My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_2006 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
24323
>
2300 - Underground Storage Tank Program
>
PR0231947
>
BILLING_2006 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:42 PM
Creation date
11/5/2018 7:56:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2006 - 2010
RECORD_ID
PR0231947
PE
2361
FACILITY_ID
FA0004345
FACILITY_NAME
JAHANT FOOD N FUEL STOP
STREET_NUMBER
24323
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00516019
CURRENT_STATUS
01
SITE_LOCATION
24323 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\24323\PR0231947\BILLING 2006 - 2010 .PDF
QuestysFileName
BILLING 2006 - 2010
QuestysRecordDate
2/9/2017 9:54:45 PM
QuestysRecordID
3335126
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
07/22/2008 17:23 9163712450 BZ MANITANENCE PAGE 02/10 <br /> SAN JoAlipff COUNTV A& <br /> XNVTR()NMENTA'L HFALTOMMARTNMYT <br /> UNDERCROUND STORAGE TANK <br /> MONITORING PLAN- PAGE I <br /> FTYPE OF ACT17ON �d L NEW PLAN ❑ 2.-C-HANGF OF TNFORMAT70N -Mommu-NMEM� <br /> PLAN TYPE ❑ moitirruirm is IDENTICAL FOR ALL USTA AT 71118 FACIlXrY.. M02. <br /> (Ch"kOff4l ite",only) 9 THIS PLAN COVERS ONLY THE POLLOwivous'l-gysirm! <br /> EACIrdTY ........... AN. F.-HiMA-11:1111 011: <br /> 1y) <br /> y U"On <br /> FACILI'ty NAME <br /> FACILITY SITE ADORE-SS <br /> M114. CITY <br /> MOS. <br /> RMEN <br /> Q AMi1IlV FEN:' <br /> Stye low rcqkllfO that Wilng,Imavenuve MILMICII."ce.Alld calAnt ...... <br /> of mmiorms equipment(c.&.gen,,,, mam$!Cie.)be <br /> .,probZ il-"-leak d - -- ;;'�k ;d i�' n, <br /> accordance with the equipment manufacturers'insun.ction., evers more equant Such ed by qualified personnel.IS SERVICED l.ANNUALLY ❑ 99.OTHER(Specify); Will, <br /> MONJITORINOEQUIPME,NT performed <br /> This Monitoring Plain must inelladc a Site Plan showing the gcna.... jcy,mc,and Inc locations whicitc Insroutomi;is Performed(i.e..location of cacb,Union <br /> line leak detuc(or,monitoring system MIAMI panel,etc.), Iryou already haniin a diaMm(c.&2 cumett UST Monitoring Site plan frml.,Monitoring System Cc irlecti <br /> fonan.ilu'ardous i�ztcrifds Business,plat".eq.)4jghnn. with ori Y,can It 011 <br /> Otis m. <br /> MONITO]UNOtSPERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) <br /> 1.CONTINUOUS FLFCTTtONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)3FACE(S)OR SECONDAPY CONTAINMENT VAULT(S) 1410. <br /> SECONDARY CONTAINMENT IS: n.DRY ❑ b.T,jqLjtD FILLED 11 9-UNDER PRESSURE ❑ d.UNDER VACUUM <br /> PANEL MANUFACTURER: 113 ,OLL at" <br /> MODE).#: :1!�a my MIX <br /> LEAKRENSOR MAN JFACTURr1R: MODFLO(l); Ej S <br /> ❑ 2.AU'110MATICTANK GAUGING(ATO)SYSTEM USED To MONITOR SEQLX_WAIL iii <br /> PANEL MANUFACTURER: WI'. MODELS: M17. <br /> IN-TANK PROBE MANUFACTURER: - M" MODEL#(S): MM <br /> LEAK TEST'FREQUENCY: 0 a-CONTINUOUS ❑ b-DA-UWNIGITTLYIj c.WEEKLY M20. <br /> [] 0.MONTHLY ❑ e.OTHER(Specify): <br /> PROGRAMMED TESTS: [] &0.1 S.P.11. 0 b.0.2S.p,h. [I c.OTHER(Specify): Mzz. MZ). <br /> Ll A. INVENTORY RrCONCIIIATION 0 a.MANUAL PER 23 CCR§2646 D b,STATISTICAL PFR.ZI OCR§2646.1 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCRM45 <br /> TESTING PERIOD: [] &36 HOURS ❑ It,60 HOURS <br /> ❑ s.TwEeRITYTIESITNO PER 23 CCR,§7643.1 <br /> TEST FREQUENCY: 0 x ANNUALLY L] b.BIEWALLY C1 c.OTHER(FIrcicify): M76, M27. <br /> 6.V1SUAT.,moNrwPJNGDONflr-- DAILY El b.WEEKLY <br /> ❑ 99.OTHER(Spccify): <br /> ... ......................... <br /> ............. <br /> Gi ::,:, .... ---. ............ <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all dust apply) <br /> 1A 1 CON rINUOUS ELECTRONIC MONITORINO OF PIPING SUMP(W-RENCHMS)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: 0 d.DRY ❑ h.LIQUID FILLED 0 0,UNDER PRESSURE 0 At.UNDER VACUUM M31 <br /> PANEL MANUPACnMER: -lviltpa W-:' MODEL#: -�MiDDC) 1433. <br /> LEAK SENSOR MANIJFACTIIPER: --t 1434 MODEL#(S): -1A_Ua:� M35. <br /> WILL A PIPTNO LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,111R13INT)SHUTDOWN' X&YES rib.NO M-16. <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? 91.1.YES Ll It.NO W"' <br /> 2. MECHANICAT, LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.fL LEAK TESTS AND RnTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED <br /> MLLD MANUFACTUREII vav&1vM Mia. MODFUft(s): -99J-T>Aa0-a- Wa"• <br /> ❑ 3. FI-FCTPONIC LINE LEAK DETECTOR(EL11D)THATROUTINELY PERFORMS 3.0 gp.h.LEAK TESTS <br /> rLLD MANUFACTURER: 040- MODEI-4: MAI. <br /> PROGRAMMED LINE TNTEORlTYTESTS: [] ,,l. M1NTMUMMONTHLY 0.2gv.h. 13 b.MINIMUM ANNUAL 0.1 g,p,h. M42. <br /> WILL MAA)DETECTION OF A PIPING,TEAK TRTOQFR AUTOMATIC PUMP SHUTDOWN? 11 a.YES 0 b.NO 0113. <br /> WILL FLLD FAILUREIDISCONNECTION TRIGGER AUTOMATIC PUMP SHU111OWN7 ❑ a.YES 0 b.NO <br /> ❑ 4.INTEGRITY TESTING <br /> jgTEST FREQUENCY: [j a.ANNUALLY L] b.EVERY 3 YEARS ❑ c.OTHER(Specify) M4,% WAS. <br /> J.VISUAL MONITOM0 DONE: JW &DAILY C3 b.WEEKLY' 0 C-MN MON114I.-Y M.EACH TIME SYSTEM OPERATRO41 M41 <br /> Racal-"Away sslavii,d <br /> El 6.PIPINOIS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§26.16(;t)(3) <br /> El T NO PRODUCT OR REMOTT.FII J,PIPING IS CONNECTED TO THE UST(-) <br /> Lj 99.OTI-IFR(Spocify) WAR <br /> S.rCPHD-d(07103)-1/4 07123103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.