Laserfiche WebLink
IED PROGRAM CONSOLIDATED FO <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - (Page 1 of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION 490 <br /> -1' <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 4%2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) �- <br /> BUSINESS NAME(Same as Facility Name or DBA) 7-Eleven # 32190 <br /> BUSINESS SITE ADDRESS 103. CITY 1a. <br /> 4943 S. Kingsley Stockton <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> ,by the,eqtupment manufacturersinstructions or annually whichever,is more frequent Such work must be performed by qualified personnel.f23 ccR 42632.2634 2638>6al l <br /> . .. IIID___ _ <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(Specify): 490 3e. <br /> Q P Yk 4�t-3b. <br /> III. MONITORING LOCATIONS <br /> ❑ L NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN E 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED 123 CCR§36».36341 4904, <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) th tap fu <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.123 CCR§3632.26341 <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY X b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 400-6. <br /> PANEL MANUFACTURER: Veeder-Root 490-7. MODEL#: TLS-350 490.8" <br /> _ LEAK SENSOR MANUFACTURER: Veeder-Root 490-1. MODEL#(S): 794380-302 4v 10. <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).123 ccR§z6431 -490--4 <br /> PANEL MANUFACTURER: 490-12. MODEL#: 4WI3. <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 4017. <br /> _..___.....__PROGRAMMED TESTS0_a.0.1 8_P_h____......___❑_b_0_2 g-p-bc______......._ c.OTHER 490-IS. <br /> pecify):_(S .,. ...__4.929.____ <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 ccR§2U6.11 4o-20. <br /> ..... ......................______..__________ _..__. .........__ ______________-___ ............. _______ <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[23 ccR 42645] TESTING PERIOD: ❑ a.36 HOURS [Ib.60 HOURS 490-21. <br /> _______ --------------.. _............__. -49022_ <br /> ® 5.TANK INTEGRITY TESTING PER R3 CCR§2643.11 490-23. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ® c.OTHER(Specify) SB989 every 36 months 4W-M. <br /> 490-25. <br /> ® 99 OTHER(Specify): Overfill protection-Flapper4490 6. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) t(hca ack'1ll <br /> 01 CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITII AUDIBLE R VISUAL ALARMS. 490-28. <br /> I23 CCR SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 49x29. <br /> $2636] <br /> PANEL MANUFACTURER:Veeder-Root 490-30. MODEL#: TLS-350 490-31. <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 49x32' MODEL#(s): 794380-208 490.33, <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ® a.YES ❑ b.NO 490.34. <br /> FAB,UREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 4-435. <br /> _DIET.. .._____ _ ..... .....______ .__ ________ _ <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MELD)THAT ROUTINELY PERFORMS 3.0 g.p h LEAK TESTS AND RESTRICTS OR SHUTS OFF 4 -36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.In CCR§26361 <br /> MLLD MANUFACTURER(S): 490-31. MODEL#(S): 49x38. <br /> ..............................._____________..____.._..... IIID___ <br /> ® 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.123 CCR§26361 490-39. <br /> ELLD MANUFACTURER(S):Veeder-Root 490-40. MODEL#(S): PLLD 490.41. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINUAUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 490-42. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490°3' <br /> ELLD FAILUREIDISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 49-444. <br /> __ __.__---------------------------------------............................ <br /> ® 4.PIPE INTEGRITY TESTING. 49,045. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ® c.OTHER(Specify) SB989 every 36 mo. 4q 4W-46. <br /> _......__........____._________ <br /> ❑ 5.VISUAL PIPE MONITORING. 490-48. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED. 490-49. <br /> ____................__-._-.__,.._.-_ IIID-___ -.,-.___*Allowetl for moonanng of unburied emer3eniy�enerarorPoPl�,onlyper HSC§3-tl15(b)(3),. ._._.____ <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR 3'-636(4X3)1 090-50. <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 090-s1. <br /> .. ........ ................. ............. .... ....._.._ ._.._....... ........ -,--. _...... ............. <br /> ❑ 99.OTHER(Specify) 490 s3. <br /> UPCF UST-D(1217007)-114 www.unido".org <br />