My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4855
>
2300 - Underground Storage Tank Program
>
PR0506650
>
COMPLIANCE INFO_2012-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:13 PM
Creation date
11/5/2018 8:14:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2015
RECORD_ID
PR0506650
PE
2361
FACILITY_ID
FA0007571
FACILITY_NAME
ARCH ARCO AM PM*
STREET_NUMBER
4855
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17926051
CURRENT_STATUS
01
SITE_LOCATION
4855 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4855\PR0506650\COMPLIANCE INFO 2012-2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12/15/2019 6:58ni FAY. 182523808'11 Guadalupe ,I ECEI VE, B0003I0o Is <br /> Monitoring System Certification <br /> DEC 16 2014 <br /> F. In-Tank Ganging/SIR Equipment: ® Ch k this box if tank gauging is used only for inventory Control.11Chec 'this box if no tank gauging or SIR ergllipment is installed. <br /> This section must be completed if in-tank gauging equipment is use Orperform leak detection monitoring. <br /> Complete the following checklist <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> C Yes ❑ No* Were all tank gauging probes visually inspected for damage end residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product leve]mdbW tested? <br /> C Yes ❑ No* Was accuracy of system water leve]readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> C Ye ❑ Ne* Were all items on the equipment m rnufueturer's maintenance checklist completed? <br /> -4 In the Section H,belmv,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): ❑ Check tris box if LLDs are not installed. <br /> Com tete the follewlh checllist: <br /> ® Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> Q NIA lCheck all nc�t rrp W Simulated leak rate: 19 3 g.p.h.; ❑0.1 g.p.h; ❑0.2 g.pbl <br /> I ® Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ® Yes ❑ No* For mechanical LLbs,docs the LLD restrict product flow if it detects a leak? <br /> ❑ NIA <br /> Yes ❑ No* For electronic LLDs,does like turbine automatically shut off i C the LLD detects a Leak? <br /> ❑ NIA <br /> 13 Yes C No* For eleovonic LLD$,does the turbine automatically shut off ff any portion of the monitoring <br /> Q NIA or disconnected? system is ifisobled <br /> ® Yes ❑ No* For electron.. I..LDs, does due turbine automatically shut off if any petition of the monitoring system <br /> ❑ NIA malfunctions or field a test? <br /> gl <br /> —Yes ❑ NT For electromic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> as ❑ No* Were all items on the equipment manufacturer's mairtonance ohecklia completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> t?'d E96896860Z wneiPledejgepeb eZV1,04l9lOKI <br />
The URL can be used to link to this page
Your browser does not support the video tag.