Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN— PAGE I (One form per&cifity) <br /> TYPE OF ACTION I.NEW PLAN [J'2-CHANGE OF INFORMATION <br /> Rol. <br /> I. FACILITY INFORMATION <br /> FACILITY!p a (Agenry Use On(y) <br /> BUSINESS NAME(Same,as FACILITY NAME) <br /> BUSINESS SITE ADDRESS <br /> ael. CITY ^ <br /> S• J �y RM <br /> II, SPILT. CONTROL AND CLEANUP Wr TIIODS <br /> This plan addresses unsuaprized releases from UST syarems and supplements the emergency reaponSe plata and <br /> Business Plan. procedures in the facilitY's Hazardous Materials <br /> > If ante to do SO, facility personnel will take immediate measures to control Or stop any release(e,g.,activate pump shutroN',CIC.)and,if lucedsery,safely Rmove <br /> remaining hazardous martial-]born the UST system. <br /> > contain Any release to secondary containment will be pumped or otherwise removed within a lime consistent with the ability of the secoe <br /> far thelrthidended pyo,us m dal,but not greater than 30 calendar days,or Sooner if required b the I �Y�ntsidM 3t system co <br /> Absorbent 11 be mtalsgd as)tazatdous w'891e. Y oval a�nay, Recovered hazardous materiels,uNess still suitsble <br /> Y material will be used to contain and clean <br /> efr<ctive or which is no longer intended for use will be managed asahlam dolut waste uN s a aw2ste delertninterials artpo in aceordancematerial ewidl 2]2 CCR too <br /> ".irlfmd tob e <br /> it is non-hanrdolrs. Used absrKbertt material. reusable or waste, will be stored in a properly labeled and <br /> Facility <br /> PNY Waste materia! shall be disposed <br /> > Facility personnel will determine whether any coact removed from secondary containment systems, or from elan-up activity has been in contact with any <br /> hazardous meon iel. If'he water is contaminated,it will be managed as hanardous waste unless a waste determination in accordance with 22 CCR§662452.11 Finds <br /> Ih ll itis tIONharerdous. i(tm wata,.has a petroleum sheen(1.e.,rainbow colors),it is comeminated. A thick Floaring petroleum layer may not necmasrity display <br /> rainbow colors. Waren(hazardous a non-hazardous)front sumps,spill containers,etc,will not be disposed to at"water systems. <br /> > We will review secondany conniwers systema for <br /> I Hazardous material is contact with possible deterioration if any of the following conditions occur. <br /> 2. Seco secondary <br /> containment is not compatible with the material used for secondary coni aimari <br /> rrpery raaltairrCRMt is prone to damage$am any Nuipmam used[o remove or clean <br /> 3. Hazardous material, other than the producliwaste stored in the rima up hazardous materiystem, al collected in secondary eantainmmt; <br /> released ProduaMwastq end the added meRliel or resulting materiel from uchacombinetion ins Plated inside secondary <br /> ble with ad containment to Orem or neutralize <br /> secondary containment, <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean <br /> equipment is Inspected m lean month] puipment kept permanently on-site is listed in rhe 1'4cili s H <br /> Y turd atter each use, lies are rep lenished as needed. Dmbctive e d or <br /> Materials Business Plan. This <br /> E UIPMEN'1'NOT PERMANENTLY ON. equipment cot Ia repaired or replaced a naceaer),. <br /> E UH'MENT SITE BUT AVAILABLE FOR USE IF NEEDED; Com tete oN ifs linable <br /> LOCATION <br /> TI__ r. q Rte. n AVAA,A011 <br /> soroA[A /�LL1W' Rtt C�G. IGoo l� .ZIT L•r. �, p� u coo. <br /> Y� Qs- w <br /> 102. <br /> p1. <br /> azz <br /> RII. Rei <br /> w. <br /> Rln, Its <br /> RK, <br /> M1IJ. <br /> "a' <br /> R23. <br /> RIs. <br /> IV. RESPONSIBLE PERSONS <br /> NAME <br /> THE POLL W2NG PERSOIY(St RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN, <br /> NAMF. /�L� <br /> f/ v" �a <br /> AaA^^z• ^ d� Gjf�� R•1. TITLE �/y! /. `, <br /> NAME C�--� <I. <br /> 0 y wrz I LC <br /> NAME J ryL., Rsz <br /> Ras. T1T'LE <br /> Rss. <br /> V• MONITORING INDICATORS <br /> �eddiIF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL DE MAD <br /> tional system testing or don collection O Inspection by qualified person ❑Recalibration ofequipment E <br /> AS FOLLOWS: <br /> R60. <br /> UST Reapaale Plan(W2lgg)•19 <br />