacturer <br />Manufacturer Training <br />Component(s) Date Training Expires <br />INCON <br />TS -STS 11/01/2015 <br />X <br />❑ <br />❑ <br />❑ <br />9 1 /DIESEL ANNULAR <br />X <br />3. SUMMARY OF TEST RESULTS <br />Component <br />Pass <br />Fail <br />Not Repairs Component <br />Tested Made <br />Pass <br />Fail <br />Not <br />Tested <br />Repairs <br />Made <br />87 ANNULAR <br />X <br />❑ <br />❑ ❑ DISP 5-6 <br />X <br />❑ <br />❑ <br />❑ <br />9 1 /DIESEL ANNULAR <br />X <br />❑ <br />❑ ❑ DISP 7-8 <br />X <br />❑ <br />❑ <br />❑ <br />87 PIPE SECONDARY <br />X <br />❑ <br />❑ ❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />91 T2 PIPE SECONDARY <br />X <br />❑ <br />❑ ❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />91 T1 PIPE SECONDARY <br />X <br />❑ <br />❑ ❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />DIESEL PIPE SECONDARY <br />X <br />❑ <br />❑ ❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />87 STP SUMP <br />X <br />❑ <br />❑ ❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />91 T1 STP SUMP <br />X <br />❑ <br />❑ ❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />91 T2 STP SUMP <br />X <br />❑ <br />❑ ❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />DIESEL STP SUMP <br />X <br />❑ <br />❑ ❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />DISP 1-2 <br />X <br />❑❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />DISP 3-4 <br />X <br />❑ <br />❑ ❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />If hydrostatic testing was performed, describe what was done with the water after completion of tests: <br />Water will be removed from all tested containment sumps and filtered through <br />a charcoal activated filtration system and returned to our on board storage <br />Tank. <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />To the best of my knowledge, the fiacts stated in this document are accurate and in full compliance with legal requirements <br />Technician's Signature: f Date : 4/30/2015 <br />