My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 8:17:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2009
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4943\PR0506488\COMPLIANCE INFO 2008-2009.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Executive Order VR-202-D <br /> Healy Phase II EVR System <br /> Including Veeder-Root ISD <br /> Exhibit 2 <br /> System Specifications <br /> This exhibit contains the installation, maintenance and compliance standards and <br /> specifications that apply to the Healy Phase II EVR System Including Veeder-Root <br /> ISD installed in a gasoline dispensing facility. All components must be installed in <br /> accordance with the specifications in the ARB Approved Installation, Operation and <br /> Maintenance Manual. Installation, maintenance and repair of system components, <br /> including removal and installation of such components in the course of any required <br /> tests, shall be performed by technicians certified by the appropriate manufacturer. <br /> Nozzle <br /> 1. A vapor collection boot shall be installed on the nozzle at the base of the spout, as <br /> shown in Figure 2B-1. <br /> 2. The Healy Model 900 nozzle has an integral vapor valve which prevents the loss of <br /> vapor from the underground storage tanks, ensures proper operation of the system <br /> and prevents the ingestion of air into the system. Any dispenser that has a nozzle <br /> installed that is determined to have a defective vapor valve, as described in items <br /> 2.1 or 2.2 below, shall be immediately removed from service (including nozzle(s) <br /> on both sides of dispenser) and a call for repair made immediately. <br /> 2.1. The maximum allowable leak rate for the nozzle vapor path, as <br /> determined by TP-201.28, shall not exceed the following: <br /> 0.038 cubic feet per hour(CFH) at a pressure of two inches water column <br /> (2.00" wc), and <br /> 0.10 CFH at a vacuum of one hundred inches water column (A 00.00" wc) <br /> 2.2. Verification of the integrity of the vapor valve can be performed on <br /> installed nozzles using the nozzle bag test procedure In Exhibit 7. <br /> Vapor Collection <br /> 1. The V/L ratio of the system shall be 1.05 plus or minus 0.10 (0.95 to 1.15), <br /> measured at a flow rate between six and ten gallons per minute (6.0— 10.0 gpm). <br /> Any fueling point whose V/L ratio is determined to be at or below 0.80 shall be <br /> deemed defective and removed from service. The V/L ratio shall be determined by <br /> using the test procedure in Exhibit 5 with the shut-off port excluded, or with an ARB <br /> approved alternate test procedure. See Section 7 of Exhibit 5 for guidance on V/L <br /> adjustment. <br /> Healy Phase 11 EVR System Including Veeder-Root ISD, Exhibit 2—VR-202-D <br />
The URL can be used to link to this page
Your browser does not support the video tag.