Laserfiche WebLink
SWRCB,Janyary 2002 <br /> •5. SECONDARY PIPE TESTING Page 2 <br /> Test Method Developed By: ❑% Tank Manufacturer Industry Standard El Professional Engineer <br /> 0 Other (Spec) <br /> Test Method Used: ❑x Pressure Vacuum Hydrostatic <br /> ❑ Other (Specify) <br /> Test Equipment Used: gauge Equipment Resolution: .2opsi <br /> piping Run# 5 MID PLUSA Piping Run# Piping Run# Piping Run# <br /> Piping Material: f lex <br /> Piping Manufacturer: environ <br /> Piping Diameter: 2-- <br /> Length <br /> "Length of Piping Run: 245 - <br /> Product <br /> 45 -Product Stored: MIDGRADE <br /> Method and location of sump <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5min <br /> starting test: <br /> Test Start Time: 9:3 0 <br /> Initial Reading(RI ): 5ps i <br /> Test End Time: 10:3 0 <br /> Final Reading(RF ): 5psi <br /> Test Duration: 1hr <br /> Change in Reading(RF-Rl ): 0 <br /> Pass/Fail Threshold or o <br /> Criteria: <br /> Test Result: Pass ❑ Fail Pass Fail Pass Fail Pass Fail <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />