My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_2010-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
BILLING_2010-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:43 PM
Creation date
11/5/2018 8:17:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2010-2015
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4943\PR0506488\BILLING 2010-2015.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MR&TED PROGRAM CONSOLIDATED FO <br /> UNDERGROUND STORAGE TANK <br /> CERTIFICATION OF INSTALLATION/MODIFICATION <br /> (One form per project.) <br /> I. FACILITY INFORMATION <br /> FACILITY D)#(Agency Use Only) <br /> BUSINESS NAW(s.e„PAM=Na ar DBA-Dom,Baamr„A,) a <br /> 7-Eleven #32190 <br /> BUSINESS SITE ADDRESS 103 1 CITY im <br /> 4943 S. State Hwy 99 Stockton <br /> IL INSTALLATION/MODIFICATION PROJECT DESCRIPTION <br /> TYPE OF PROJECT(Check all that aoolvl 483a. WORK AUTHORIZED UNDER PERMIT 483b. <br /> ❑ L TANK INSTALLATION OR REPLACEMENT (Number or Date): <br /> ❑ 2.PIPING INSTALLATION OR REPLACEMENT <br /> ❑ 3.SUMP INSTALLATION OR REPLACEMENT <br /> ❑ 4.UNDER DISPENSER CONTAINMENT INSTALLATION OR REPLACEMENT <br /> x 5.OTHER <br /> DESCRIPTION OF WORK BEING CERTIFIED: 483. <br /> Replaced the Veeder-Root EPP memory board and cold start and retest. <br /> M. CONTRACTOR INFORMATION <br /> NAME OF CONTRACTOR WHO PERFORMED INSTALLATION/MODIFICATION 482a. <br /> Walton Engineering, Inc. <br /> CONTRACTOR LICENSE# 4826- ICC CERTIFICATION# 482. <br /> 617238 5243762-U1 <br /> IV.CERTIFICATION <br /> I certify that the information provided herein is true,accurate,and that the following conditions have been satisfied: <br /> • The installer has met the requirements set forth in 23 CCR§2715,subdivisions(g)and(h). <br /> • The underground storage tank, any primary piping, and any secondary containment was installed according to applicable <br /> voluntary consensus standards and any manufacturer's written installation instructions. <br /> • All work listed in the manufacturer's installation checklist has been completed. <br /> • The installation has been inspected and approved by the local agency, or if required by the local agency, inspected and certified <br /> by a registered professional engineer having education and ex erience with underground storage tanks stem installations. <br /> SIGNATURE OF TANK OWNER OR OWNER'S AGENT DATE 484. PHONE 48z <br /> (916) 373-1166 <br /> CERTIFIER'S NAME(print) 485 CERTIFIER'S TITLE: 486. <br /> Dulcinea Webb Compliance Manager <br /> NAME OF CERTIFIER'S EMPLOYER(DBA) 488 CERTIFIER'S RELATIONSHIP TO TANK OWNER 489. <br /> Walton Engineering, Inc. ❑ 1.TANK OWNER ❑ 2.TANK OPERATOR <br /> ❑ 3.CONTRACTOR ❑ 4.PROPERTY OWNER <br /> X 5.OTHER AUTHORIZED AGENT OF TANK OWNER <br /> UPCF UST-C-1/2 Rev.(12/2007) <br />
The URL can be used to link to this page
Your browser does not support the video tag.