My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_2008-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4855
>
2300 - Underground Storage Tank Program
>
PR0506650
>
BILLING_2008-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:43 PM
Creation date
11/5/2018 8:14:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2008-2012
RECORD_ID
PR0506650
PE
2361
FACILITY_ID
FA0007571
FACILITY_NAME
ARCH ARCO AM PM*
STREET_NUMBER
4855
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17926051
CURRENT_STATUS
01
SITE_LOCATION
4855 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4855\PR0506650\BILLING 2008-2012.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDIERGROM STORAGE TANK <br /> RESPONSE PLAN—PAGE 1 (Ofie form per facility) <br /> TYPE OF ACTION ❑ 1-NEW PLAN ❑ 2.CHANOEOFINFOW.fATrow <br /> L FACILITY INFORMATION <br /> FACILITY ID k (Agency Use Only) _ <br /> BUSINESS NAM£(Same as PACILi'1'Y NAME) — <br /> AM PM <br /> BUSWESS SI'E ADDRESS nN, C Ra. <br /> s ST- r' R `S7 DC o m Coq s a s <br /> IL SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorised releases from UST systema and supplempuu the emergency respoase plans and procedures in the faeilitya Hazardous Materials <br /> Business Plan, <br /> D IfUdib In do$0,facility personnel will take imm thele measures to control or stop any release(e.&,activate pump shut-Otl;etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST rygem, <br /> D Any feltr In secondary containment will be pumped or othOVIS4 removed within a time consistent With(he ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local ageney. Recovered hazardous materials,imicss still suitable <br /> for their intended use,will be managed as huardous waste. <br /> D AbSOrbent-aaterial will be used In contain and clean up mareScablc SOWS Of bazardoua materials. Absorbent material maybe reused until it becomes too saturated <br /> to be effective, It will then be managed properly.Used absorbent material,rrusable'orwaste,Will be atored in a properly labeled and=led container. <br /> D Facility personnel Will determine whether any water removed from Secondary containment systems, or t}om clean-up activity, bas been in contact with my <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste. If the Water has a petmletun sheen (i.e-, rainbow colors), it is <br /> contaminated. A thick floating petroleum layer may not neee9aerily display rainbow colors, Water(baasrdous or non-hazardous)from stmtps,spill Wnrafmrs,etc. <br /> will not be disposed to sWrm water Systems, <br /> D We will review Secondary containment systems for possible detarion stion if my of the fbUowing conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment <br /> 2, Smonderymnminment is prone w damage from any equipment used to remove or cleanup hazardous material collected fn secondarycontainment; <br /> 3. Hazardous material,other than the product/wastc stored in the primary containment system, is placed inside secondary containment to neat or neutralize <br /> released produWwaste,and the addod material or resulting material from Such a combination is not compatible withsecondary containment. <br /> III. SPILL CONTROL AND CLEAN-IJP EQUIPMENT <br /> PERIODIC MAINTENANCE; Spill C mml and clean- eaeawpment kept pearbacently on-site is listed in the facility's Hazardout Materials Business Plan. Thio <br /> equipment is inspected W Inst monthly,and after each use,Supplies aro replenished as needed, Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ONSITE BUT AVAILABLE FOR USE IF NEEDED: Com Sete 00!Y if a liable <br /> a EQUIPMENT LOCATION AVAILABILITY <br /> RIO. 920. <br /> coo. <br /> RII. x21. <br /> Rt 1. <br /> RI+. R22. R72. <br /> Rtes' R23. Aa3. <br /> RA R24. Rea. <br /> RIS R25. R15. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSONS)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NA-i U . <br /> F� .a .L MTITLE <br /> NAME TITLE �1a A t Lr n R51. <br /> NAME <br /> NAME �+l Rai. TITLE <br /> Rea. <br /> V- INDIRECT FUMRD DETERMINATION <br /> This info is required gpjy when the PreaOnce of the hazardous substance can not be verified directly by the monitoring method used(e.g.,where liquid level <br /> meaauremWls In a lank annular space or Secondary piping aro used m the basis for leak daormination). <br /> THE FOLLOWING STEPS WILL BE TAKEN TO VERIFY THE PRESENCE OR ABSENCE OF HAZARDOUS SUBSTANCE IN THE SECONDARY <br /> CONTAINMENT IF MONITORAIO INDICATES A POSSIBLE UNAUTiIORI2CD RELEASE: <br /> Ra0. <br /> bwfwre-e(9,24/04).1/3 <br /> 60/b0 39da SEES 00ad SVDaVA A BT0E80660Z TZ:ZT 80OZ/LZ/80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.