<br /> PETROLEUM PRODUCT GENERAL CONDITONS . o
<br /> N
<br /> w
<br /> W
<br /> t$'R OR COP W.R.RI, , -R$FR$SPN'IEIY BX' ITE pRGJ$CT ENOYN$$R. WHO , G SPECIFICATION
<br /> GENERAL CONDITIONS GALVANIZED PIPE AND BITTIN W
<br /> IT OR ZED TO ACT 601f IT WITH RESPECT � THIS ENTIRE PROJECT. � � ., ' I '
<br /> ' PIPE ALL PIPING SHALL HE MINIMUM SCHEDULE 40 WELDED OR PETROLEUM PRODUCTS FOR TESTING EQUIPMENT C
<br /> GENERAL CONTRACTOR IS TER INDIVIDUAL OR FIRM WITH WHOM THE OWNER HAS THE CONTRACTOR SHALL FURNISH ALL MATERIAL AND LABOR TO INSTALL ALL p
<br /> PETROLEUM PIPING, TANK PIPING,, VENT TANK EQUIPMENT, AND ' SEAMLESS STEEL PIPE PER ASTM A 53 SPECIFICATION. j
<br /> CONTRACTED FOR TISFACTORY COMPLETION OF THE ENTIRE PROJECT. THE 24 HOURS BEFORE CONTRACTOR REQUIRED DELIVERY OF PETROLEUM PRODUCTS
<br /> CONNECTIONS TO PETROLEUM DISBENSERS AS DESCRI88D IN THE FOLLOWING I GALVANIZED PIPE SHALL BE HOT-DIPPED, ZINC-COATED IN y
<br /> GENERAL CONTRACTOR IS RESPONSIBLE FOR SCHEDULING. AND COORDINATING ALL DRAWINGS. i ACCORDANCE WITH SPECIFICATION ASTM A 120. FOR TESTING EQUIPMENT OR FOR BALLASTING TANKS, 'H8 SHALL REQUEST TO m
<br /> WORK INVOLVED IN,. THE PROJECT, HE IS RESPONSIBLE FOR APPROV;NG OR j OWNER S REPRESENTATIVE TO ARRANGE FOR IT. IMMEDIATELY ASTER
<br /> REJECTING ALL MATERIALS AND WORKMANSHIP FURNISHED FOR ALL PARTS OF GENERAL ARRANGEMENT FOR THIS LOCATION FITTINGS ALL SCREWED FITTINGS SHALL HE GALVANIZED 300LB. DELIVERY, THE CONTRACTOR AND OWNER'S REPRESENTATIVE SHALL TOGETHER
<br /> THIS PROJECT, INCLUDING THOSE WHICH ARE ORDERED OR SUBCONTRACTED BY MECHANICAL DRAWING FOR THIS LOCATION MALLEABLE IRON PER SPECIFICATION ASTM A 197 AND ACCURATELY GAUGE THE PETROLEUM PRODUCT WITH A GUAGE STICK AND MAH-A
<br /> HSM AND THOSE WHICH MAY 8E ORDERED OR CONTRACTED DIRECTLY BY THE RECORD ON THE GASOLINE "PURCHASE AND SALE ROUTE SHEET". FO Z
<br /> PETROLEUM PIPING AND SPECIFICATION DRAWINGS DIMENSIONAL STANDARD ASA H 16-20. RM
<br /> OWNER. - � 43-6N52. UPON COMPLETION AND ACCEPTANCE OF CONSTRUCTION WORK BY THE
<br /> ALL OF WHICH ARE TO BE CONSIDERED AS PART THEROF WORK OR MAT$IRAL CONTRACTOR SHALL TIGHTLY WRAP ALL UNDERGROUND GALVANIZED PRODUCT OWNER'S REPRESENTATIVE. THE CONTRACTOR SHALL REPEAT THE AFORE z
<br /> CONTRACT_O� AS USED HEA$;N, REFERS TO THE INDIVIDUAL OR FIRM WHO DESCRIBED GAUGING PROCEDURE AND RECORD FOR COMPARISON WITH THE FIRST
<br /> UNDP— RST -E5 THE PERFORMANCE AND SATISFACTORY COMPLETION OF THE WORK W�{ICH 25 NOT SPECIFIED BUT WITHOUT WHICH A SATISFACTORY JOB CANNOT '. PIPING. INCLUDING EXPOSED THREADS, UNIONS, AND FLEXCONNECTIONS AND/OR GAUGES. vi Y Y x
<br /> SPECIFIED HEREIN AND WHICH SHALL BE SCHEDULED, PERFORMED, AND REASONABLY BE COMPLETED. SHALL BE CONSIDERED PART OF THE SWING JOINTS ON DISPENSERS, TURBIND PUMPS, RISERS, AND VENT LINES.
<br /> C NTRACTOR'S WORK. N Z LL
<br /> COMPLETED A9 DIRECTED BY THE GENERAL CONTRACTOR. APPLY TWO (2) LAYERS OF 1-INCH WIDE CORROSION PROTECTION TAPE TESTING GASOLINE PIPS SYSTEMS ••
<br /> SCO E TAB OWNER SHALL FURNISH UNDERGROUND TANKS, LEAK MONITORS AND - (POLYKEN 940 OR SCOTCHWRAP 50) . EACH LAYER SHALL BE SPRIAL WRAPPED OWNER'S REPRESENTATIVE SHALL BE NOTIFIED 24 HOURS IN ADVANCE OF TESTSz es MAE UNDERGROUND TANK CONTAINMENT ASSEBMLIES HEREIN. WITH A 1/2 - INCH OVERLAP. AT CONNECTIONS BETWEEN GALVANIZED AND .• Z .. W W =
<br /> FIBERGLASS PIPE. TAPE SHALL EXTEND 2-INCHES ONTO FIBERGLASS PIPE. PIPE SHALL BE AIR TESTED BEFORE, DURING AND AFTER BACKFILLING. A '• W u 2 W
<br /> THIS CONTRACTOR SHALL .FURNISH, AT HIS. OWN COST AND EXPENSE, ALL PACKAGE B1 FOR EACH DW FIBERGLASS 0 C-TANK. TAPS SHALL BE CARRIED UP TO THE BASE OF THE IMPACT VALVE AT DISPENSES SOAP SOLUTION SHALL - BE APPLIED TO ALL FITTINGS DURING TEST BEFORE F Q N ¢ W O O
<br /> LABOR, MATERIAL: SQUIPMENT, AND TRAN$PORATTON REQUIRED TO COMPLETE / — AND UP TO THE 2-INCH GALVANIZED COUPLING AT VENT LINES. THREADS BACKFILLING, CONTRACTOR SHALL COMPLETE TESTS AT THE TIME DESIGNATED, ¢ u W K 2 K
<br /> UPON THE SITE, THE FOLLOWYNO, CONTRACTOR SEE EQUIPMENT SCHEDULE. SHALL BE 'CLEAN, FULL LENGTH, COATED WITH PETROLEUM RESISTANT THREAD EACH PIPE SYSTEM, PRODUCT PIPING, VAPOR RETURN PIPING AND VENT O v! [] a d
<br /> LUBRICANT (PERMATEX 82 OR EQUAL), THEN TIGHTEN TO REFUSAL. PIPING, SHALL BE PRESSURED TO 78 P.S.I. AND MAINTAINED AT THAT
<br /> ' THE GENERAL ARRANGEMENT DRAWING SHOWS THE ENTIRE SCOPE OF THIS
<br /> PRZSSUP.E FOR 15 MINUTES BEFORE BACKFILLING, DURING BACKFILLING, AND
<br /> THEHOTS: STEEL PIPE AND FITTINGS WILL BE USED ONLY WHERE REMAIN PRESSURIZED UNTIL ALL CONSTRUCTION IS COMPLETE. IF NO 0
<br /> OR EQUIPMENT WORK. IN ERA EVENT OF VARIANCES BETWEEN IT AND ANY SPECIFICALLY CALLED FOR PERCEPTIBLE CHANGE IN PRESSURE HAS OCCURRED AT THE END OF THE TEST a
<br /> OTHER DRAWINGS, AS TO LOCATION Of BVILDINBGS, STRUCTURES, FACILTISS
<br /> OR EQUIPMENT SHOWN, THS GENERAL ARRANGEMENT DRAWING SHALL GOVERN. ALL OTHER PETROLEUM PIPING AND FITTINGS SHALL BE PERIOD. THE SYSTEM SHALL BE CONSIDERED INITIALLY ACCEPTABLE.
<br /> THE CONTRACTOR SHALL INSPECT THE SITEDRAWINGSAND SPECIFICATIONS AMERON OR RED THREAD IT WITH UNDERWRITERS LABEL. PERCEPTIBLE WATER IN TANKS AND CONTAINMENT AREAS SHALL BE REMOVED BY : �
<br /> THE CONTRACTOR SHA , ,LL ALSO SUPPLY AND INSTALL CERTAIN APPURTENANCES THE CONTRACTOR. m
<br /> _
<br /> PRIOR TO SUBMITTING HIS BID. SHOULD THE CONTRACTOR FIND
<br /> DESCRIBED HZRBIN. THE FABRICATION AND CONSTRUCTION SHALL BE DISCREPANCIES OR QUESTION THE CONTRACT REQUIREMENTS, HE SHALL ASK THE FIBERGLASS REINFORCED EPDXY PIPING SYSTEM F e
<br /> PERFORMED IN STRICT CONFORMANCE TO THE FOLLOWING DRAWINGS WHICH ARE PROJECT ENGINEER FOR CLARIFICATION. THE CONTRACTOR SHALL COORDINATE IF DOUBLE WALL PIPE IS USED THE SECONDARY PIPE IS TO BE PRESSUR G
<br /> ATTACHED HERETO AND A.RE A PART HEREOF: THIS WORK WITH OTHERS TO AVOID ANY POSSIBLE DELAYS. MATERIALS TESTED AT 5 B.S.I. FOR 15 MINUTES, BEFORE BACKFILLING AND 15 MINUTE +
<br /> AFTER BACKFILLING. Z H 6
<br /> INSURANCE EXTRA WORK AND CONTRACT SUPPLEMENTS ALL PIPING AND FITTINGS SHALL BE AMERAON OR A. 0. SMITH (RED THREAD 0 $ W
<br /> II) PIPE WITH UNDERWRITERS LABLE. RED THREAD PIPING AND FITTINGS ARE GASOLINE DISPENSERS U dad
<br /> CONTRACTOR SHALL PURCHASE AND MAINTAIN IN FULL FORCE AND EFFECT THE CHANGES AND EXTRAS SHALL BE AUTHORIZED IN WRITING, ORAL AGREEMENTS NOT INTERCHANGEABLE WITH AMERON. DO NOT MIX MANUFACTURERS. G m i
<br /> FOLLOWING POLICIES OF INSURANCE, WHICH WILL BE RIMARY AS TO ANY WILL NOT BE RECOGNIZED 8Y OWNERAS SPECIFIED ON GENERAL ARRANGEMENT DRAWING, CONTRACTOR SHALL
<br /> .
<br /> OTHER EXISTING VALID AND COLLECTIBG$ INSURANC8. IT IS SUGGESTED THE CONTRACTOR BE FAMILIAR WITH THE CURRENT CIBA AND SECURELY LEVEL AND ANCHOR EACH DISPENSER TO CONCRETE ISLAND. CORE 0 0
<br /> INSPECTION OF WORK RED THREAD II; INSTALLATION MANUALS, AND OTHER MANUFACTURERS' HOLES SHALL BE FILLED WITH CLEAN SAND TO 2 INCHES BELOW THE IMPACT a ,j
<br /> ( ,CONTRACTOR AGREES TO ADVISE ALL ITS EMPLOYEES AND THE EMPIyQYE$,4 OF BULLETINS AND LITERATURE PERTAINING TO FIBERGLASS REINFORCED PIPE. VALVE ACTUATOR LEVER AFTER DISPENSERS ARE INSTALLEDD. PADLOCK ALL
<br /> ITS SUBCONTRACTORS AND AGENTS THATI' (1) IT IS THE—P_.OLC;T OF , DISPENSER NOZZLES AND ALLOW DISPENSER SHIPPING CARTON OR CRATING TO ''
<br /> L OWNERS REPRESENTATIVE WILL INSPECT ALL MATERIAL AND WORKMANSHIB o _ 4
<br /> THAT THE USB, POSSESSION, SALE, TRANSFER OR PURCHASE OF IL EOAL DRUGS FURNISHED UNDER THE CONTRACT. IF, IN HIS OPINION, ANY PART IS CONTRACTOR SHALL STRICTLY ADHERE TO MANUFACTURERS' RECOMMENDED REMAIN OVER DISPENSERS FOR PROTECTION AFTER INSTALLTION. g 3
<br /> ON IS PROHIBITED0 (2) ENTRY ONTO PROPERTY CONSISTUTES UNSATISFACTORY, THE CONTRACTOR SHALL REPLACE, OR CORRECT IT ANY PROCEDURES FOR INSTALLTION. F- F
<br /> CONSENT TO AN INSPECTION OF TNS EMPLOYEE AND HIS OR HER PERSONAL CONTRACTOR'S EXPENSEDISPENSER TESTS
<br /> . 'u
<br /> EPFECTS WHEN ENTERING, (3) ANY EMPLOYEE WHO 5 INSTALLATION PROCEDURE y.
<br /> FOUND IN VIOLATION OF TH$ POLICY OR WHO REBUSES TO PREMITN CLEAN-UP DISPENSER METERS SHALL BE ADJUSTED AS NEAR AS POSSIBLE TO ZERO yg
<br /> kINSPECTION MAY BE REMOVED AND' BARAED, _ �•. _ -• REFER TO CIBA AND RED THREAD II INSTALLATION SPECIFICATIONS. NO ERROR. ADVISE REPRESENTATIVE OF ANY METER THAT CANNOT BE HELD U 3 U
<br /> dONTRACTOR AGREES TO. PROTECT, INDEMNIFY AND HOLD COMPANY AND ITS CONTRACTOR SHALL REMOVE FROM CONSTRUCTION SITE AND ADJACENT DEVIATION FROM THESE SPECIFICATIONS IS ALLOWED WITHOUT APPROVAL OF TO BLUE-OR-MINUS 3 1/2 CUBIC INCHES OF TOLERANCE IN A 5- GALLON
<br /> MEASURE FOR REPAIR UNDER MANUFACTURER'S WARRANTY, TESTS WILL BE MADE
<br /> EMPLOYEES, AGENTS AND OFFICERS FREE AND HARMLESS FROM AND AGAINST PROPSRTIES EXCESS AND WASTE MATERIAL FROM THIS WORK. FILL BOXES AND PROJECT ENGINEER. 0 D
<br /> CONTAINMENT SUMPS SHALL BE CLEAN AND FEE OF EARTH. ACCORDING TO METHODS PRESCRIBED BY DEPARTMENT OR WEIGHTS AND U
<br /> ANY AND ALL CLAIMS, DEMANDS, AND CAUSES 08 ACTION OF ALL KINDS
<br /> jNCLUDING WITHOUT LIMITATION, CLAIMS OF PROPERTY DAMAGE, INJURY OR CAUTION: MEASURESCOSST OF PUMP OPERATING LICENSE SHALL BE PAID BY OTHERS.
<br /> BY REFERRING TO GENERAL ARRANGEMENT DRAWING, CONTRACTOR . ,I r
<br /> �
<br /> j DERARISING OUT OF OR BEING IN ANY WAY CONNECTED WITH CONTRACTOR'S GUARANTEE OF MATERIAL AND WORKMANSHIP SHALL PERMITIT NO STAKES TO BE DRIVEN IN THE VICINITY of ANY
<br /> PERFORMANCE
<br /> FIBERGLASS UNDERGROUND PIPING INSTALLATION.
<br /> FORMANCE UNDER THIS AGREEMENT, EXCEPT FOR MATTERS SHOWN BY FINAL � � �
<br /> JUDGEMENT TO HAVE BEEN CAUSED BY THE SOLE NEGLIGENCE FO COMPANY. THE IF, WITHIN ONE YEAR AFTER THE DATE OF COMPLETION AND OF THIS WORK,
<br /> INSURANCE REQUIREMENTS OF THE . FOLLOWING PARAGRAPH SHALL NOT BE ANY OF THE MATERIAL OR WORKMANSHIP FURNISHED BY THE CONTRACTOR SHALL HANDLING AND STORAGE
<br /> CONSTRUED TO LIMIT THE INDEMNIFICATION PROVIDED HEREUNDER, THE PROVE DEFECTIVE, CONTRACTOR WILL, UPON RECEIPT OF OWNER'S WRITTEN
<br /> INDEMNIFICATION PROVIDED HEREIN SHALL BE EFFECTIVE TH THE MAXIMUM REQUEST, REPLACE OR REPAIR IT AT CONTRACTOR'S EXPENSE. PIPE IS PACKAGED IN BUNDLES OF SIX OR EIGHT 30-FOOT LENGTHS. CIBA
<br /> EXTENT PERMITTED BY APPLICABLE LAW. CONTRACTOR SHALL BE SOLELY PIPE IS PACKAGED IN BUNDLES OF FIVE 20PPOOT LENGTHS. BOTH ARE EASILY
<br /> RESPONSIBLE FOR THE DEFSSE OF ANY AND ALL CLAIMS, D8AMNDS OR SUITS PERMITS CUT USING AN ORDINARY HACKSAW WITH FINE-TOOTH BLADE THE CUT SHOULD BE
<br /> AGAINST COMPANY, ITS EMPLOYEES, AGENTS AND OFFICERS, INCLUDING SQURS.
<br /> WITHOUT LIMITIATION, CLAIMS BY ANY EMPLOYEE OF ANY CONTRACTOR OR ANY BUILDING PERMIT WILL BE OBTAINED AND PAID FOR BY OTHERS, ALL OTHER cc -
<br /> EMPLOYEE OR ANY SUBCONTRACTOR, EVEN THOUGH THE CLAIMANT MAY ALLEGE PERMITS NECESSARY TO COMPLETE THIS WORK SHALL BE OBTAINED BY THE BUNDLES OF FIBERGLASS PIPE CAN BE SAFELY STORED ON LEVEL GROUND OR ON G
<br /> I WILLFUL MISCONDUCT OR SOLE NEGLIGENCE ON THE PART OF COMPANY. CONTRACTOR. RACKS WITH 10-FOOT (OR LESS) SUPPORT SPACING. REASONABLE CARE SHOULD • W
<br /> BE USED IN HANDLING FIBERGLASS PIPE. IT SHOULD NOT BE DROPPED OR F
<br /> WITH RESPECT TO OPERATIONS -PERFORMED UNDER OR INCIDENT TO THIS ALL WORK SHALL BE PERFORMED ACCORDING TO THE REQUIREMENTS OF THE THROWN ON THE GROUND, OR SHOULD STONES OR OTHER HEAVY OBJECTS BE
<br /> AGREEMENT, CONTRACTOR FURTHER AGREES TO OBTAIN AND MAINTAIN INSURANCE CITY, COUNTY, AND STATE HAVING JURISDICTION OVER THE CONSTRUCTION. DROPPED ON IT. V
<br /> ACCEPTABLE TO COMPANY WHICH . IS PRIMARY AS TO ANY OTHER EXISTING,
<br /> VALID AND COLLECTIBLE INSURANCE AND EXCEPT FOR WORKERS' COMPENSATION, TAPERING PIPE }
<br /> EMPLOYERS' LIABILITY, AND CONTRACTURAL LIABILITY INSURANCE NAMES GENERAL PIPING SPECIFICATIONS N�, N �Z Z
<br /> COMPANY AS AN ADDITIONAL INSURED WITH A CROSS LIABILITY CLAUSE WHEN FIBERGLASS PIPE IS CUT TO LENGTH ON THE JOB SITE THE CUT END
<br /> (SEVERABILITY OF INTEREST). SUCH INSURANCE SHALL INCLUDE: MATERIAL MUST BE RETAPERED. THE PATENTED FIELD TAPERING TOOL IS USED FOR THIS no O 0
<br /> (A)
<br /> PURPOSE. ADAPTABLE TO TOW, THREE, AND YOUR INCH PIPE. THE TOOL Z COMPREHENSIVE GENERAL AND PROFESSIONAL LIABILITY INSURANCE ,CONTRACTOR SHALL NOT DEVIATE FROM MATERIALS OR PRODUCTS SPECIFIED QUICKLY REAPPLIES THE PROPER TAPER BYA SHAVING OPERATION SIMILAR TO 0 V
<br /> COVERING SUBCONTRACTOR'S .CONTAINMENT LIABILITY, COMPLETED UNLESS - THROUGH MUTUAL AGREEMENT WITH OWNER'S REPRESENTATIVE. THAT OF A PENCIL SHARPENER. A STRAP WRENCH CAN BE USED WITH THE TOOL J O— V
<br /> OPERATIONS AND PRODUCT LIABILITY, CONTRACTUAL LIABILITY, SUBSTITUTE MATERIALS SHALL BE DESCRIBED, SPECIFIYING ANY DIFFERENCE FOR HOLDING THE PIPE .WHILE TAPERING. A VISE MAY ALSO BE USED FOR
<br /> AND IF REQUESTED BY COMPANY, LIABILITY ARISING FROM - IN COST'. ONOLY NEW MATERIALS SHALL BE USED. HOLDING. .THE PIPE SHOULD BE FIRST WRAPPED WITH A PROTECTIVE MATERIAL W 0 0 O
<br /> EXPLOSION,. COLLAPSE OR UNDERGROUND PROPERTY DAMAGE, ALL TO . AVOILD GOUGING FOR PROPER TAPERING, CAREFULLY FOLLOW THE OPERATING = Q.Z �•••
<br /> WITH A MINIMUM COMBINED SINGLE LIMIT OF $1,.000,000 EACH TANK PILL ASSEMBLY INSTRUCTIONS INCLUDED IN THE KIT.
<br /> OCCURANCE (OR THE EQUIVALENT) BODILY INJURY AND PROPERTY
<br /> DAMAGE AND THE CONTRACTOR SHALL ATTACH TO THE TAG LUG IN EACH TANK FILL BOX A POWER PIPE-THREADING MACHINES MAY BE USED IN THE TAPERING OPERATION U. O N0 ��
<br /> METAL COMMODITY TAG (BRAND NYAMS OF PETROLEUM PRODUCT CONTAINED) AND A' FOR FIBERGLASS PIPE. FOLLOWING IS A GENERAL PROCEDURE FOR DOING
<br /> (B) COMPREHENSIVE AUTOMOBILE LIABILITY INSURANCE COVERING ALL METAL, CAPACITY TAG. THIS: Q
<br /> a '
<br /> OWNED, HIRED, OR OTHERWISE OPERATED NON-OWNED VEHICLES WITH Q W �' Q
<br /> A MINIMUM COMBINED SINGLE LIMIT OF $1,000,000 EACH PIPING 1. WRAP A PROTECTIVE MATERIAL: SUCH AS EMERY CLOTH, RUBBER,
<br /> OCCURANCE (OR THE EQUIVALENT) FOR BODILY INJURY AND OR HEAVY CLOTH (CANVASS; ETC. ): AROUND THE PIPE WHERE THE
<br /> PROPERTY DAMAGE AND, PIPEWORK OVER TANKS OR UNDER BUILDING FLOORS SHALL BE AVOIDED. PIPE STEEL VISE JAWS WILL ENGAGE. O
<br /> UNDER CONCRETE SLABS SHALL 138 LIMITED ' TO THE MINIMUM REQUIRED TO 0 �,
<br /> (C) (i) WORKERS' COMPENSATION INSURANCE AS REQUIRED BY LAW, REACH DISPENSERS. STREET ELLS AND THREAD NIPPLES SHALL NOT BE USED. 2. POSITION THE PIP$ SO THAT 14-INCHES OF PIPE EXTEND FROM THE O�.o
<br /> COVERING ALL STATES OF OPERATION, AND, PIPELINES SHALL BE PLACED IN STRAIGHT RUNS, USING PIPE FITTINGS AS VISE JAWS, THEN TIGHTEN THE JAWS UNTIL SNUG. W W
<br /> REQUIRED. PIPELINES SHALL BE BURIED 18" BELOW FINISHED YARD GRADE, a Z 'R
<br /> (11) EMPLOYERS' LIABILITY INSURANCE WITH A MINIMU14 LIMIT OF STEEL PIPELINES SHALL BE BURIED SEPARATE FROM COPPER PIPELINES. 3. INSERT THE TAPERING TOOL MANDREL INTO THE PIPE, X W W V
<br /> $100,000 EACH OCCURRENCE. HORIZONTAL VENT LINES SHALL BE GRADED UNIFORMLY UPWARD FROM TANKS AT
<br /> 1/S' PER LINEAR FOOT MINIMUM, WITHOUT TRAPS, THUS PERMITTING LIQUID 4, WHEN TAPERING THE PIPE, OPERATE THE POWERED PIPE-THREADING Uj Q
<br /> HAVE THE RIGHT TO REQUIRE CONTRACTOR TO CHANGE TEE
<br /> COMPANY SHALL TO DRAIN INTO TANKS. VERTICAL LINES. PLACEWD AGAINST EXTERIOR WALL OF - MACHINE IN THE "REVERSE" DIRECTION ONLY. -
<br /> MINIMUM LIMITS OF SUCH COVERAGE, SUBROGATION AGAINST COMPANY SHALL BUILDING SHALL BE SPECED AS SHOWN AND SECURELY ATTACHED TO WALL.
<br /> BS WAIVED AS RESPECTS WORKERS' COMPENSATION AND EMPLOYERS' LIABILITY VERTICAL LINES AT BUILDING SHALL TERMINATE )j' - 6" z ABOVE PARAPET OR 5. AT THE START, TAKE A LIGHT CUT, THE GRADUALLY INCREASE THE O
<br /> INSURANCE, EXCEPT IN MATTERS SHOWN BY FINAL JUDGEMENT TO HAVE BEEN EAVB WITHOUT VENT CAP OR OTHER FITTING. FEED RATE.
<br /> CAUSED BY THE SOLE NEGLIGENCE-OF THE COMPANY. THE INSURANCE REQUIRED -
<br /> UNDER PARAGRAPH ( ) . FURTHER, THE INSURANCE TO BE CARRIED SHALL BE SPECIAL- CARE SHALL BE TAKEN TO PREVENT THE INTERMIXING OF STONES, - - 6. A TAPER LENGTH OF 1 1/211 MINIMUM IS NECESSARY. 0
<br /> IN NO WAY LIMITED BY ANY LIMITATIOIJ EXPRESSED IN PARAGRAPH ( ) OF THE DIRT CLODS; OR OTHER DEBRIS WITH THE CLEAN BACKFILL SAND AROUND THE - c LL
<br /> GENERAL . CONTRACT ,:TERMS AND CONDITIONS, NOT ANY LIMITATI6NPLACED ON PIPE, WRAPPED SWING JOINGS AND/O$ PLEXISLE CONNECTORS.
<br /> THE INDEMNITY THEREIN GIVEN AS MATTER OFLAW. i.
<br /> h'Y U
<br /> m
<br /> MMMO c�
<br /> w+ m
<br /> V �
<br /> aQ N
<br /> O
<br /> Q y_
<br /> �/ LL
<br /> N Q
<br /> O O Cm)
<br /> m,N
<br /> j w
<br /> W
<br /> / h 0
<br /> w O d
<br /> w = 0
<br /> � C o 0
<br /> 0
<br /> O
<br /> DIETERICH POST REORDER NO 135893
<br />
|