Laserfiche WebLink
i <br /> UNII,E D PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANKS -TANK PAGE 2 TANKS <br /> VI.PIPING CONSTRUCTION ch<eka0 the I page_of_ <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SYSTEM TYPE 1.PRESSURE D 2.SUCTION D 3.GRAVITY 458 ❑1.PRESSURE ❑2. SUCTION <br /> CONSTRllCT10N D 1.SINGLE WALL D 3.LINED TRENCH ❑3.GRAVITY 459 <br /> ❑99.OTHER 460 ❑I.SINGLE WALL ❑95.UNKNOWN 462 <br /> MANUFACTURER Q�2.DOUBLE WALL ❑95.UNKNOWN ❑2.DOUBLE WALL <br /> MANUFACTURER ❑99.OTHER <br /> 461 MANUFACTURER 463 <br /> ❑1.BARB STEEL 6.FRP COMPATIBLE w/100% N4ETEIANOL ❑1.HARE STEEL <br /> ❑2.STAINLESS STEEL ❑7.GALVANIZED STEEL ❑6.FRP COMPATIBLE W/l00%I,mTF1ANOL <br /> ❑Unknown ❑2. BE <br /> STEEL ❑7.GALVANIZED STEEL <br /> ❑3.PLASTIC COMPATIBLE W/CONTENTS D 99. Other D 3. PLASTIC COMPATIBLE W/CONTENTS 118-FLEX®LE FLEXIBLE(HDPE) ❑99. OTHER <br /> D 4.FIBERGLASS D 8.FLEXIBLE(HDPE) ❑4, FIBERGLASS <br /> D 5.STEEL W/COATING 119.CATHODIC PROTECTION 464 119.CATHODIC PROTECTION <br /> ❑5. STEEL W/COATING ❑95.UNKNOWN 465 <br /> VII.PIPING LEAK DE IECF ON Check all that 1 Adeaai donathe im.hom"romo shell be submitted to the bml me. <br /> UNDERGROUND PIPING PIP]NG <br /> SINGLE WALL PIPING ABOVEGROUND <br /> 466 SINGLE WALL PIPING 467 <br /> PRESSURIZED PIPING(Checka0 thatapply): �rrrmr�Mya PRESSURIZED PIPING(Chmkall that applyk <br /> ❑I.ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST y. AUTO POMP SH UT ❑1. ELECCR0 CLINE LEAKD6IECTOR3.0 GPHTESC}yI¢T AUTOPUMP <br /> OFF FOR LEAK,SYSTEM FAILURE,ANp SYSTEM DISCONNECTION+ SHUT OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION+ <br /> AUDIBLE AND VISUAL ALARMS, AUDIBLE AND VISUAL ALARMS. <br /> ❑2.MONTHLY 02 GPH TEST D 2.MONTHLY 02 OPH TEST <br /> D 3.ANNUAL INTEGRITY TEST(O.1GPH) D 3.ANNUAL INTEGRITY TEST(O.IGPH) <br /> ❑4. DAILY VISUAL CHECK <br /> CONVENTIONAL SUCTION SYSTEMS CONVENTIONAL SUCTION SYSTEMS(Ch.&all dot apply) <br /> [15.DAII,Y VISUAL MONITORING OF PUMPING SYSTEM+TRIENNIAL PIPING <br /> INTEGRITY TEST(0.1 GPH) D 5.DAILY VISUAL MONITORING OF PIPING AND PUMPING SYSTEM <br /> SAFE SUCTION SYSTEMS(NO VALUES IN BELOW GROUNDPIPING): D 6.TRIENNIAL INTEGRITY TEST(0.1 GPH) <br /> D 7.SELF MONITORING SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): <br /> GRAVITY FLOW <br /> 07. SELF MONITORING <br /> D 9.BIENNIAL INTEGRITY TEST(0.1 GpH) GRAVITY FLOW(Cl kali that apply): <br /> [18. DAILY VISUAL MONITORING <br /> D 9.BIENNIAL INTEGRITY TEST(0.1 GPH) <br /> SECONDARILY CONTAINED PIPING SECONDARILY CONTAINED PIPING <br /> PRESSURIZED PIPING(Check all tatapplyY PRESSURIZED PIPING(Quick all tlutapply): <br /> 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL <br /> ALARMS AND(Check ova) ALARMS AND(Checkam) <br /> I a. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS D a AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br /> ❑b. AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM D b AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM <br /> DISCONNECTION DISCONNECTIONDc.NO AUTO PUMP SHUT OFF De NO AUTO PUMP SHUT OFF <br /> 1XII. AUTOMATICLINE LEAK DETECTOR(3.0 OPH TEST)MM FLOW SHUT <br /> OFF OR RESTRICTION ❑11. AUTOMATICLEAKDETECTOR <br /> QQ <br /> 12. ANNUAL INTEGRrrY TEST(0.1 GPH) D 12. ANNUAL INTEGRITY TEST(O.1 GPH) <br /> SUCTION/GRAVITY SYSTEM SUCTION/GRAVITY SYSTEM <br /> D 13.CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS D 13. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS <br /> EMERGENCY GENERATORS ONLY(Check all that apply) EMERGENCY GENERATORS ONLY(Check all that apply) <br /> [114. CONTINUOUS SUMP SENSOR wrlTlouT AUTO PUMP SHUT OFF• <br /> AUDIBLE AND VISUAL ALARMS D 14. CONTINUOUS SUMP SENSORT AUTO PUMP SHUT OFF❑ AUDIBLE AND VISUAL ALARMS <br /> I5. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WTTHOIIT PLOW <br /> SHUT OFF OR RESTRICTION D 15. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST) <br /> D 16.ANNUAL INTEGRITY TEST(0.1 GPH) [116.ANNUAL INTEGRITY TEST(0.1 GPH) <br /> D 17.DAILY VISUAL CHECK D 17. DAILY VISUAL CHECK <br /> VIII.DISPENSER CONTAINMENT <br /> DISPENSERCONTANMENT ;$1,FLOAT MECHANISM THAT SHUTS OFF SHEAR VALVE ❑4.DAILY VISUAL CHECK <br /> DATE INSTALLED 468 D 2.CONTINUOUS DISPENSER PAN SENSOR+AUDIBLE AND VISUAL ALARMS D 5.TRENCH LINER/MONITORING <br /> D 3.CONTINUOUS DISPENSER PAN SENSOR WCTH AUTO SHUT OFF FOR <br /> D6PENSER+AUDIBLE AND VISUAL ALARMS D 6.NONE 469 <br /> IX.OWNER/OPERATOR SIGNATURE <br /> I unify Nat the infor atio vided herein is hue and actuate to the be,ofmy knowledge. <br /> SIGNAT BRAIDS <br /> DATE <br /> l L/Z(, A f 47: <br /> NAMEO R(OPRA,��QpR(prmt) 471 TITLE OF OWN PHRATOR <br /> 472 <br /> Perak Number(For local we only) 473 P;7t Appmvcd(F.,local use aN <br /> Y) 474 Permit Eaphimn Dak(For last use only) 475 <br /> UPCF(12/99 revised) 12 Formerly SWRCB Form 13 <br />